- Date Received:
- 22/06/2021
- Last Action:
- 01/03/2022, Significant Additional Information
- Application Type:
- Permission
- Submission Type:
- Significant Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- Exeter Ireland IV B Limited
- Location:
- Brownsbarn, Citywest Campus, Dublin 24.
- Proposed Development:
- Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangements to the subject lands to facilitate safe traffic flow to/from the proposed facilities; pedestrian access; 109 car parking spaces; bicycle parking; HGV Parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substation; sprinkler tanks; pump houses; and all associated site development works above and below ground on lands bounded to the south by the N7 Naas Road, to the north and west by the National Distribution Centre and to the east by Brownsbarn Drive and the Royal Garter Stables, a Protected Structure (RPS Ref. 261).
- Decision Due:
- 28/03/2022
Decision Details
- Decision Date:
- 28/03/2022
- Decision:
- GRANT PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
22/06/2021 | Acknowledgement / Validation Letter | Adobe PDF |
22/06/2021 | Application - Cover Letter | Adobe PDF |
22/06/2021 | Application - Cover Letter | Adobe PDF |
22/06/2021 |
Application - Cover Letter
Drawing Issue Sheet |
Adobe PDF |
22/06/2021 | Application Form - Part A | Adobe PDF |
22/06/2021 | Appropriate Assessment Screening Report | Adobe PDF |
22/06/2021 |
Correspondence with Planning Authority
Part L Compliance Report |
Adobe PDF |
22/06/2021 |
Drawings-General
Tree Protection Plan |
Adobe PDF |
22/06/2021 |
Drawings-General
Tree Protection Plan |
Adobe PDF |
22/06/2021 |
Drawings-General
Topographical Existing |
Adobe PDF |
22/06/2021 |
Drawings-General
Drainage & watermain |
Adobe PDF |
22/06/2021 |
Drawings-General
Drainage details |
Adobe PDF |
22/06/2021 |
Drawings-General
Foul sewer manaholes |
Adobe PDF |
22/06/2021 |
Drawings-General
Manholes, Gullies etc. 1 of 3 |
Adobe PDF |
22/06/2021 |
Drawings-General
manholes, gullies. 2 of 3 |
Adobe PDF |
22/06/2021 |
Drawings-General
Manhole gullies 3 of 3 |
Adobe PDF |
22/06/2021 |
Drawings-General
Watermain details |
Adobe PDF |
22/06/2021 |
Drawings-General
Sprinkler tank & pumphouse |
Adobe PDF |
22/06/2021 |
Elevations
Architectural |
Adobe PDF |
22/06/2021 |
Elevations
Architectural |
Adobe PDF |
22/06/2021 |
Elevations
contig. |
Adobe PDF |
22/06/2021 |
Floor Plans
ground |
Adobe PDF |
22/06/2021 |
Floor Plans
First |
Adobe PDF |
22/06/2021 |
Floor Plans
Unit 1 Second |
Adobe PDF |
22/06/2021 |
Floor Plans
Unit 1 Ancil. Office & Warehouse |
Adobe PDF |
22/06/2021 |
Floor Plans
Unit 2 Ground |
Adobe PDF |
22/06/2021 |
Floor Plans
Unit 2 First |
Adobe PDF |
22/06/2021 |
Floor Plans
Unit 2 Second |
Adobe PDF |
22/06/2021 |
Floor Plans
Ancil. office & warehouse |
Adobe PDF |
22/06/2021 |
Landscape Plans
Planting plan |
Adobe PDF |
22/06/2021 |
Landscape Plans
Section |
Adobe PDF |
22/06/2021 |
Landscape Plans
Section 4 |
Adobe PDF |
22/06/2021 | Newspaper Notice | Adobe PDF |
22/06/2021 |
Other Assessments
Arboricultural Impact Assessment Report |
Adobe PDF |
22/06/2021 |
Other Assessments
Architectural Heritage Impact Assessment |
Adobe PDF |
22/06/2021 |
Other Assessments
Traffic & Transportation |
Adobe PDF |
22/06/2021 |
Other Assessments
Stage 1 Road Safety Audit |
Adobe PDF |
22/06/2021 |
Other Assessments
Flood Risk Assessment |
Adobe PDF |
22/06/2021 |
Other Assessments
Ecological Impact Assessment |
Adobe PDF |
22/06/2021 |
Photo Montage
Method Statement |
Adobe PDF |
22/06/2021 |
Plans, Sections, Elevations
Unit 2 Tank, sprinkler,pumphouse |
Adobe PDF |
22/06/2021 |
Site Layout
HGV Swept Path |
Adobe PDF |
22/06/2021 | Site layout plan | Adobe PDF |
22/06/2021 | Site layout plan | Adobe PDF |
22/06/2021 | Site location map | Adobe PDF |
22/06/2021 | Site Notice | Adobe PDF |
20/07/2021 |
Report Received from External Body
Dept.of Defence |
Adobe PDF |
22/07/2021 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
22/07/2021 |
Sections
Arch 1 Unit 1 |
Adobe PDF |
22/07/2021 |
Sections
Arch 2-2 |
Adobe PDF |
26/07/2021 |
Report Received from Internal Staff
Roads |
Adobe PDF |
27/07/2021 |
Report Received from External Body
Irish WAter |
Adobe PDF |
03/08/2021 |
Report Received from External Body
T. I. I. |
Adobe PDF |
10/08/2021 |
Report Received from Internal Staff
Parks |
Adobe PDF |
13/08/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
13/08/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
04/02/2022 |
F.I. Receipt Ack. Letter
SDCC Ack letter |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Response from Thornton O'Connor Town Planning |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Response to Item 7 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Traffic & Transportation |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Archaeological Assessment |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Cover letter |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Landscape Masterplan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Landscape Section - ENO-JBAI-XX-XX-DR-L-0003 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Landscape Section - ENO-JBAI-XX-XX-DR-L-0004 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Planting Plan - ENO-JBAI-XX-XX-DR-L-0005 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Landscape Section - ENO-JBAI-XX-XX-DR-L-0006 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Ecological Impact Assessment |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Part L Compliance Report for Unit 1 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Part L Compliance Report for Unit 2 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Site Layout, Site Lihjting Services |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Drainage Design Report |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Vehicle Access to buildings |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 1 - Ground Floor Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 1 - First Florr Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 1 - Second Floor Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Ancillary Office & Warehouse Toilet Floor Plans |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 1 - Architectural Elevations |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 1 - Architectural Section 1-1 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - Ground Floor Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - First Floor Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - Second Floor Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - Ancillary & Warehouse Toilet Floor Plans |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - Architectural Elevations |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Unit 2 - Architectural Section 2-2 |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Architectural Contiguous Elevations |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Site Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Swept Paths |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Boundary Plan |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Drainage & Watermain Layout |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Drainage Details |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Irish Water |
Adobe PDF |
04/02/2022 |
F.I. Received Doc.
