- Date Received:
- 31/08/2021
- Last Action:
- 21/03/2022, Significant Additional Information
- Application Type:
- Permission
- Submission Type:
- Significant Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- Vantage Data Centers Dub 11 Ltd.
- Location:
- In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22
- Proposed Development:
- Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
- Decision Due:
- 16/05/2022
Decision Details
- Decision Date:
- 16/05/2022
- Decision:
- GRANT PERMISSION
- Final Grant Date:
- N/A
Appeal to An Bord Pleanala
- Notified:
- 14/06/2022
- Lodged:
- 13/06/2022
- Appellant Type:
- 1 st Party
- Nature of Appeal:
- Condition 2
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
31/08/2021 | Acknowledgement / Validation Letter | Adobe PDF |
31/08/2021 | Application - Cover Letter | Adobe PDF |
31/08/2021 | Application - Cover Letter | Adobe PDF |
31/08/2021 | Application Form - Part A | Adobe PDF |
31/08/2021 | Appropriate Assessment Screening Report | Adobe PDF |
31/08/2021 |
Drawings-General
Site survey existing |
Adobe PDF |
31/08/2021 | Drawings-General | Adobe PDF |
31/08/2021 |
Drawings-General
sightlines |
Adobe PDF |
31/08/2021 |
Drawings-General
Auto track Crane Access |
Adobe PDF |
31/08/2021 |
Drawings-General
Auto track layout HGV |
Adobe PDF |
31/08/2021 |
Drawings-General
Auto track Oil Tanker |
Adobe PDF |
31/08/2021 |
Drawings-General
prop.sight levels & watermain |
Adobe PDF |
31/08/2021 |
Drawings-General
prop sight level contours 1 of 2 |
Adobe PDF |
31/08/2021 |
Drawings-General
prop sight level contours 2 |
Adobe PDF |
31/08/2021 |
Drawings-General
cut & fill floor finish levels |
Adobe PDF |
31/08/2021 |
Drawings-General
proposed drainage layout |
Adobe PDF |
31/08/2021 |
Drawings-General
external works plan |
Adobe PDF |
31/08/2021 |
Drawings-General
Energy Statement |
Adobe PDF |
31/08/2021 |
Drawings-General
Dialux Calculation |
Adobe PDF |
31/08/2021 | EIAR | Adobe PDF |
31/08/2021 |
EIAR
2 |
Adobe PDF |
31/08/2021 |
EIAR
2 |
Adobe PDF |
31/08/2021 |
EIAR
2 |
Adobe PDF |
31/08/2021 |
EIAR
3 |
Adobe PDF |
31/08/2021 |
EIAR
3 |
Adobe PDF |
31/08/2021 |
Elevations
Arch Generator Agrekko plan |
Adobe PDF |
31/08/2021 |
Elevations
Dub 11 |
Adobe PDF |
31/08/2021 |
Elevations
Dub 12 |
Adobe PDF |
31/08/2021 |
Elevations
Architectural |
Adobe PDF |
31/08/2021 |
Floor Plans
& elevs Step Up Substation |
Adobe PDF |
31/08/2021 |
Floor Plans
Dublin 11 ground |
Adobe PDF |
31/08/2021 |
Floor Plans
First floor overall plan |
Adobe PDF |
31/08/2021 |
Floor Plans
Dub 11 Roof plan |
Adobe PDF |
31/08/2021 |
Floor Plans
DUB12 Ground floor |
Adobe PDF |
31/08/2021 |
Floor Plans
Dub12 First floor |
Adobe PDF |
31/08/2021 |
Floor Plans
Dub 12 Roof Plan |
Adobe PDF |
31/08/2021 |
Landscape Plans
masterplan |
Adobe PDF |
31/08/2021 |
Landscape Plans
Planting plan & schedule |
Adobe PDF |
31/08/2021 |
Landscape Plans
earthworks modelling |
Adobe PDF |
31/08/2021 |
Landscape Plans
sections |
Adobe PDF |
31/08/2021 |
Landscape Plans
Boundary Treatments |
Adobe PDF |
31/08/2021 |
Landscape Plans
Tree Removal & Retention |
Adobe PDF |
31/08/2021 |
Landscape Plans
Tree Constraints |
Adobe PDF |
31/08/2021 |
Landscape Plans
Stream & biodiversity |
Adobe PDF |
31/08/2021 |
Landscape Plans
& outline specs |
Adobe PDF |
31/08/2021 | Newspaper Notice | Adobe PDF |
31/08/2021 |
Other Assessments
Engineering Planning Report |
Adobe PDF |
31/08/2021 |
Other Assessments
Lighting Plan Terrain |
Adobe PDF |
31/08/2021 |
Other Assessments
Biodiversity Management Plan |
Adobe PDF |
31/08/2021 |
Other Assessments
Outline Construction & Environmental Management Pl |
Adobe PDF |
31/08/2021 |
Other Assessments
Site-Specific |
Adobe PDF |
31/08/2021 |
Other Assessments
Outline Construction Management Plan |
Adobe PDF |
31/08/2021 |
Other Assessments
Architectural Design |
Adobe PDF |
31/08/2021 |
Other Assessments
Arboricultural |
Adobe PDF |
31/08/2021 |
Other Assessments
Design Statement |
Adobe PDF |
31/08/2021 |
Other Assessments
Landscape,Visual & Heritage Impact 1 |
Adobe PDF |
31/08/2021 |
Other Assessments
Landscape, Visual & Heritage 2 |
Adobe PDF |
31/08/2021 |
Other Assessments
Technical Appendicies |
Adobe PDF |
31/08/2021 |
Plans, Sections, Elevations
Power generator |
Adobe PDF |
31/08/2021 |
Plans, Sections, Elevations
Arch Switchroom Substatios A & B |
Adobe PDF |
31/08/2021 |
Plans, Sections, Elevations
AGI Gas Regulater |
Adobe PDF |
31/08/2021 |
Road Layout Plan
Autotrack Large car |
Adobe PDF |
31/08/2021 |
Sections
Dublin 11 |
Adobe PDF |
31/08/2021 |
Sections
Dub 12 |
Adobe PDF |
31/08/2021 |
Site Layout
amendments |
Adobe PDF |
31/08/2021 |
Site Layout
Arch. proposed Phase 1A |
Adobe PDF |
31/08/2021 |
Site Layout
Equipment yard fence |
Adobe PDF |
31/08/2021 |
Site Layout
Auto track Low Loader |
Adobe PDF |
31/08/2021 |
Site Layout
Proposed sightlevels & watermain 1 of 2 |
Adobe PDF |
31/08/2021 |
Site layout plan
existing |
Adobe PDF |
31/08/2021 |
Site layout plan
Arch. proposed |
Adobe PDF |
31/08/2021 |
Site layout plan
Arch. fencing plan |
Adobe PDF |
31/08/2021 |
Site layout plan
Generator Roof Level |
Adobe PDF |
31/08/2021 |
Site layout plan
Archit site plan |
Adobe PDF |
31/08/2021 |
Site layout plan
Auto Track Fire Tender |
Adobe PDF |
31/08/2021 |
Site layout plan
Autotrack refuse vehicle |
Adobe PDF |
31/08/2021 |
Site location map
Architectural |
Adobe PDF |
31/08/2021 | Site Notice | Adobe PDF |
31/08/2021 |
Water Supply Plans
Infrastructure details |
Adobe PDF |
01/10/2021 |
Submission
P MFhlannchadha |
Adobe PDF |
04/10/2021 |
Report Received from External Body
An Taisce |
Adobe PDF |
04/10/2021 |
Report Received from External Body
Geological Survey Ireland |
Adobe PDF |
04/10/2021 |
Report Received from External Body
An Taisce |
Adobe PDF |
04/10/2021 |
Submission
B Cuthbert |
Adobe PDF |
10/10/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
18/10/2021 |
Report Received from Internal Staff
Parks |
Adobe PDF |
26/10/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
26/10/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
21/02/2022 |
F.I. Received Doc.
Contaminated Land Interpretative report |
Adobe PDF |
21/02/2022 |
F.I. Received Doc.
Contaminated Land Interpretative report |
Adobe PDF |
04/03/2022 |
FI period extension request
F.I. Extension Request |
Adobe PDF |
07/03/2022 |
Chief Executives Order
