- Date Received:
- 25/06/2021
- Last Action:
- 25/05/2022, Significant Additional Information
- Application Type:
- Permission
- Submission Type:
- Significant Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- Greener Ideas Limited
- Location:
- Profile Park, Baldonnel, Dublin 22
- Proposed Development:
- Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of 4.98m; Tanks including 2 x Diesel Oil Storage Tanks (volume of 2500m3 combined); SCR Urea Tank (26m3); Lube Oil Storage Tank (26m3); Lube Oil Maintenance Tank (26m3); Pilot Oil Tank (26m3); Fire Water Storage Tank (1000m3); Effluent Collecting Tank (26m3); Underground Surface Water Attenuation Tank (490m3); 2 new access onto the existing private road network with Profile Park; 12 parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage. An EIAR was submitted with this application.
- Decision Due:
- 19/07/2022
Decision Details
- Decision Date:
- 07/04/2022
- Decision:
- SEEK CLARIFICATION OF ADDITIONAL INFO.
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
23/06/2021 |
Application - Cover Letter
schedule |
Adobe PDF |
25/06/2021 | Acknowledgement / Validation Letter | Adobe PDF |
25/06/2021 |
Application - Cover Letter
x 2 |
Adobe PDF |
25/06/2021 |
Application - Cover Letter
x 2 |
Adobe PDF |
25/06/2021 | Application - Cover Letter | Adobe PDF |
25/06/2021 | Application Form - Part A | Adobe PDF |
25/06/2021 |
Drawings-General
Index |
Adobe PDF |
25/06/2021 |
Drawings-General
Planning drawings |
Adobe PDF |
25/06/2021 |
Drawings-General
Site locaTION rEGIONAL cONTEXT |
Adobe PDF |
25/06/2021 |
Drawings-General
Site location map |
Adobe PDF |
25/06/2021 |
Drawings-General
Site Location Map |
Adobe PDF |
25/06/2021 |
Drawings-General
Site Layout Plan |
Adobe PDF |
25/06/2021 |
Drawings-General
proposed site drainage |
Adobe PDF |
25/06/2021 |
Drawings-General
Visibility sitelines & autotrack |
Adobe PDF |
25/06/2021 |
Drawings-General
Typical car park & road details |
Adobe PDF |
25/06/2021 |
Drawings-General
Typical manhole details |
Adobe PDF |
25/06/2021 |
Drawings-General
Typical fencing details |
Adobe PDF |
25/06/2021 |
Drawings-General
Typical fencing details |
Adobe PDF |
25/06/2021 |
Drawings-General
Proposed attenuation Interceptor details |
Adobe PDF |
25/06/2021 | Drawings-General | Adobe PDF |
25/06/2021 |
Drawings-General
11069-2042 |
Adobe PDF |
25/06/2021 |
Drawings-General
11069-2043 |
Adobe PDF |
25/06/2021 |
Drawings-General
11069-2044 |
Adobe PDF |
25/06/2021 |
Drawings-General
11069-2045 |
Adobe PDF |
25/06/2021 |
Drawings-General
11069-2046 |
Adobe PDF |
25/06/2021 | Drawings-General | Adobe PDF |
25/06/2021 |
Drawings-General
11069-2048 |
Adobe PDF |
25/06/2021 |
Drawings-General
11069-2049 |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
main Report |
Adobe PDF |
25/06/2021 |
EIAR
Cover letter |
Adobe PDF |
25/06/2021 |
EIAR
Cover letter |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 |
EIAR
Main Report |
Adobe PDF |
25/06/2021 | EIAR | Adobe PDF |
25/06/2021 |
EIAR
landscape Mit Plan EIAR Appends |
Adobe PDF |
25/06/2021 |
EIAR
Appends 3 |
Adobe PDF |
25/06/2021 |
EIAR
Appends 3 |
Adobe PDF |
25/06/2021 |
EIAR
Appends 3 |
Adobe PDF |
25/06/2021 |
F.I. Received Doc.