Method Statement Photo-montage production |
Adobe PDF |
14/02/2022 |
Report Received from Internal Staff
Water Services A I |
Adobe PDF |
15/02/2022 |
Report Received from External Body
Irish Water AI |
Adobe PDF |
15/02/2022 |
Report Received from External Body
T.I.I. AI |
Adobe PDF |
18/02/2022 |
Report Received from External Body
An Taisce AI |
Adobe PDF |
28/02/2022 |
Notification of Decision Letters
Request Revised Notices |
Adobe PDF |
01/03/2022 |
F.I. Receipt Ack. Letter
SDCC Ack letter - Sig. A. I. |
Adobe PDF |
01/03/2022 |
F.I. Received Doc.
Rersponse |
Adobe PDF |
01/03/2022 | Significant FI News Paper Notice | Adobe PDF |
24/03/2022 |
Report Received from Internal Staff
Architectural Conservation Officer |
Adobe PDF |
28/03/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
28/03/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
12/05/2022 | Final Grant | Adobe PDF |
02/06/2022 |
Submission
All conditions Cover Letter |
Adobe PDF |
02/06/2022 |
Submission
Condition 13 |
Adobe PDF |
02/06/2022 |
Submission
Condition 13 |
Adobe PDF |
02/06/2022 |
Submission
Condition 7 |
Adobe PDF |
02/06/2022 |
Submission
Condition 2 |
Adobe PDF |
02/06/2022 |
Submission
Condition 2 |
Adobe PDF |
08/06/2022 |
Submission
Condition 5 |
Adobe PDF |
08/06/2022 |
Submission
Condition 5 |
Adobe PDF |
08/06/2022 |
Submission
Condition 5 |
Adobe PDF |
14/06/2022 |
Submission Acknowledgment
Condition 2,7 and 13 |
Adobe PDF |
14/06/2022 |
Submission Acknowledgment
Condition 5 |
Adobe PDF |
20/07/2022 |
Submission
Condition 14; Not for agree |
Adobe PDF |
20/07/2022 |
Submission
Condition 14; Not for agree |
Adobe PDF |
20/07/2022 |
Submission
Condition 14; Not for agree |
Adobe PDF |
20/07/2022 |
Submission
Condition 14; Not for agree |
Adobe PDF |
27/07/2022 |
Notification of Decision Letters
Condition 7; Not Compliant |
Adobe PDF |
27/07/2022 |
Notification of Decision Letters
Condition 13; Compliant |
Adobe PDF |
27/07/2022 |
Submission
Condition 9 a, b and c; Not for agreement |
Adobe PDF |
02/08/2022 |
Notification of Decision Letters
Condition 2; Not Compliant |
Adobe PDF |
02/08/2022 |
Submission Acknowledgment
ERROR |
Adobe PDF |
05/08/2022 |
Notification of Decision Letters
Condition 5; Not compliant |
Adobe PDF |
25/08/2022 |
Submission
Condition 2; Cover Letter, Method Statement, SLM |
Adobe PDF |
25/08/2022 |
Submission
Condition 2; Cover Letter, Method Statement, SLM |
Adobe PDF |
25/08/2022 |
Submission
Condition 2; Cover Letter, Method Statement, SLM |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
25/08/2022 |
Submission
Condition 2 |
Adobe PDF |
29/08/2022 |
Submission
Condition 5 |
Adobe PDF |
30/08/2022 |
Submission Acknowledgment
Condition 5 |
Adobe PDF |
31/08/2022 |
Submission Acknowledgment
Condition 2 |
Adobe PDF |
20/10/2022 |
Notification of Decision Letters
Compliance with condition 2 |
Adobe PDF |
24/10/2022 |
Notification of Decision Letters
Compliance with condition 5 |
Adobe PDF |