Planning Banner Image

View Application SD22A/0099

View Application SD22A/0099

Date Received:
06/04/2022
Last Action:
06/04/2022
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
Blackwin Limited
Location:
Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
Proposed Development:
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Decision Due:
03/05/2022

Decision Details

Decision Date:
31/05/2022
Decision:
REQUEST ADDITIONAL INFORMATION
Final Grant Date:
N/A

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
06/04/2022 Acknowledgement / Validation Letter
SDCC Ack letter
Adobe PDF
06/04/2022 Application - Cover Letter Adobe PDF
06/04/2022 Application Form - Part A Adobe PDF
06/04/2022 Appropriate Assessment Screening Report Adobe PDF
06/04/2022 Archaeology Report
Archaeological Impact Assessment
Adobe PDF
06/04/2022 Architects Design Statement Adobe PDF
06/04/2022 CGI "Artists Impression" Adobe PDF
06/04/2022 Consent Letter Adobe PDF
06/04/2022 Document & Drawing Issue Register Adobe PDF
06/04/2022 Document Issue Sheet Adobe PDF
06/04/2022 Drawing Issue Sheet Adobe PDF
06/04/2022 Electrical Document Schedule Adobe PDF
06/04/2022 Electrical Services Instalation etc Adobe PDF
06/04/2022 Electrical Services Layout, Site Lighting etc Adobe PDF
06/04/2022 Electrical Services/Site Lighting Layout Adobe PDF
06/04/2022 Elevations
Contiguous
Adobe PDF
06/04/2022 Elevations
Contiguous
Adobe PDF
06/04/2022 Elevations
Unit 1
Adobe PDF
06/04/2022 Elevations
Unit 2
Adobe PDF
06/04/2022 Elevations
Unit 3
Adobe PDF
06/04/2022 Elevations
Unit 4
Adobe PDF
06/04/2022 Elevations
Unit 5A
Adobe PDF
06/04/2022 Elevations
Unit 5B
Adobe PDF
06/04/2022 Elevations
Unit 5C
Adobe PDF
06/04/2022 Elevations
Unit 6
Adobe PDF
06/04/2022 Elevations
Unit 7 - Cafe/Restaurant (NW & NE)
Adobe PDF
06/04/2022 Elevations
Unit 7 - Cafe/Restaurant (SW & SE)
Adobe PDF
06/04/2022 ESB substation Details Adobe PDF
06/04/2022 Fire Tender Access Gate Adobe PDF
06/04/2022 Floor Plans
Unit 1 - Ground & First Floor
Adobe PDF
06/04/2022 Floor Plans
Unit 1 - GA Roof Plans
Adobe PDF
06/04/2022 Floor Plans
Unit 2 - Ground & First Floor
Adobe PDF
06/04/2022 Floor Plans
GA Roof Plans
Adobe PDF
06/04/2022 Floor Plans
Unit 3 - Ground & First Floor
Adobe PDF
06/04/2022 Floor Plans
Unit 3 - GA Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 4 - Ground & First Floor
Adobe PDF
06/04/2022 Floor Plans
Unit 4 - GA Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 5A - Ground,First, Second & Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 5B - Ground, First, Second & Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 5C - Ground, First, Second & Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 6 - Ground & First Floor
Adobe PDF
06/04/2022 Floor Plans
Unit 6 - GA Roof Plan
Adobe PDF
06/04/2022 Floor Plans
Unit 7 - Cafes/Restaurant. GA Ground Floor
Adobe PDF
06/04/2022 Floor Plans
Unit 7 - Cafe/Restaurant - GA Roof Plan
Adobe PDF
06/04/2022 Foul Water Layout Adobe PDF
06/04/2022 Landscape Architects Report Adobe PDF
