- Date Received:
- 15/12/2022
- Last Action:
- 15/12/2022
- Application Type:
- SDZ Application - Clonburris
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Cairn Homes Properties Ltd.
- Location:
- Within the townland of Cappagh, Clonburris, Dublin 22
- Proposed Development:
- Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two oom apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
- Decision Due:
- 20/02/2023
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
15/12/2022 | Acknowledgement / Validation Letter | Adobe PDF |
15/12/2022 |
Application - Cover Letter
& Document schedule |
Adobe PDF |
15/12/2022 | Application Form - Part A | Adobe PDF |
15/12/2022 | Contiguous Building Elevations | Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Watermain Layout |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Drainage Layout |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Surface Water Catchment Plan |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Drainage Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Drainage Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Drainage Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Drainage Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Attenuation Area Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Construction Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Construction Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Construction Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Typical Construction Details |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Infrastructure Design Report |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Construction & Environmental Management Plan |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Infrastructure Design Report |
Adobe PDF |
15/12/2022 |
Drainage Network Drawings
Preliminary Construction & Environmental Manag. |
Adobe PDF |
15/12/2022 |
Drawings-General
Block G Part V |
Adobe PDF |
15/12/2022 |
Drawings-General
Block G Part 5 |
Adobe PDF |
15/12/2022 |
EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt. |
Adobe PDF |
15/12/2022 |
EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt. |
Adobe PDF |
15/12/2022 |
EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt. |
Adobe PDF |
15/12/2022 |
Elevations
contex |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard 4 |
Adobe PDF |
15/12/2022 |
Elevations
Block H |
Adobe PDF |
15/12/2022 |
Elevations
contex |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard Block A |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard 1 Block A 301 |
Adobe PDF |
15/12/2022 |
Elevations
2 Block B & D Elevs |
Adobe PDF |
15/12/2022 |
Elevations
Block 2 B& D Internal Elevs |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard 2 Block C Elevations |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard 3 block F |
Adobe PDF |
15/12/2022 |
Elevations
Courtyard 3 Intern Elevs |
Adobe PDF |
15/12/2022 |
Elevations
Internal Block 3 EF |
Adobe PDF |
15/12/2022 |
Elevations
Block 4 GH |
Adobe PDF |
15/12/2022 |
Floor Plans
First floor A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Second A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Third A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Block A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Fifth A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Sixth A,B,C,D |
Adobe PDF |
15/12/2022 |
Floor Plans
Block E,F ground |
Adobe PDF |
15/12/2022 |
Floor Plans
Second E,F |
Adobe PDF |
15/12/2022 |
Floor Plans
E, F Fourth |
Adobe PDF |
15/12/2022 |
Floor Plans
E,F, Fifth floor |
Adobe PDF |
15/12/2022 |
Floor Plans
Fifth floor E,F |
Adobe PDF |
15/12/2022 |
Floor Plans
E & F Sixth floor |
Adobe PDF |
15/12/2022 |
Floor Plans
G,H ground floor |
Adobe PDF |
15/12/2022 |
Floor Plans
G,H, First floor |
Adobe PDF |
15/12/2022 |
Floor Plans
G,H Second floor |
Adobe PDF |
15/12/2022 |
Floor Plans
G,H Third floor |
Adobe PDF |
15/12/2022 |
Floor Plans
Block G Elevations & Sections |
Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 | Landscape Plans | Adobe PDF |
15/12/2022 |
Landscape Plans
Planning Report |
Adobe PDF |
15/12/2022 |
Landscape Plans
Landscape Works Specifications and Management Plan |
Adobe PDF |
15/12/2022 | Newspaper Notice | Adobe PDF |
15/12/2022 |
Other Assessments
Planning Report |
Adobe PDF |
15/12/2022 |
Other Assessments
Design Statement |
Adobe PDF |
15/12/2022 |
Other Assessments
T2 HQA |
Adobe PDF |
15/12/2022 |
Other Assessments
Cairn Clonburris T2 RWMP |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris T2 Acoustic Design Statement |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris T2 Operational Waste Management Plan |
Adobe PDF |
15/12/2022 |
Other Assessments
Construction & Environmental Plan (prelim) |
Adobe PDF |
15/12/2022 |
Other Assessments
