View Application SDZ22A/0018

View Application SDZ22A/0018

Date Received:
15/12/2022
Last Action:
15/12/2022
Application Type:
SDZ Application - Clonburris
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
Cairn Homes Properties Ltd.
Location:
Within the townland of Cappagh, Clonburris, Dublin 22
Proposed Development:
Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two oom apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
Decision Due:
20/02/2023

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
15/12/2022 Acknowledgement / Validation Letter Adobe PDF
15/12/2022 Application - Cover Letter
& Document schedule
Adobe PDF
15/12/2022 Application Form - Part A Adobe PDF
15/12/2022 Contiguous Building Elevations Adobe PDF
15/12/2022 Drainage Network Drawings
Watermain Layout
Adobe PDF
15/12/2022 Drainage Network Drawings
Drainage Layout
Adobe PDF
15/12/2022 Drainage Network Drawings
Surface Water Catchment Plan
Adobe PDF
15/12/2022 Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers
Adobe PDF
15/12/2022 Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers
Adobe PDF
15/12/2022 Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers
Adobe PDF
15/12/2022 Drainage Network Drawings
Longitudinal Sections Foul & Storm Sewers
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Drainage Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Drainage Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Drainage Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Drainage Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Attenuation Area Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Construction Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Construction Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Construction Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Typical Construction Details
Adobe PDF
15/12/2022 Drainage Network Drawings
Infrastructure Design Report
Adobe PDF
15/12/2022 Drainage Network Drawings
Construction & Environmental Management Plan
Adobe PDF
15/12/2022 Drainage Network Drawings
Infrastructure Design Report
Adobe PDF
15/12/2022 Drainage Network Drawings
Preliminary Construction & Environmental Manag.
Adobe PDF
15/12/2022 Drawings-General
Block G Part V
Adobe PDF
15/12/2022 Drawings-General
Block G Part 5
Adobe PDF
15/12/2022 EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt.
Adobe PDF
15/12/2022 EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt.
Adobe PDF
15/12/2022 EIAR
Envir. Impact Assessment - Vol 1 Non-Tech.rpt.
Adobe PDF
15/12/2022 Elevations
contex
Adobe PDF
15/12/2022 Elevations
Courtyard 4
Adobe PDF
15/12/2022 Elevations
Block H
Adobe PDF
15/12/2022 Elevations
contex
Adobe PDF
15/12/2022 Elevations
Courtyard Block A
Adobe PDF
15/12/2022 Elevations
Courtyard 1 Block A 301
Adobe PDF
15/12/2022 Elevations
2 Block B & D Elevs
Adobe PDF
15/12/2022 Elevations
Block 2 B& D Internal Elevs
Adobe PDF
15/12/2022 Elevations
Courtyard 2 Block C Elevations
Adobe PDF
15/12/2022 Elevations
Courtyard 3 block F
Adobe PDF
15/12/2022 Elevations
Courtyard 3 Intern Elevs
Adobe PDF
15/12/2022 Elevations
Internal Block 3 EF
Adobe PDF
15/12/2022 Elevations
Block 4 GH
Adobe PDF
15/12/2022 Floor Plans
First floor A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Second A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Third A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Block A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Fifth A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Sixth A,B,C,D
Adobe PDF
15/12/2022 Floor Plans
Block E,F ground
Adobe PDF
15/12/2022 Floor Plans
Second E,F
Adobe PDF
15/12/2022 Floor Plans
E, F Fourth
Adobe PDF
15/12/2022 Floor Plans
E,F, Fifth floor
Adobe PDF
15/12/2022 Floor Plans
Fifth floor E,F
Adobe PDF
15/12/2022 Floor Plans
E & F Sixth floor
Adobe PDF
15/12/2022 Floor Plans
G,H ground floor
Adobe PDF
15/12/2022 Floor Plans
G,H, First floor
Adobe PDF
15/12/2022 Floor Plans
G,H Second floor
Adobe PDF
15/12/2022 Floor Plans
G,H Third floor
