- Date Received:
- 20/07/2021
- Last Action:
- 13/10/2021, Additional Information
- Application Type:
- Permission
- Submission Type:
- Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- Microsoft Operations Ireland Ltd.
- Location:
- Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
- Proposed Development:
- Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
- Decision Due:
- 10/11/2021
Decision Details
- Decision Date:
- 10/11/2021
- Decision:
- GRANT PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
07/07/2021 |
Drawings-General
Site levels Sheet A |
Adobe PDF |
20/07/2021 | Acknowledgement / Validation Letter | Adobe PDF |
20/07/2021 | Acknowledgement / Validation Letter | Adobe PDF |
20/07/2021 |
Application - Cover Letter
Document schedule |
Adobe PDF |
20/07/2021 | Application Form - Part A | Adobe PDF |
20/07/2021 |
Contiguous Building Elevations
1 |
Adobe PDF |
20/07/2021 |
Contiguous Building Elevations
2 |
Adobe PDF |
20/07/2021 |
Contiguous Building Elevations
3 |
Adobe PDF |
20/07/2021 |
Drainage Network Drawings
Typical Drainage Details |
Adobe PDF |
20/07/2021 |
Drainage Network Drawings
Storm & rainwater existing Campus A |
Adobe PDF |
20/07/2021 |
Drawings-General
Sprinkler tank & pumphouse |
Adobe PDF |
20/07/2021 |
Drawings-General
Water treatment sprinkler pump & tank |
Adobe PDF |
20/07/2021 |
Drawings-General
proposed gas compound |
Adobe PDF |
20/07/2021 |
Drawings-General
boundary & fence details |
Adobe PDF |
20/07/2021 |
Drawings-General
Covered bicycle bay |
Adobe PDF |
20/07/2021 |
Drawings-General
tank & pumphouse |
Adobe PDF |
20/07/2021 |
Drawings-General
Water Treatment Plant |
Adobe PDF |
20/07/2021 |
Drawings-General
Existing site survey |
Adobe PDF |
20/07/2021 |
Drawings-General
Site finishes A |
Adobe PDF |
20/07/2021 |
Drawings-General
Vehicle tracking Analysis A |
Adobe PDF |
20/07/2021 |
Drawings-General
waste drainage A |
Adobe PDF |
20/07/2021 |
Drawings-General
Foul & Industrial Waste Drainage |
Adobe PDF |
20/07/2021 |
Drawings-General
Surface water drainage A |
Adobe PDF |
20/07/2021 |
Drawings-General
Surface water drainage B |
Adobe PDF |
20/07/2021 |
Drawings-General
Storm & rainwater updates to ex. Campus B |
Adobe PDF |
20/07/2021 |
EIAR
Environmental Impact Statement |
Adobe PDF |
20/07/2021 |
EIAR
Volume 111 |
Adobe PDF |
20/07/2021 |
EIAR
Volume 11 Part 1 |
Adobe PDF |
20/07/2021 |
EIAR
Volume 11, Part 2 |
Adobe PDF |
20/07/2021 |
Elevations
External Cladding 90 |
Adobe PDF |
20/07/2021 |
Elevations
external cladding 91 |
Adobe PDF |
20/07/2021 |
Elevations
Dub 14 |
Adobe PDF |
20/07/2021 | Elevations | Adobe PDF |
20/07/2021 |
Elevations
Sheet 1 |
Adobe PDF |
20/07/2021 |
Elevations
Sheet 2 |
Adobe PDF |
20/07/2021 |
Elevations
Approved & Proposed |
Adobe PDF |
20/07/2021 |
Elevations
Office approved 1 |
Adobe PDF |
20/07/2021 |
Elevations
proposed 2 |
Adobe PDF |
20/07/2021 |
Elevations
proposed sheet 3 |
Adobe PDF |
20/07/2021 |
Floor Plans
prop ground 14 |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed first |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed roof plan |
Adobe PDF |
20/07/2021 |
Floor Plans
Proposed ground |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed first |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed roof |
Adobe PDF |
20/07/2021 |
Floor Plans
Office building Sheet 1 |
Adobe PDF |
20/07/2021 |
Floor Plans
Sheet 3 |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed basement |
Adobe PDF |
20/07/2021 |
Floor Plans
proposed basement |
Adobe PDF |
20/07/2021 |
Floor Plans
level 1 |
Adobe PDF |
20/07/2021 |
Floor Plans
Level 2 |
Adobe PDF |
20/07/2021 |
Floor Plans
Level 3 |
Adobe PDF |
20/07/2021 |
Floor Plans
Office level 3 |
Adobe PDF |
20/07/2021 |
Floor Plans
Proposed Roof |
Adobe PDF |
20/07/2021 | Land owner consent | Adobe PDF |
20/07/2021 |
Landscape Plans
& Planting Plan overall |
Adobe PDF |
20/07/2021 |
Landscape Plans