F.I. Extension Order |
Adobe PDF |
07/03/2022 |
Notification of Decision Letters
F.I. Extension Notification |
Adobe PDF |
16/03/2022 |
Report Received from External Body
Dept of Defence AI |
Adobe PDF |
21/03/2022 |
F.I. Clarification Letter
Ack. Significant |
Adobe PDF |
21/03/2022 |
F.I. Clarification Letter
Ack. Significant |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Letter from Dept of Defence |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig First floor |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig AI Site plan Main Entrance |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. sections |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig Elevs Dub 12 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Elevations |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Roof plan Dub 12 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig Ground Floor |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Lighting plan terrain |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Gas regulator Signifiicant |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
sig AI Switchroom A & B |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Yard fence |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig fencing plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig A.I. Proposed Phase 1 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig AI Arch. prop Site plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Amendments to site plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Existing site 1 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. A.I. |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Arch. first floor overall |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Dub 1 Elevations |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Add Inf. Site Plan Dub 11 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sections Dub 11 ABC |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. F.I. Dublin 11 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Stacked generators |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Roof plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Ground floor plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Multifuel Power Phase 1 & 2 |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig. Multi Fuel Power elevs |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Multifuel Power Plant plans & sections |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sig plans & sections |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
North Elevs |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
North Floor Plans & Sections |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Floor,elevs,section - Transformer |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Arch Site location plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Additional Information |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Further Information - Cover letter |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Tree Protection Plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Masterplan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Planting plan & scchedule |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
landscape plans |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Earthmodelling |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Biodiversity |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Cover letter |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Stream Assessment Results |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Stream Assessment Results |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Stream Assessment Results |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Stream Assessment Results |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Stream Assessment Results |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Biodiversity Management Plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Geographical Survey |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Arborist Assoc. |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Appropriate Assess. Screening |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Biodiversity Management Plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Environmental Impact Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Dialux Calculation |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Energy Statement |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Landscape Report & Outline Spec |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Flood Risk Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Flood Risk Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Surface water design calculations |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Engineering Planning Report |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Engineering Planning Report |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Outline Traffic Management Plan |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Storm network |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Storm network |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Cover letter Pinnacle |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Main Environmental Impact Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Main Environmental Impact Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Aviation Impact |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Aviation Impact |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Air Quality |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Landscape, Visual & Built Heritage |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Viewpoint Photos |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Sunpower |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Archaeological Assessment |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Project details & Images |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Project details & Images |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Statement in support of planning application |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Letter & doc schedule |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Cover letter |
Adobe PDF |
21/03/2022 |
F.I. Received Doc.