Adobe PDF
15/12/2022 Floor Plans
Block G Elevations & Sections
Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans Adobe PDF
15/12/2022 Landscape Plans
Planning Report
Adobe PDF
15/12/2022 Landscape Plans
Landscape Works Specifications and Management Plan
Adobe PDF
15/12/2022 Newspaper Notice Adobe PDF
15/12/2022 Other Assessments
Planning Report
Adobe PDF
15/12/2022 Other Assessments
Design Statement
Adobe PDF
15/12/2022 Other Assessments
T2 HQA
Adobe PDF
15/12/2022 Other Assessments
Cairn Clonburris T2 RWMP
Adobe PDF
15/12/2022 Other Assessments
Clonburris T2 Acoustic Design Statement
Adobe PDF
15/12/2022 Other Assessments
Clonburris T2 Operational Waste Management Plan
Adobe PDF
15/12/2022 Other Assessments
Construction & Environmental Plan (prelim)
Adobe PDF
15/12/2022 Other Assessments
Daylight Sunlight and Overshadowing Study
Adobe PDF
15/12/2022 Other Assessments
Clonburris Arboricultural Report
Adobe PDF
15/12/2022 Other Assessments
Clonburris T2 Tree Constraints Plan
Adobe PDF
15/12/2022 Other Assessments
Clonburris T2 Tree Impacts Plan
Adobe PDF
15/12/2022 Other Assessments
Clonburris T2 Tree Protection Plan
Adobe PDF
15/12/2022 Other Assessments
Energy and Sustainability Report & Site Services
Adobe PDF
15/12/2022 Other Assessments
Energy and Sustainability Report & Site Services
Adobe PDF
15/12/2022 Other Assessments
Public Lighting Layout
Adobe PDF
15/12/2022 Other Assessments
Public Lighting Calculation Report
Adobe PDF
15/12/2022 Photo Montage Adobe PDF
15/12/2022 Plans, Sections, Elevations
E,F Roof plan
Adobe PDF
15/12/2022 Plans, Sections, Elevations
Roof plan G H
Adobe PDF
15/12/2022 Plans, Sections, Elevations
Bins & Bikes
Adobe PDF
15/12/2022 Plans, Sections, Elevations
Block G Part V
Adobe PDF
15/12/2022 Road Layout Plan
Road Layout
Adobe PDF
15/12/2022 Sections
Block A
Adobe PDF
15/12/2022 Sections
B & D
Adobe PDF
15/12/2022 Sections
Block B & D
Adobe PDF
15/12/2022 Sections
E & F
Adobe PDF
15/12/2022 Sections
Block G & H
Adobe PDF
15/12/2022 Site Layout
ex
Adobe PDF
15/12/2022 Site Layout Adobe PDF
15/12/2022 Site Layout
SDCC taking in charge
Adobe PDF
15/12/2022 Site Layout
Roof plan A,B,C,D
Adobe PDF
15/12/2022 Site Layout
Courtyard 1 Block A 302
Adobe PDF
15/12/2022 Site Layout
Courtyard 2 Block B,C,D elevs
Adobe PDF
15/12/2022 Site Layout
Part 5
Adobe PDF
15/12/2022 Site location map Adobe PDF
15/12/2022 Site location map Adobe PDF
15/12/2022 Site Notice Adobe PDF
15/01/2023 Floor Plans
E F Second
Adobe PDF
16/01/2023 Report Received from External Body
T.I.I.
Adobe PDF
26/01/2023 Report Received from External Body
E.H.O.
Adobe PDF
27/01/2023 Report Received from External Body
South Dublin Childcare Committee
Adobe PDF
30/01/2023 Report Received from External Body
Dept of Housing Local Government & Heritage
Adobe PDF
31/01/2023 Report Received from External Body
I. A. A.
Adobe PDF
06/02/2023 Report Received from External Body
Irish Water
Adobe PDF
10/02/2023 Report Received from Internal Staff
Roads
Adobe PDF
10/02/2023 Report Received from Internal Staff
Roads
Adobe PDF
13/02/2023 Report Received from Internal Staff
Housing Procurement Part V
Adobe PDF
17/02/2023 Chief Executives Order
Request Additional Information
Adobe PDF
17/02/2023 Notification of Decision Letters
Request Additional Information
Adobe PDF
12/07/2023 FI period extension request
Time Extension for Further Information
Adobe PDF
13/07/2023 Notification of Decision Letters
FI Time Extension
Adobe PDF
14/07/2023 Chief Executives Order
FI Time Extension
Adobe PDF
24/07/2023 F.I. Receipt Ack. Letter
S.D.C.C. A.I. ack. letter
Adobe PDF
25/07/2023 F.I. Received Doc.
Agent's cover letter
Adobe PDF
25/07/2023 F.I. Received Doc.
Letter from applicant
Adobe PDF
25/07/2023 F.I. Received Doc.
Little Rainbows Creche letter
Adobe PDF
25/07/2023 F.I. Received Doc.
Archt's drawing schedule
Adobe PDF
25/07/2023 F.I. Received Doc.
Site layout plan.
Adobe PDF
25/07/2023 F.I. Received Doc.
Site Contextual Elevations (x 3)
Adobe PDF
25/07/2023 F.I. Received Doc.