06/04/2022 Landscape Masterplan Adobe PDF
06/04/2022 Landscape Plans
Soft Landscape Plan & Details
Adobe PDF
06/04/2022 Landscape Plans
Hard Landscape Plan & Details of Boundary
Adobe PDF
06/04/2022 Landscape Plans
Sheet 1 of 3 - Soft Landscape Detais
Adobe PDF
06/04/2022 Landscape Plans
Sheet 2 of 3 - Hard Landscape Details
Adobe PDF
06/04/2022 Landscape Plans
Sheet 2 of 3 - SuDS Details
Adobe PDF
06/04/2022 Newspaper Notice Adobe PDF
06/04/2022 Offsite roads Layout Adobe PDF
06/04/2022 Other Assessments
Flood Risk
Adobe PDF
06/04/2022 Other Assessments
Traffic & Transport
Adobe PDF
06/04/2022 Other Assessments
Mobility Management Plan
Adobe PDF
06/04/2022 Other Assessments
Engineering Services Report
Adobe PDF
06/04/2022 Other Assessments
Engineering Services Report (Continued)
Adobe PDF
06/04/2022 Other Assessments
Ecological Impact Assessment Report
Adobe PDF
06/04/2022 Outline Construction & Demolition Waste Management Adobe PDF
06/04/2022 Planning Report Adobe PDF
06/04/2022 Plans, Sections, Elevations
Bike Shelter Details
Adobe PDF
06/04/2022 Plans, Sections, Elevations
Bin Shelter Details
Adobe PDF
06/04/2022 Plans, Sections, Elevations
Boundary Details (Fence Details)
Adobe PDF
06/04/2022 Preliminary Construction & Env Management Plan Adobe PDF
06/04/2022 Proposed Utilities & Energy Sustainability Report Adobe PDF
06/04/2022 Road Layout & Levels Adobe PDF
06/04/2022 Schedule of Areas Adobe PDF
06/04/2022 Sections
Unit 1 - AA & BB
Adobe PDF
06/04/2022 Sections
Unit 2 - AA & BB
Adobe PDF
06/04/2022 Sections
Unit 3 - AA & BB
Adobe PDF
06/04/2022 Sections
Unit 4 - AA & BB
Adobe PDF
06/04/2022 Sections
Units 5A, 5B & 5C - AA, BB & CC
Adobe PDF
06/04/2022 Sections
Unit 6 - AA & BB
Adobe PDF
06/04/2022 Sections
Unit 7 - Cafe/Restaurant - AA & BB
Adobe PDF
06/04/2022 Sections
Landscape - Sheet 1 of 4
Adobe PDF
06/04/2022 Sections
Landscape - Shhet 2 of 4
Adobe PDF
06/04/2022 Sections
Landscape - Sheet 3 of 4
Adobe PDF
06/04/2022 Sections
Landscape - Sheet 4 of 4
Adobe PDF
06/04/2022 Site layout plan
Proposed
Adobe PDF
06/04/2022 Site layout plan
Proposed
Adobe PDF
06/04/2022 Site Lighting Report Adobe PDF
06/04/2022 Site location map Adobe PDF
06/04/2022 Site Notice Adobe PDF
06/04/2022 Site Services Layout Adobe PDF
06/04/2022 Surface Water Layout Adobe PDF
06/04/2022 Surface Water Standard - Sheet 2 Adobe PDF
06/04/2022 Surface Water Standard - Sheet 3 Adobe PDF
06/04/2022 Surface Water Standard - Sheet 4 Adobe PDF
06/04/2022 Surface Water Standard - Sheet 5 Adobe PDF
06/04/2022 Surface Water standard - Sheet 6 Adobe PDF
06/04/2022 Surface Water Standard - Sheet 7 Adobe PDF
06/04/2022 Surface Water Standard Details - Sheet 1 Adobe PDF
06/04/2022 Watermain Layout Adobe PDF
06/04/2022 Yard Entrance Gate - Unit 1,2,3,4 & 6 Adobe PDF
10/05/2022 Report Received from Internal Staff
Parks
Adobe PDF
11/05/2022 Report Received from Internal Staff
Water Services
Adobe PDF
13/05/2022 Report Received from External Body
I A A
Adobe PDF
16/05/2022 Report Received from External Body
T.I.I.