Cover letter |
Adobe PDF |
21/03/2022 |
Significant FI News Paper Notice
Sig A.I. - Newspaper |
Adobe PDF |
21/03/2022 |
Significant FI Site Notice
Site notice |
Adobe PDF |
13/04/2022 |
Report Received from External Body
E.H.O. Sig A. I. |
Adobe PDF |
13/04/2022 |
Report Received from External Body
I F I Sig AI and TII |
Adobe PDF |
13/04/2022 |
Report Received from External Body
I F I Sig AI and TII |
Adobe PDF |
13/04/2022 |
Report Received from External Body
T.I.I. Sig A.I. |
Adobe PDF |
20/04/2022 |
Report Received from Internal Staff
Parks Sig A I |
Adobe PDF |
20/04/2022 |
Report Received from Internal Staff
Water Services Sig A I |
Adobe PDF |
21/04/2022 |
Report Received from External Body
Dept Env Climate Comm.GIS Division Sig AI |
Adobe PDF |
22/04/2022 |
Report Received from External Body
Dept Env Climate Comm EPD Sig A I |
Adobe PDF |
28/04/2022 |
Report Received from External Body
Sig AI Irish Water |
Adobe PDF |
16/05/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
16/05/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
15/06/2022 |
Appeal Notification
1st party |
Adobe PDF |
06/07/2022 |
Appeal Correspondence
Appeal withdrawn |
Adobe PDF |
19/07/2022 | Final Grant | Adobe PDF |
16/01/2023 |
Submission
Condition 2 |
Adobe PDF |
16/01/2023 |
Submission
Condition 2 |
Adobe PDF |
16/01/2023 |
Submission
Condition 2 |
Adobe PDF |
16/01/2023 |
Submission
Condition 2 |
Adobe PDF |
16/01/2023 |
Submission
Condition 3 |
Adobe PDF |
16/01/2023 |
Submission
Condition 16 |
Adobe PDF |
16/01/2023 |
Submission
Condition 5; Not for agreement |
Adobe PDF |
16/01/2023 |
Submission
Condition 5; Not for agreement |
Adobe PDF |
16/01/2023 |
Submission
Condition 5; Not for agreement |
Adobe PDF |
16/01/2023 |
Submission
Condition 5; Not for agreement |
Adobe PDF |
16/01/2023 |
Submission
All Conditions Cover Letter |
Adobe PDF |
09/02/2023 |
Submission
Cover letter etc. - condition 7 |
Adobe PDF |
09/02/2023 |
Submission
Cover letter - conditions 4, 7, 11 & 17 |
Adobe PDF |
09/02/2023 |
Submission
Condition 11 |
Adobe PDF |
09/02/2023 |
Submission
Condition 4 - Waste Management Plan |
Adobe PDF |
09/02/2023 |
Submission
Condition 17 - CEMP |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 11 - partial compliance |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 17 - compliant |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 2 - compliant |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 3 - compliant |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 16 - compliant |
Adobe PDF |
06/04/2023 |
Notification of Decision Letters
Condition 4 - not compliant |
Adobe PDF |
17/05/2023 |
Submission
Condition 4 - CDWMP |
Adobe PDF |
31/05/2023 |
Notification of Decision Letters
Condition 5 - Compliant |
Adobe PDF |
31/05/2023 |
Notification of Decision Letters
Condition 9 - partially compliant 9 (i) & 9 (ii) |
Adobe PDF |
07/07/2023 |
Notification of Decision Letters
Condition 4 (4) - Not compliant |
Adobe PDF |
10/10/2023 |
Submission
Condition 8 NFA |
Adobe PDF |