Site Contextual Elevations (x 3)
Adobe PDF
25/07/2023 F.I. Received Doc.
Site Contextual Elevations (x 3)
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D Ground Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A,B, C & D 1st Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B C & D 2nd Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D 3rd floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D 4th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D 5th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D 6th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks A, B, C & D Roof plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F ground floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F 1st Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F 2nd Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F 3rd Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F 4th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F 5th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E. & F. 6th Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F Roof plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H Ground floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H 1st Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H 2nd Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H 3rd Floor plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H Roof plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Block A Section plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks B & D Sections
Adobe PDF
25/07/2023 F.I. Received Doc.
Block C Section plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks E & F Section plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Blocks G & H Section plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 1 Block A Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 1 Block A Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard Block A Internal Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 2 Blocks B & D Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 2 Blocks B, C & D Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 2 Block B & D Internal Elevations
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 2 Blocks B & D Internal Elevations
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 2 Block C Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 3 Blocks E & F Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 3 Blocks E 7 F Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 3 Blocks EF Internal Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 3 Blocks EF Internal Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 4 Blocks G & H Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 4 Blocks G & H Elevation plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Courtyard 4 Blocks GH Internal Elevations
Adobe PDF
25/07/2023 F.I. Received Doc.
Engr's doc./drawing Schedule
Adobe PDF
25/07/2023 F.I. Received Doc.
Watermain layout plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Drainage layout plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Wider Clonburris Drainage Strategy plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Typical Attenuation area detail plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Roads layout plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Clonburris wider movement strategy plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Typical Construction details plan. Sh.3
Adobe PDF
25/07/2023 F.I. Received Doc.
Engr's response to A.I. request
Adobe PDF
25/07/2023 F.I. Received Doc.
Stage 2 Road Safety Audit rpt.
Adobe PDF
25/07/2023 F.I. Received Doc.
L'scape Archt's response to A.I. request
Adobe PDF
25/07/2023 F.I. Received Doc.
L'scape Archt's drawing Schedule
Adobe PDF
25/07/2023 F.I. Received Doc.
Landscape Masterplan
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Main Axis plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Urban park plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Blocks F & G Courtyards plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Block A Courtyard plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Blocks B, C & D Courtyard plans
Adobe PDF
25/07/2023 F.I. Received Doc.
Masterplan - Landmark Building plan
Adobe PDF
25/07/2023 F.I. Received Doc.
L'scape Sections (1/2) plan
Adobe PDF
25/07/2023 F.I. Received Doc.
L'scape Sections (2/2) plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Soft Landscape plan
Adobe PDF
25/07/2023 F.I. Received Doc.
Archaeological Assessment report
Adobe PDF
25/07/2023 F.I. Received Doc.
Aeronautical Assessment report
Adobe PDF
25/07/2023 F.I. Received Doc.
RFI memo item 2
Adobe PDF
25/07/2023 F.I. Received Doc.
IES lighting cover letter
Adobe PDF
25/07/2023 F.I. Received Doc.
Daylight / Sunlight Study report
Adobe PDF
25/07/2023 F.I. Received Doc.
Aerial view & CGLs
Adobe PDF
25/07/2023 F.I. Received Doc.
Archt's response report
Adobe PDF
25/07/2023 F.I. Received Doc.
Accommodation Schedule summary
Adobe PDF
25/07/2023 F.I. Received Doc.
ALTU Archt's response to AI request
Adobe PDF
03/08/2023 Report Received from External Body
Irish Aviation
Adobe PDF
09/08/2023 Report Received from Internal Staff
Roads AI
Adobe PDF
11/08/2023 Report Received from External Body
Dept. H&LG
Adobe PDF
15/08/2023 Report Received from External Body
T.I.I AI
Adobe PDF
15/08/2023 Report Received from Internal Staff
Water Services AI
Adobe PDF
18/09/2023 Chief Executives Order
Seek Clarification of Additional Information
Adobe PDF
18/09/2023 Notification of Decision Letters
Seek Clarification of Additional Information
Adobe PDF
06/10/2023 F.I. Clarification Letter
Agent Clar. of A.I. Cover Letter
Adobe PDF
06/10/2023 F.I. Clarification Letter
DBFL Response
Adobe PDF
06/10/2023 F.I. Received Doc.
Doc & Drawing Issue Register
Adobe PDF
06/10/2023 F.I. Received Doc.
C. AI - Drainage Layout
Adobe PDF
06/10/2023 F.I. Received Doc.
C. AI Surface Water Catchment Plan
Adobe PDF
06/10/2023 F.I. Received Doc.