Adobe PDF
20/05/2022 Report Received from External Body
Irish Water
Adobe PDF
30/05/2022 Report Received from Internal Staff
Forward Planning
Adobe PDF
31/05/2022 Chief Executives Order
Request Additional Information
Adobe PDF
31/05/2022 Notification of Decision Letters
Request Additional Information
Adobe PDF
12/09/2022 F.I. Receipt Ack. Letter
SDCC Ack letter
Adobe PDF
12/09/2022 F.I. Received Doc.
Response
Adobe PDF
12/09/2022 F.I. Received Doc.
Statement Consistency with SDCC Dev Plan 2022-28
Adobe PDF
12/09/2022 F.I. Received Doc.
M & E Response
Adobe PDF
12/09/2022 F.I. Received Doc.
Electrical Document Schedule - FI stage
Adobe PDF
12/09/2022 F.I. Received Doc.
Mechanical & Electrical -Site Services Layout
Adobe PDF
12/09/2022 F.I. Received Doc.
Electrical Services - Site Lighting Layout
Adobe PDF
12/09/2022 F.I. Received Doc.
Electrical Services - Site Lighting Lux Levels etc
Adobe PDF
12/09/2022 F.I. Received Doc.
Electrical Services - Site Lighting - Through Road
Adobe PDF
12/09/2022 F.I. Received Doc.
Document Issue Sheet
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Sections - 1/4
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Sections - 2/4
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Sections - 3/4
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Sections - 4/4
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Masterplan
Adobe PDF
12/09/2022 F.I. Received Doc.
Soft Landscape Plan & Details
Adobe PDF
12/09/2022 F.I. Received Doc.
Hard Landscape Plan & Boundary Treatments
Adobe PDF
12/09/2022 F.I. Received Doc.
Soft Landscape Details - 1/3
Adobe PDF
12/09/2022 F.I. Received Doc.
Hard Landscape Details - 2/3
Adobe PDF
12/09/2022 F.I. Received Doc.
SuDS detail - 3/3
Adobe PDF
12/09/2022 F.I. Received Doc.
Green Infrastructure Report
Adobe PDF
12/09/2022 F.I. Received Doc.
Document & Drawing Issue Register
Adobe PDF
12/09/2022 F.I. Received Doc.
Swept Path analysis - 7.7M Fire Tender
Adobe PDF
12/09/2022 F.I. Received Doc.
Swept Path Analysis -16.5M Articulated Vehicle
Adobe PDF
12/09/2022 F.I. Received Doc.
Ballymount Rd - Eastern Site Access
Adobe PDF
12/09/2022 F.I. Received Doc.
Calmount Road Site Access Junction Options
Adobe PDF
12/09/2022 F.I. Received Doc.
Calmont Rd - Ballymount Ave Junction Enhancements
Adobe PDF
12/09/2022 F.I. Received Doc.
NTA Core Bus Corridor Enhancement Works
Adobe PDF
12/09/2022 F.I. Received Doc.
Calmont Rd - Prior to NTA Core Bus Corridor works
Adobe PDF
12/09/2022 F.I. Received Doc.
Typical Road Cross Section - Sheet 1
Adobe PDF
12/09/2022 F.I. Received Doc.
Surface Water Layout
Adobe PDF
12/09/2022 F.I. Received Doc.
Road Layout & Levels
Adobe PDF
12/09/2022 F.I. Received Doc.
Foul Water Layout
Adobe PDF
12/09/2022 F.I. Received Doc.
Watermain Layout
Adobe PDF
12/09/2022 F.I. Received Doc.
Engineers Response
Adobe PDF
12/09/2022 F.I. Received Doc.
Architects Design Statement
Adobe PDF
12/09/2022 F.I. Received Doc.
Architects Design Statement
Adobe PDF
12/09/2022 F.I. Received Doc.