Details sheet 1 of 2 |
Adobe PDF |
20/07/2021 |
Landscape Plans
Planting plan sheet 2 of 2 |
Adobe PDF |
20/07/2021 |
Landscape Plans
Tree & Hedge Survey 1 of 2 |
Adobe PDF |
20/07/2021 | Newspaper Notice | Adobe PDF |
20/07/2021 |
Other Assessments
Demolition Waste Management |
Adobe PDF |
20/07/2021 |
Other Assessments
Site Waste Management Plan |
Adobe PDF |
20/07/2021 |
Other Assessments
Construction Environmental Management Plan |
Adobe PDF |
20/07/2021 |
Other Assessments
Architects Design Statement |
Adobe PDF |
20/07/2021 |
Other Assessments
Aviation Report |
Adobe PDF |
20/07/2021 |
Other Assessments
Engineering Planning Report |
Adobe PDF |
20/07/2021 |
Other Assessments
Plume Modelling |
Adobe PDF |
20/07/2021 |
Other Assessments
Arbouricultural Site Assessment |
Adobe PDF |
20/07/2021 |
Other Assessments
Flood Risk Assessment |
Adobe PDF |
20/07/2021 |
Other Assessments
Flood risk assessment drawing |
Adobe PDF |
20/07/2021 |
Other Assessments
Site details |
Adobe PDF |
20/07/2021 | Photo Montage | Adobe PDF |
20/07/2021 |
Plans, Sections, Elevations
Contractor's carpark approved |
Adobe PDF |
20/07/2021 |
Sections
Boundary 1 |
Adobe PDF |
20/07/2021 |
Sections
2 |
Adobe PDF |
20/07/2021 |
Sections
3 |
Adobe PDF |
20/07/2021 |
Sections
1 |
Adobe PDF |
20/07/2021 |
Sections
2 |
Adobe PDF |
20/07/2021 |
Sections
Approved & Proposed 3 |
Adobe PDF |
20/07/2021 |
Sections
4 |
Adobe PDF |
20/07/2021 |
Sections
Dub 14 |
Adobe PDF |
20/07/2021 |
Sections
prop Sheet 1 |
Adobe PDF |
20/07/2021 |
Sections
Approved & proposed |
Adobe PDF |
20/07/2021 |
Sections
Office AA,BB,CC proposed |
Adobe PDF |
20/07/2021 |
Sections
Proposed office DD,EE |
Adobe PDF |
20/07/2021 |
Sections
Section FF,GG |
Adobe PDF |
20/07/2021 |
Sections
prop office HH,II |
Adobe PDF |
20/07/2021 |
Site Layout
Consent SDCC |
Adobe PDF |
20/07/2021 |
Site Layout
Overall |
Adobe PDF |
20/07/2021 | Site Layout | Adobe PDF |
20/07/2021 |
Site Layout
Prop Dub15 & Admin building |
Adobe PDF |
20/07/2021 |
Site Layout
Site levels Sheet B |
Adobe PDF |
20/07/2021 |
Site layout plan
Overall 1 |
Adobe PDF |
20/07/2021 |
Site layout plan
Overall 2 |
Adobe PDF |
20/07/2021 |
Site layout plan
Overall proposed 1 |
Adobe PDF |
20/07/2021 |
Site layout plan
Overall proposed 2 |
Adobe PDF |
20/07/2021 |
Site layout plan
Proposed DUB 14 & Substation |
Adobe PDF |
20/07/2021 |
Site layout plan
Construction phasing drawing |
Adobe PDF |
20/07/2021 |
Site layout plan
Site Finishes B |
Adobe PDF |
20/07/2021 |
Site layout plan
Vehicle tracking B |
Adobe PDF |
20/07/2021 |
Site layout plan
watermain Sheet A |
Adobe PDF |
20/07/2021 |
Site layout plan
Lighting layout |
Adobe PDF |
20/07/2021 | Site location map | Adobe PDF |
20/07/2021 |
Site location map
Overall |
Adobe PDF |
20/07/2021 |
Site location map
Sheet 1 |
Adobe PDF |
20/07/2021 |
Site location map
Sheet 2 |
Adobe PDF |
20/07/2021 | Site Notice | Adobe PDF |
20/07/2021 |
Water Supply Plans
Watermain layout A |
Adobe PDF |
20/07/2021 |
Water Supply Plans
Watermain layout B |
Adobe PDF |
20/07/2021 |
Water Supply Plans
Water Attentunation storage Dub 9 &10 |
Adobe PDF |
20/07/2021 |
Water Supply Plans
Surface water attenuation Dub 12 & 13 |
Adobe PDF |
20/07/2021 |
Water Supply Plans
Typical Watermain details |
Adobe PDF |
21/07/2021 |
Landscape Plans
Tree & Hedge Survey 2 of 2 |
Adobe PDF |
03/08/2021 |
Plans, Sections, Elevations
Sheet A |
Adobe PDF |
10/08/2021 |
Report Received from External Body
Defence dept. |
Adobe PDF |
18/08/2021 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
20/08/2021 |
Floor Plans
Sheet 2 |
Adobe PDF |
20/08/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
08/09/2021 |
Report Received from Internal Staff
Parks |
Adobe PDF |
13/09/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
13/09/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
13/10/2021 | F.I. Receipt Ack. Letter | Adobe PDF |
13/10/2021 |
F.I. Received Doc.