Daylight Sunlight and Overshadowing Study |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris Arboricultural Report |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris T2 Tree Constraints Plan |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris T2 Tree Impacts Plan |
Adobe PDF |
15/12/2022 |
Other Assessments
Clonburris T2 Tree Protection Plan |
Adobe PDF |
15/12/2022 |
Other Assessments
Energy and Sustainability Report & Site Services |
Adobe PDF |
15/12/2022 |
Other Assessments
Energy and Sustainability Report & Site Services |
Adobe PDF |
15/12/2022 |
Other Assessments
Public Lighting Layout |
Adobe PDF |
15/12/2022 |
Other Assessments
Public Lighting Calculation Report |
Adobe PDF |
15/12/2022 | Photo Montage | Adobe PDF |
15/12/2022 |
Plans, Sections, Elevations
E,F Roof plan |
Adobe PDF |
15/12/2022 |
Plans, Sections, Elevations
Roof plan G H |
Adobe PDF |
15/12/2022 |
Plans, Sections, Elevations
Bins & Bikes |
Adobe PDF |
15/12/2022 |
Plans, Sections, Elevations
Block G Part V |
Adobe PDF |
15/12/2022 |
Road Layout Plan
Road Layout |
Adobe PDF |
15/12/2022 |
Sections
Block A |
Adobe PDF |
15/12/2022 |
Sections
B & D |
Adobe PDF |
15/12/2022 |
Sections
Block B & D |
Adobe PDF |
15/12/2022 |
Sections
E & F |
Adobe PDF |
15/12/2022 |
Sections
Block G & H |
Adobe PDF |
15/12/2022 |
Site Layout
ex |
Adobe PDF |
15/12/2022 | Site Layout | Adobe PDF |
15/12/2022 |
Site Layout
SDCC taking in charge |
Adobe PDF |
15/12/2022 |
Site Layout
Roof plan A,B,C,D |
Adobe PDF |
15/12/2022 |
Site Layout
Courtyard 1 Block A 302 |
Adobe PDF |
15/12/2022 |
Site Layout
Courtyard 2 Block B,C,D elevs |
Adobe PDF |
15/12/2022 |
Site Layout
Part 5 |
Adobe PDF |
15/12/2022 | Site location map | Adobe PDF |
15/12/2022 | Site location map | Adobe PDF |
15/12/2022 | Site Notice | Adobe PDF |
15/01/2023 |
Floor Plans
E F Second |
Adobe PDF |
16/01/2023 |
Report Received from External Body
T.I.I. |
Adobe PDF |
26/01/2023 |
Report Received from External Body
E.H.O. |
Adobe PDF |
27/01/2023 |
Report Received from External Body
South Dublin Childcare Committee |
Adobe PDF |
30/01/2023 |
Report Received from External Body
Dept of Housing Local Government & Heritage |
Adobe PDF |
31/01/2023 |
Report Received from External Body
I. A. A. |
Adobe PDF |
06/02/2023 |
Report Received from External Body
Irish Water |
Adobe PDF |
10/02/2023 |
Report Received from Internal Staff
Roads |
Adobe PDF |
10/02/2023 |
Report Received from Internal Staff
Roads |
Adobe PDF |
13/02/2023 |
Report Received from Internal Staff
Housing Procurement Part V |
Adobe PDF |
17/02/2023 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
17/02/2023 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
12/07/2023 |
FI period extension request
Time Extension for Further Information |
Adobe PDF |
13/07/2023 |
Notification of Decision Letters
FI Time Extension |
Adobe PDF |
14/07/2023 |
Chief Executives Order
FI Time Extension |
Adobe PDF |
24/07/2023 |
F.I. Receipt Ack. Letter
S.D.C.C. A.I. ack. letter |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Agent's cover letter |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Letter from applicant |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Little Rainbows Creche letter |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Archt's drawing schedule |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Site layout plan. |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Site Contextual Elevations (x 3) |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Site Contextual Elevations (x 3) |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Site Contextual Elevations (x 3) |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D Ground Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A,B, C & D 1st Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B C & D 2nd Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D 3rd floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D 4th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D 5th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D 6th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks A, B, C & D Roof plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F ground floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F 1st Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F 2nd Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F 3rd Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F 4th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F 5th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E. & F. 6th Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F Roof plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H Ground floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H 1st Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H 2nd Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H 3rd Floor plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H Roof plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Block A Section plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks B & D Sections |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Block C Section plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks E & F Section plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Blocks G & H Section plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 1 Block A Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 1 Block A Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard Block A Internal Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 2 Blocks B & D Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 2 Blocks B, C & D Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 2 Block B & D Internal Elevations |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 2 Blocks B & D Internal Elevations |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 2 Block C Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 3 Blocks E & F Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 3 Blocks E 7 F Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 3 Blocks EF Internal Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 3 Blocks EF Internal Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 4 Blocks G & H Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 4 Blocks G & H Elevation plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Courtyard 4 Blocks GH Internal Elevations |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Engr's doc./drawing Schedule |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Watermain layout plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Drainage layout plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Wider Clonburris Drainage Strategy plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Typical Attenuation area detail plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Roads layout plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Clonburris wider movement strategy plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Typical Construction details plan. Sh.3 |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Engr's response to A.I. request |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Stage 2 Road Safety Audit rpt. |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
L'scape Archt's response to A.I. request |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
L'scape Archt's drawing Schedule |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Landscape Masterplan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Main Axis plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Urban park plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Blocks F & G Courtyards plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Block A Courtyard plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Blocks B, C & D Courtyard plans |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Masterplan - Landmark Building plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
L'scape Sections (1/2) plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
L'scape Sections (2/2) plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Soft Landscape plan |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Archaeological Assessment report |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Aeronautical Assessment report |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
RFI memo item 2 |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
IES lighting cover letter |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Daylight / Sunlight Study report |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Aerial view & CGLs |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Archt's response report |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
Accommodation Schedule summary |
Adobe PDF |
25/07/2023 |
F.I. Received Doc.
ALTU Archt's response to AI request |
Adobe PDF |
03/08/2023 |
Report Received from External Body
Irish Aviation |
Adobe PDF |
09/08/2023 |
Report Received from Internal Staff
Roads AI |
Adobe PDF |
11/08/2023 |
Report Received from External Body
Dept. H&LG |
Adobe PDF |
15/08/2023 |
Report Received from External Body
T.I.I AI |
Adobe PDF |
15/08/2023 |
Report Received from Internal Staff
Water Services AI |
Adobe PDF |
18/09/2023 |
Chief Executives Order
Seek Clarification of Additional Information |
Adobe PDF |
18/09/2023 |
Notification of Decision Letters
Seek Clarification of Additional Information |
Adobe PDF |
06/10/2023 |
F.I. Clarification Letter
Agent Clar. of A.I. Cover Letter |
Adobe PDF |
06/10/2023 |
F.I. Clarification Letter
DBFL Response |
Adobe PDF |
06/10/2023 |
F.I. Received Doc.
Doc & Drawing Issue Register |
Adobe PDF |
06/10/2023 |
F.I. Received Doc.
C. AI - Drainage Layout |
Adobe PDF |
06/10/2023 |
F.I. Received Doc.
C. AI Surface Water Catchment Plan |
Adobe PDF |
06/10/2023 |
F.I. Received Doc.
C. AI Typical Drainage Details Sheet 3 |
Adobe PDF |
06/10/2023 |
F.I. Received Doc.