Soft landscape plan & details
Adobe PDF
12/09/2022 F.I. Received Doc.
soft landscape plan & details
Adobe PDF
12/09/2022 F.I. Received Doc.
Hard L'scape/boundary treatments
Adobe PDF
12/09/2022 F.I. Received Doc.
L'scape Sections plans
Adobe PDF
12/09/2022 F.I. Received Doc.
Landscape Sections
Adobe PDF
14/09/2022 F.I. Received Doc.
Architects Design Statement
Adobe PDF
14/09/2022 F.I. Received Doc.
Drawing schedule
Adobe PDF
14/09/2022 F.I. Received Doc.
Lanscape sections x 4
Adobe PDF
14/09/2022 F.I. Received Doc.
Landscaping Architect's Report
Adobe PDF
30/09/2022 F.I. Received Doc.
Artists Impression
Adobe PDF
30/09/2022 Report Received from Internal Staff
Water Services AI
Adobe PDF
03/10/2022 F.I. Received Doc.
Site location map
Adobe PDF
03/10/2022 F.I. Received Doc.
Site layout plaan
Adobe PDF
03/10/2022 F.I. Received Doc.
Site Green space coverage plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Site 'Take in charge' plan
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 6 - Ground/1st floor plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 5 - Roof plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 6 - Section A-A & B-B plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Contiguous Elevations
Adobe PDF
03/10/2022 F.I. Received Doc.
Contiguous Elevations
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 1 - Elevation plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 2 - Elevation plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 4 - Elevation plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 4 - Elevation plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Unit 6 - Elevation plans
Adobe PDF
03/10/2022 F.I. Received Doc.
Schedule of Areas
Adobe PDF
10/10/2022 Chief Executives Order
Seek Clarification of Additional Information
Adobe PDF
10/10/2022 Notification of Decision Letters
Seek Clarification of Additional Information
Adobe PDF
24/11/2022 F.I. Clarification Letter
SDCC Clar. A.I. ack. letter
Adobe PDF
24/11/2022 F.I. Clarification Letter
Agent's Clar. of A.I. response
Adobe PDF
24/11/2022 F.I. Clarification Letter
Archt's drawing schedule
Adobe PDF
24/11/2022 F.I. Clarification Letter
Archt's Design Statement
Adobe PDF
24/11/2022 F.I. Received Doc.
Site Location map
Adobe PDF
24/11/2022 F.I. Received Doc.
Proposed Site plan
Adobe PDF
24/11/2022 F.I. Received Doc.
Site plan - 'Taken in Charge'
Adobe PDF
24/11/2022 F.I. Received Doc.
Unit 2 - Ground/First floor plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Unit 2 - Roof plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Unit 2 - Section A-A, & B-B
Adobe PDF
24/11/2022 F.I. Received Doc.
Unit 2 - Elevation plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Area schedule
Adobe PDF
24/11/2022 F.I. Received Doc.
Landscape schedule
Adobe PDF
24/11/2022 F.I. Received Doc.
L'scape Archt's response
Adobe PDF
24/11/2022 F.I. Received Doc.
Landscape Masterplan
Adobe PDF
24/11/2022 F.I. Received Doc.
Soft Landscape & detail plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Hard Landscaep/Details Boundary T'ment
Adobe PDF
24/11/2022 F.I. Received Doc.
Landscape Sections
Adobe PDF
24/11/2022 F.I. Received Doc.
Landscape Sections
Adobe PDF
24/11/2022 F.I. Received Doc.
Civil Engr's drawing schedule
Adobe PDF
24/11/2022 F.I. Received Doc.
Foul Water layout
Adobe PDF
24/11/2022 F.I. Received Doc.
Road layout & Level plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Surface Water layout
Adobe PDF
24/11/2022 F.I. Received Doc.
Pot. future road connection to B'mount Rd
Adobe PDF
24/11/2022 F.I. Received Doc.