cover letter |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Meadow area & Social space |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Cover letter |
Adobe PDF |
13/10/2021 | F.I. Received Doc. | Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Biodiversity/Green Infracture Strategy |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Biodiversity Link to woodland |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Overall masterplan |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
masterplan 1 of 2 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
2 of 2 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Overall site plan prop |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Overall proposed 2 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Enlarged prop DUB 14 & Substation |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Prop. Dub 15 & Admin building |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Construction phasing drawing |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
sprinkler system |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
boundary fence & details |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Site sections 1 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Site sections 2 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Surface water Sheet A |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Surface water sheet B |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Overall drainage |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Drainage catchment |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
Drainage details 2 |
Adobe PDF |
13/10/2021 |
F.I. Received Doc.
document schedule |
Adobe PDF |
02/11/2021 |
Report Received from Internal Staff
Water Services A I |
Adobe PDF |
04/11/2021 |
Report Received from Internal Staff
Parks A I |
Adobe PDF |
10/11/2021 |
Chief Executives Order
GRANT PERMISSION |
Adobe PDF |
10/11/2021 |
Notification of Decision Letters
GRANT PERMISSION |
Adobe PDF |
20/12/2021 | Final Grant | Adobe PDF |
08/02/2022 |
Submission
All Conditions Cover Letter |
Adobe PDF |
08/02/2022 |
Submission
Compliance schedule of documents |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 3 |
Adobe PDF |
08/02/2022 |
Submission
Condition 5; TMP |
Adobe PDF |
08/02/2022 |
Submission
Condition 8; CWMP |
Adobe PDF |
08/02/2022 |
Submission
Condition 15 |
Adobe PDF |
08/02/2022 |
Submission
Condition 15 |
Adobe PDF |
08/02/2022 |
Submission
Condition 15 |
Adobe PDF |
08/02/2022 |
Submission
Condition 15 |
Adobe PDF |
08/02/2022 |
Submission
Condition 15 |
Adobe PDF |
08/02/2022 |
Submission
Condition 12 |
Adobe PDF |
08/02/2022 |
Submission
Condition 12 |
Adobe PDF |
08/02/2022 |
Submission
Condition 12 |
Adobe PDF |
08/02/2022 |
Submission
Condition 12 |
Adobe PDF |
08/02/2022 |
Submission
Condition 12 |
Adobe PDF |
08/02/2022 |
Submission
Condition 4 and 9; Responses |
Adobe PDF |
08/02/2022 |
Submission
Condition 5 and 8; Developer Letter of Agreement |
Adobe PDF |
15/02/2022 |
Submission Acknowledgment
Conditions 3,4,5,8,9,12,15 |
Adobe PDF |
01/04/2022 |
Notification of Decision Letters
Condition 3 and 9; Compliant |
Adobe PDF |
04/04/2022 |
Notification of Decision Letters
Condition 4 and 12; Compliant |
Adobe PDF |
05/04/2022 |
Notification of Decision Letters
Condition 15; Compliant |
Adobe PDF |
11/04/2022 |
Notification of Decision Letters
Condition 5 and 8; Compliant |
Adobe PDF |
11/04/2022 |
Notification of Decision Letters
Condition 5 and 8; Compliant |
Adobe PDF |