gas engine roof & floor plans |
Adobe PDF |
25/06/2021 |
F.I. Received Doc.
gas engine roof & floor plans |
Adobe PDF |
25/06/2021 | Land owner consent | Adobe PDF |
25/06/2021 |
Landscape Plans
Sections EIAR Append |
Adobe PDF |
25/06/2021 | Newspaper Notice | Adobe PDF |
25/06/2021 | Newspaper Notice | Adobe PDF |
25/06/2021 |
Other Assessments
Screening report |
Adobe PDF |
25/06/2021 |
Other Assessments
Design statement |
Adobe PDF |
25/06/2021 | Photo Montage | Adobe PDF |
25/06/2021 | Site Notice | Adobe PDF |
20/07/2021 |
Report Received from External Body
Dept. of Defence |
Adobe PDF |
26/07/2021 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
26/07/2021 |
Report Received from Internal Staff
Roads |
Adobe PDF |
27/07/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
29/07/2021 |
Report Received from External Body
EPA |
Adobe PDF |
29/07/2021 |
Report Received from External Body
Dept Housing Local Government & Heritage |
Adobe PDF |
03/08/2021 |
Report Received from External Body
T. I. I. |
Adobe PDF |
18/08/2021 |
Report Received from Internal Staff
Parks |
Adobe PDF |
19/08/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
19/08/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
20/08/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
11/01/2022 | FI period extension request | Adobe PDF |
12/01/2022 |
Chief Executives Order
Grant Time Extension |
Adobe PDF |
12/01/2022 |
FI period extension reply
Grant Time Extension |
Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Consent Letter |
Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Letter |
Adobe PDF |
11/03/2022 |
F.I. Received Doc.
App cover letter |
Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Site Notice |
Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Newspaper Notice |
Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Index |
Adobe PDF |
11/03/2022 |
F.I. Received Doc.
Index |
Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
11/03/2022 | F.I. Received Doc. | Adobe PDF |
29/03/2022 |
Report Received from External Body
Transport Infrastructure Irl Sig A I |
Adobe PDF |
01/04/2022 |
Report Received from Internal Staff
Water Services AI |
Adobe PDF |
07/04/2022 |
Chief Executives Order
Seek Clarification of Additional Information |
Adobe PDF |
07/04/2022 |
Notification of Decision Letters
Seek Clarification of Additional Information |
Adobe PDF |
07/04/2022 |
Report Received from External Body
EHO AI / CAI |
Adobe PDF |
07/04/2022 |
Report Received from Internal Staff
Parks A I |
Adobe PDF |
25/05/2022 |
F.I. Receipt Ack. Letter
SDCC Ack letter |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Newspaper Notice |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Response |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Response to request For Clarification of AI |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Consent |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Photos |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Site Layout Plan |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Proposed Site Drainage |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Proposed Flood Capacity Compensatory Measures |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Proposed SuDs Details |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Radiator Coolers etc Plan, Sections & Elevations |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Workshop, Plans, Sections & Elevations |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Tank Farm Building - Plans, Sections & Elevations |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Security Hut- Plans, Sections & Elevations |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Landscape Plan |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Landscape Plan - Planting Plan |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Landscape Plans - Sections |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Contiguous Elevation - Sheet 1 of 3 |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Contiguous Elevation - Sheet 2 of 3 |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Contiguous Elevation - Sheet 3 of 3 |
Adobe PDF |
25/05/2022 |
F.I. Received Doc.