Emerging NTA Bus Connects works
Adobe PDF
24/11/2022 F.I. Received Doc.
Watermain Layout
Adobe PDF
24/11/2022 F.I. Received Doc.
Engr's response to Clar. A.I. request
Adobe PDF
24/11/2022 F.I. Received Doc.
Engr's response to Clar. A.I. request
Adobe PDF
24/11/2022 F.I. Received Doc.
Engr's response to Clar. A.I. request
Adobe PDF
24/11/2022 F.I. Received Doc.
Elec. Engr's letter & schedule
Adobe PDF
24/11/2022 F.I. Received Doc.
Mech/Electrical Svces Install/Site Sves plans
Adobe PDF
24/11/2022 F.I. Received Doc.
Electrical Svces Install/Site Lighting plans
Adobe PDF
24/11/2022 F.I. Received Doc.
AWN letter re. Serveso Sites
Adobe PDF
24/11/2022 F.I. Received Doc.
Space Extensive Enterp. S'ment
Adobe PDF
24/11/2022 F.I. Received Doc.
Warehouse/Logistics/Office & Cafe rpt.
Adobe PDF
25/11/2022 Application - Cover Letter
Request for extension to CAI response period
Adobe PDF
25/11/2022 Chief Executives Order
Clar. A.I. Extension Order
Adobe PDF
08/12/2022 Report Received from Internal Staff
Roads Clar of AI
Adobe PDF
12/12/2022 Report Received from Internal Staff
Water Services Clar of AI
Adobe PDF
15/12/2022 Chief Executives Order
Grant Permission
Adobe PDF
15/12/2022 Notification of Decision Letters
Grant Permission
Adobe PDF
03/02/2023 Final Grant Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission
Condition 2a
Adobe PDF
02/03/2023 Submission Acknowledgment
Condition 2a
Adobe PDF
06/03/2023 Submission Acknowledgment
Condition 2a
Adobe PDF
18/04/2023 Submission
Con. 2 (b) & 3 - cover letter John Spain
Adobe PDF
18/04/2023 Submission
Con. 2 (b) & 3 - cover letter DBFL
Adobe PDF
18/04/2023 Submission
Con. 2 (b) & 3 - Drawing active travel proposal
Adobe PDF
26/04/2023 Notification of Decision Letters
Condition 2a - not compliant
Adobe PDF
03/05/2023 Submission
condition 14 (i) - NFA
Adobe PDF
03/05/2023 Submission
condition 14 (i) - NFA
Adobe PDF
12/05/2023 Submission
Condition 4 (c)
Adobe PDF
12/05/2023 Submission
Condition 4 (c)
Adobe PDF
12/05/2023 Submission
Condition 4(b)
Adobe PDF
12/05/2023 Submission
Condition 4(b)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 - (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 - (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 - (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 - (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 11 & 12 - (Con. 12 NFA)
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
18/05/2023 Submission
Condition 15
Adobe PDF
29/05/2023 Notification of Decision Letters
Condition 3 - Compliant
Adobe PDF
12/06/2023 Notification of Decision Letters
Condition 2b - Compliant
Adobe PDF
22/06/2023 Notification of Decision Letters
Condition 4(b) - Compliant
Adobe PDF
29/06/2023 Notification of Decision Letters
Condition 4 (c) - Compliant
Adobe PDF
05/07/2023 Notification of Decision Letters
Condition 11 - Compliant
Adobe PDF
10/07/2023 Notification of Decision Letters
Condition 15 - Compliant
Adobe PDF
18/08/2023 Submission
Con. 13 - Cover letter
Adobe PDF
18/08/2023 Submission
Con. 13
Word Document
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Con. 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
18/08/2023 Submission
Condition 13
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
14/11/2023 Submission
Condition 15
Adobe PDF
04/12/2023 Submission Acknowledgment
Condition 15
Adobe PDF
16/01/2024 Notification of Decision
Condition 15 - Compliant
Adobe PDF