C. AI Typical Attenuation Area Details |
Adobe PDF |
19/10/2023 |
Report Received from Internal Staff
Water Services Clar AI |
Adobe PDF |
31/10/2023 |
Chief Executives Order
Grant Permission |
Adobe PDF |
31/10/2023 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
31/10/2023 |
Report Received from Internal Staff
CAI Roads |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
22/11/2023 |
Submission
Condition 11 - Naming & Numbering |
Adobe PDF |
28/11/2023 |
Submission
Condition 28(1) |
Adobe PDF |
28/11/2023 |
Submission
Condition 28(1) |
Adobe PDF |
28/11/2023 |
Submission
Condition 28(1) |
Adobe PDF |
28/11/2023 |
Submission
Condition 16 |
Adobe PDF |
28/11/2023 |
Submission
Condition 16 |
Adobe PDF |
28/11/2023 |
Submission
Condition 16 |
Adobe PDF |
28/11/2023 |
Submission
Condition 16 |
Adobe PDF |
28/11/2023 |
Submission
Condition 16 |
Adobe PDF |
28/11/2023 |
Submission
Condition 22 |
Adobe PDF |
28/11/2023 |
Submission
Condition 22 |
Adobe PDF |
28/11/2023 |
Submission
Condition 18 (NFA) |
Adobe PDF |
28/11/2023 |
Submission
Condition 18 (NFA) |
Adobe PDF |
06/12/2023 |
Submission
Condition 27 |
Adobe PDF |
06/12/2023 |
Submission
Condition 27 |
Adobe PDF |
06/12/2023 |
Submission
Condition 27 |
Adobe PDF |
06/12/2023 |
Submission
Condition 27 |
Adobe PDF |
06/12/2023 |
Submission
Condition 20 |
Adobe PDF |
06/12/2023 |
Submission
Condition 20 |
Adobe PDF |
06/12/2023 |
Submission
Condition 14 - NFA |
Adobe PDF |
12/12/2023 |
Submission
Condition 2(a) |
Adobe PDF |
12/12/2023 |
Submission
Condition 2(a) |
Adobe PDF |
05/01/2024 |
Submission Acknowledgment
Conditions 16, 18, 22 & 28(1) |
Adobe PDF |
05/01/2024 |
Submission Acknowledgment
Conditions 16, 18, 22 & 28(1) |
Adobe PDF |
05/01/2024 |
Submission Acknowledgment
Conditions 16, 18, 22 & 28(1) |
Adobe PDF |
05/01/2024 |
Submission Acknowledgment
Conditions 16, 18, 22 & 28(1) |
Adobe PDF |
12/01/2024 |
Submission Acknowledgment
Condition 27 |
Adobe PDF |
15/01/2024 |
Submission
Condition 2(b) |
Adobe PDF |
15/01/2024 |
Submission
Condition 2(b) |
Adobe PDF |
15/01/2024 |
Submission
Condition 2(b) |
Adobe PDF |
15/01/2024 |
Submission Acknowledgment
Condition 20 |
Adobe PDF |
25/01/2024 |
Notification of Decision
Condition 16 - Compliant |
Adobe PDF |
25/01/2024 |
Notification of Decision
Condition 28(1) - Compliant |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
29/01/2024 |
Submission
Condition 17 |
Adobe PDF |
31/01/2024 |
Notification of Decision
Condition 22 - Compliant |
Adobe PDF |
01/02/2024 |
Notification of Decision
Con. 27 - Partially compliant |
Adobe PDF |
06/02/2024 |
Notification of Decision
Condition 20- Not compliant |
Adobe PDF |
08/02/2024 |
Submission Acknowledgment
Condition 2(b) |
Adobe PDF |
15/02/2024 |
Submission
Condition 3(a) & 7 |
Adobe PDF |
15/02/2024 |
Submission
Condition 3(a) & 7 |
Adobe PDF |
15/02/2024 |
Submission
Condition 3(a) & 7 |
Adobe PDF |