Site Sections & Cut/Fill Balance |
Adobe PDF |
25/05/2022 |
Significant FI Site Notice
Clarification |
Adobe PDF |
10/06/2022 |
Report Received from External Body
Dept of Defence Sig AI |
Adobe PDF |
10/06/2022 |
Report Received from Internal Staff
Water Services Clar of AI |
Adobe PDF |
14/06/2022 |
Report Received from External Body
Inland Fisheries Ireland Sig AI |
Adobe PDF |
04/07/2022 |
Report Received from Internal Staff
Parks Clar of AI |
Adobe PDF |
07/07/2022 |
Report Received from External Body
CAI Housing Local Government & Heritage DAU |
Adobe PDF |
19/07/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
19/07/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
31/08/2022 | Final Grant | Adobe PDF |
11/10/2022 |
Submission
Conditions; 3, 10, 13 & 14 (C10 not for agreement) |
Adobe PDF |
11/10/2022 |
Submission
Condition 2, 3, 4, 6, 13 and 14 |
Adobe PDF |
11/10/2022 |
Submission
Condition 2, 3, 4, 6, 13 and 14 |
Adobe PDF |
11/10/2022 |
Submission
Condition 2, 3, 4, 6, 13 and 14 |
Adobe PDF |
11/10/2022 |
Submission
Condition 2, 3, 4, 6, 13 and 14 |
Adobe PDF |
11/10/2022 |
Submission
Condition 10; Not for agreement |
Adobe PDF |
11/10/2022 |
Submission
Condition 2, 3, 4, 6, 13 and 14 |
Adobe PDF |
19/10/2022 |
Submission Acknowledgment
Condition 3, 6, 13 and 14 |
Adobe PDF |
08/11/2022 |
Submission Acknowledgment
Condition 2 and 4 |
Adobe PDF |
08/11/2022 |
Submission Acknowledgment
Condition 2 and 4 |
Adobe PDF |
28/11/2022 |
Notification of Decision Letters
Condition 2 - not compliant |
Adobe PDF |
02/12/2022 |
Notification of Decision Letters
Condition 4; Not compliant |
Adobe PDF |
06/12/2022 |
Notification of Decision Letters
Condition 6, 13 and 14; Compliant |
Adobe PDF |
13/12/2022 |
Notification of Decision Letters
Condition 3; Not Compliant |
Adobe PDF |
02/09/2024 |
Notification of Decision
Con.4 - Partially agreed (not c) |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
02/09/2024 |
Submission
Condition 8 - NFA |
Adobe PDF |
02/09/2024 |
Submission
Condition 8 - NFA |
Adobe PDF |
02/09/2024 |
Submission
Condition 4 |
Adobe PDF |
02/09/2024 |
Submission
Condition 3 (1) and (2) |
Adobe PDF |
02/09/2024 |
Submission
Condition 3 (3) |
Adobe PDF |
02/09/2024 |
Submission
cover letter regarding all conditions |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
02/09/2024 |
Submission
Condition 2 |
Adobe PDF |
18/10/2024 |
Notification of Decision
Condition 3(3) - Not compliant |
Adobe PDF |
18/10/2024 |
Notification of Decision
Condition 2 - Compliant |
Adobe PDF |
24/10/2024 |
Notification of Decision
Condition 3(1) & 3(2) -Compliant |
Adobe PDF |
07/11/2024 |
Submission
Condition 3 (3) |
Adobe PDF |
07/11/2024 |
Submission
Condition 3 (3) |
Adobe PDF |
14/11/2024 |
Submission Acknowledgment
Condition 3 (3) |
Adobe PDF |
05/12/2024 |
Submission
Condition 4 (c) |
Adobe PDF |
05/12/2024 |
Submission
Condition 4 (c) |
Adobe PDF |
05/12/2024 |
Submission
Condition 4 (c) |
Adobe PDF |
05/12/2024 |
Submission
Condition 4 (c) |
Adobe PDF |
06/12/2024 |
Correspondence with Planning Authority
update regarding condition 15 compliance |
Adobe PDF |
06/12/2024 |
Correspondence with Planning Authority
update regarding condition 15 compliance |
Adobe PDF |
06/12/2024 |
Correspondence with Planning Authority
update regarding condition 15 compliance |
Adobe PDF |
06/12/2024 |
Submission Acknowledgment
Condition 4 (c) |
Adobe PDF |
02/01/2025 |
Notification of Decision
Condition 3(3) - Not compliant |
Adobe PDF |