C. AI Typical Drainage Details Sheet 3
Adobe PDF
06/10/2023 F.I. Received Doc.
C. AI Typical Attenuation Area Details
Adobe PDF
19/10/2023 Report Received from Internal Staff
Water Services Clar AI
Adobe PDF
31/10/2023 Chief Executives Order
Grant Permission
Adobe PDF
31/10/2023 Notification of Decision Letters
Grant Permission
Adobe PDF
31/10/2023 Report Received from Internal Staff
CAI Roads
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
22/11/2023 Submission
Condition 11 - Naming & Numbering
Adobe PDF
28/11/2023 Submission
Condition 28(1)
Adobe PDF
28/11/2023 Submission
Condition 28(1)
Adobe PDF
28/11/2023 Submission
Condition 28(1)
Adobe PDF
28/11/2023 Submission
Condition 16
Adobe PDF
28/11/2023 Submission
Condition 16
Adobe PDF
28/11/2023 Submission
Condition 16
Adobe PDF
28/11/2023 Submission
Condition 16
Adobe PDF
28/11/2023 Submission
Condition 16
Adobe PDF
28/11/2023 Submission
Condition 22
Adobe PDF
28/11/2023 Submission
Condition 22
Adobe PDF
28/11/2023 Submission
Condition 18 (NFA)
Adobe PDF
28/11/2023 Submission
Condition 18 (NFA)
Adobe PDF
06/12/2023 Submission
Condition 27
Adobe PDF
06/12/2023 Submission
Condition 27
Adobe PDF
06/12/2023 Submission
Condition 27
Adobe PDF
06/12/2023 Submission
Condition 27
Adobe PDF
06/12/2023 Submission
Condition 20
Adobe PDF
06/12/2023 Submission
Condition 20
Adobe PDF
06/12/2023 Submission
Condition 14 - NFA
Adobe PDF
12/12/2023 Submission
Condition 2(a)
Adobe PDF
12/12/2023 Submission
Condition 2(a)
Adobe PDF
05/01/2024 Submission Acknowledgment
Conditions 16, 18, 22 & 28(1)
Adobe PDF
05/01/2024 Submission Acknowledgment
Conditions 16, 18, 22 & 28(1)
Adobe PDF
05/01/2024 Submission Acknowledgment
Conditions 16, 18, 22 & 28(1)
Adobe PDF
05/01/2024 Submission Acknowledgment
Conditions 16, 18, 22 & 28(1)
Adobe PDF
12/01/2024 Submission Acknowledgment
Condition 27
Adobe PDF
15/01/2024 Submission
Condition 2(b)
Adobe PDF
15/01/2024 Submission
Condition 2(b)
Adobe PDF
15/01/2024 Submission
Condition 2(b)
Adobe PDF
15/01/2024 Submission Acknowledgment
Condition 20
Adobe PDF
25/01/2024 Notification of Decision
Condition 16 - Compliant
Adobe PDF
25/01/2024 Notification of Decision
Condition 28(1) - Compliant
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
29/01/2024 Submission
Condition 17
Adobe PDF
31/01/2024 Notification of Decision
Condition 22 - Compliant
Adobe PDF
01/02/2024 Notification of Decision
Con. 27 - Partially compliant
Adobe PDF
06/02/2024 Notification of Decision
Condition 20- Not compliant
Adobe PDF
08/02/2024 Submission Acknowledgment
Condition 2(b)
Adobe PDF
15/02/2024 Submission
Condition 3(a) & 7
Adobe PDF
15/02/2024 Submission
Condition 3(a) & 7
Adobe PDF
15/02/2024 Submission
Condition 3(a) & 7
Adobe PDF
16/02/2024 Submission Acknowledgment
Condition 17
Adobe PDF
22/02/2024 Notification of Decision
Condition 2(a) - Compliant
Adobe PDF
26/02/2024 Notification of Decision
Condition 17 - Compliant
Adobe PDF
06/03/2024 Submission Acknowledgment
Condition 3a
Adobe PDF
06/03/2024 Submission Acknowledgment
Condition 7
Adobe PDF
07/03/2024 Notification of Decision
Condition 2(b) - Not compliant
Adobe PDF
07/03/2024 Submission
E-mail re: Con. 18 (not for agreement by P.A.)
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - Naming & numbering
Adobe PDF
13/03/2024 Notification of Decision
Condition 11 - continued
Adobe PDF
02/04/2024 Notification of Decision
Condition 3a - Compliant
Adobe PDF
04/04/2024 Notification of Decision
Condition 7 - Not compliant
Adobe PDF