16/02/2024 |
Submission Acknowledgment
Condition 17 |
Adobe PDF |
22/02/2024 |
Notification of Decision
Condition 2(a) - Compliant |
Adobe PDF |
26/02/2024 |
Notification of Decision
Condition 17 - Compliant |
Adobe PDF |
06/03/2024 |
Submission Acknowledgment
Condition 3a |
Adobe PDF |
06/03/2024 |
Submission Acknowledgment
Condition 7 |
Adobe PDF |
07/03/2024 |
Notification of Decision
Condition 2(b) - Not compliant |
Adobe PDF |
07/03/2024 |
Submission
E-mail re: Con. 18 (not for agreement by P.A.) |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - Naming & numbering |
Adobe PDF |
13/03/2024 |
Notification of Decision
Condition 11 - continued |
Adobe PDF |
02/04/2024 |
Notification of Decision
Condition 3a - Compliant |
Adobe PDF |
04/04/2024 |
Notification of Decision
Condition 7 - Not compliant |
Adobe PDF |
10/04/2024 |
Submission
Condition 19 |
Adobe PDF |
10/04/2024 |
Submission
Condition 19 |
Adobe PDF |
10/04/2024 |
Submission
Condition 19 |
Adobe PDF |
12/04/2024 |
Submission
Condition 20 |
Adobe PDF |
12/04/2024 |
Submission
Condition 20 |
Adobe PDF |
12/04/2024 |
Submission
Condition 20 |
Adobe PDF |
18/04/2024 |
Submission
Condition 28(3) |
Adobe PDF |
22/04/2024 |
Submission
Condition 2(b) |
Adobe PDF |
22/04/2024 |
Submission
Condition 2(b) |
Adobe PDF |
22/04/2024 |
Submission
Condition 2(b) |
Adobe PDF |
22/04/2024 |
Submission
Condition 2(b) |
Adobe PDF |
22/04/2024 |
Submission
Condition 2(b) |
Adobe PDF |
24/04/2024 |
Submission
Condition 7 |
Adobe PDF |
24/04/2024 |
Submission
Condition 7 |
Adobe PDF |
24/04/2024 |
Submission
Condition 7 |
Adobe PDF |
03/05/2024 |
Submission Acknowledgment
Condition 20 |
Adobe PDF |
09/05/2024 |
Submission Acknowledgment
Condition 28(3) |
Adobe PDF |
09/05/2024 |
Submission Acknowledgment
Condition 2(b) |
Adobe PDF |
17/05/2024 |
Submission Acknowledgment
Condition 7 |
Adobe PDF |
27/05/2024 |
Notification of Decision
Condition 28(3) - Not compliant |
Adobe PDF |
30/05/2024 |
Notification of Decision
Condition 19 - Compliant |
Adobe PDF |
30/05/2024 |
Notification of Decision
Condition 20 - Compliant |
Adobe PDF |
05/06/2024 |
Notification of Decision
Condition 7 - Compliant |
Adobe PDF |
05/06/2024 |
Notification of Decision
Condition 2(b) - Not compliant |
Adobe PDF |
17/06/2024 |
Submission
Condition 15 |
Adobe PDF |
17/06/2024 |
Submission
Condition 15 |
Adobe PDF |
17/06/2024 |
Submission
Condition 15 |
Adobe PDF |
17/06/2024 |
Submission
Condition 15 |
Adobe PDF |
17/06/2024 |
Submission
Condition 15 |
Adobe PDF |
21/06/2024 |
Submission Acknowledgment
Condition 15 |
Adobe PDF |
06/08/2024 |
Submission
Con. 15 - e-mail to agent (NFA by Plan.Auth.) |
Adobe PDF |
15/08/2024 |
Submission
Condition 13(A) |
Adobe PDF |
15/08/2024 |
Submission
Condition 13(A) |
Adobe PDF |
15/08/2024 |
Submission
Condition 13(A) |
Adobe PDF |
27/08/2024 |
Submission Acknowledgment
Condition 13(A) |
Adobe PDF |