- Date Received:
- 10/06/2022
- Last Action:
- 10/06/2022
- Application Type:
- SHD3-Application to ABP
- Submission Type:
- SHD3-Application to ABP
- Closing Date for Submissions:
- Closed
- Applicant:
- Bluemount Developments (Firhouse) Ltd
- Location:
- Mortons, The Firhouse Inn, Firhouse Road, Dublin 24, D24 YYR4
- Proposed Development:
- Demolition of all existing structures on site (c. 1,326 sq m), including: Two storey building formally used as public house, ancillary off-licence and associated structures (c. 972 sq m); Two storey building comprising an existing barber shop and betting office (c. 260 sq m); Single storey cottage building and associated structures (c. 94 sq m); and Eastern boundary wall and gated entrance from Mount Carmel Park. The development with a total gross floor area of c. 11,638 sq m, will consist of 100 residential units arranged in 2 blocks (Blocks 01 and 02) ranging between 3 and 5 storeys in height, over lower ground floor and basement levels, comprising: 96 apartments (consisting of 2 studio units; 45 one bedroom units; 10 two bedroom (3 person) units; 34 two bedroom (4 person) units; and 5 three bedroom units), together with private (balconies and private terraces) and communal amenity open space provision at podium and roof levels; and 4 duplex apartments (consisting of 2 one bedroom units and 2 two bedroom units (4 person) located within Block 01, together with private balconies and terraces. Also included is non-residential uses (c. 355 sq m), including: 1 café (c. 58 sq m) and 1 office (c. 30 sq m) located at ground floor level of Block 01; 1 medical unit (c. 59 sq m) and 1 betting office (c. 66 sq m) located at ground floor level of Block 02; 1 barber shop (c. 28 sq m) located at ground floor level between Blocks 01 and 02; and 1 crèche (c. 114 sq m) located at lower ground floor level of Block 01 and associated outdoor play area to the rear. Vehicular access to the site will be from the existing access off Firhouse Road. The proposal includes minor alterations to the existing access, including the provision of new and enhanced pedestrian infrastructure. The development will also consist of the provision of public open space and related play areas; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, basement car parking (80 spaces in total, including accessible spaces); motorcycle parking; electric vehicle charging points; bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections to existing public services, (including relocation of existing surface water sewer and water main from within the application site onto the public roads area along Firhouse Road and Mount Carmel Park); ducting; plant; waste management provision; SuDS measures; stormwater management and attenuation; sustainability measures; signage; changes in levels; public lighting; and all ancillary site development and excavation works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the South Dublin County Council Development Plan 2016-2022 and the South Dublin County Development Plan 2022-2028. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act 2000, as amended, notwithstanding that the proposed development materially contravenes the South Dublin County Council Development Plan 2016-2022 and the South Dublin County Development Plan 2022-2028 other than in relation to the zoning of the land.
- Decision Due:
- 04/08/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
10/06/2022 |
Application - Cover Letter
Letter to An Bord Pleanala |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Letter to SDCC |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Letter to Prescribed Bodies |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Response to An Bord Pleanala Opinion |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Community and Social Infrastructure Audit |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Material Contravention Statement |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Statement of Consistency |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Planning Report |
Adobe PDF |
10/06/2022 |
Application - Cover Letter
Schedule of Documents and Drawings |
Adobe PDF |
10/06/2022 | Application Form - Part A | Adobe PDF |
10/06/2022 | Application Form - Part A | Adobe PDF |
10/06/2022 |
Drawings-General
Taken in Charge Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Area of Consent Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Site Location Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Existing Site Layout Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Demolition Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Apartment Typology Plans - 1 Beds and Studios |
Adobe PDF |
10/06/2022 |
Drawings-General
Apartment Typology Plans - 2 Beds |
Adobe PDF |
10/06/2022 |
Drawings-General
Apartment Typology Plans - Duplexes and 3 Beds |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level 00 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level 01 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level 02 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level 03 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level 04 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level B1 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Level B2 |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed GA Plan - Roof Level |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Elevations and Contiguous Elevations |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Elevations |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Elevations |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Elevations |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Contiguous Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Dual Aspect Diagrams |
Adobe PDF |
10/06/2022 |
Drawings-General
Safeguarding Higher Standards Diagrams |
Adobe PDF |
10/06/2022 |
Drawings-General
Open Space Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Part V Units Diagrams |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed 3D View - South East |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed 3D View - South West |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed 3D View - North West |
Adobe PDF |
10/06/2022 |
Drawings-General
Proposed 3D View - North East |
Adobe PDF |
10/06/2022 |
Drawings-General
Part V Units Diagrams |
Adobe PDF |
10/06/2022 |
Drawings-General
Drawing Register and Issue Sheet |
Adobe PDF |
10/06/2022 |
Drawings-General
Basement Drainage Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Cross Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Foul Water Drainage Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Longitudinal Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Roof Level Drainage Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Site Survey |
Adobe PDF |
10/06/2022 |
Drawings-General
Surface Water Drainage Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Water Services Details |
Adobe PDF |
10/06/2022 |
Drawings-General
Watermain Diversion Tie-Ins |
Adobe PDF |
10/06/2022 |
Drawings-General
Watermain Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Landscape Plan - Level 00 Podium + Ground Level |
Adobe PDF |
10/06/2022 |
Drawings-General
Landscape Plan - Level 00 Podium + Ground Level |
Adobe PDF |
10/06/2022 |
Drawings-General
Green Infrastructure Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Landscape - Site Sections |
Adobe PDF |
10/06/2022 |
Drawings-General
Landscape Plan - Level 00 Podium + Ground Level |
Adobe PDF |
10/06/2022 |
Drawings-General
Level 00 Podium Courtyard + Level 02 Roof Garden |
Adobe PDF |
10/06/2022 |
Drawings-General
Landscape Plan - Level 01 Lower Ground |
Adobe PDF |
10/06/2022 |
Drawings-General
Level 03 Roof Garden + Level 04 Playspace |
Adobe PDF |
10/06/2022 |
Drawings-General
Planting Details and General Specification Notes |
Adobe PDF |
10/06/2022 |
Drawings-General
Planting Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Play Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
SuDS Tree Pit Details |
Adobe PDF |
10/06/2022 |
Drawings-General
Mechanical & Electrical - Combined Site Services L |
Adobe PDF |
10/06/2022 |
Drawings-General
Site Lighting Layout |
Adobe PDF |
10/06/2022 |
Drawings-General
Tree Survey & Constraints Plan |
Adobe PDF |
10/06/2022 |
Drawings-General
Tree Works & Protection Plan |
Adobe PDF |
10/06/2022 | Newspaper Notice | Adobe PDF |
10/06/2022 |
Other Assessments
Architectural Design Statement |
Adobe PDF |
10/06/2022 |
Other Assessments
Statement of Response |
Adobe PDF |
10/06/2022 |
Other Assessments
Building Lifecycle Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Part V Document |
Adobe PDF |
10/06/2022 |
Other Assessments
Technical Document |
Adobe PDF |
10/06/2022 |
Other Assessments
Construction Environmental Management Plan |
Adobe PDF |
10/06/2022 |
Other Assessments
Construction Waste Management Plan |
Adobe PDF |
10/06/2022 |
Other Assessments
Water Services Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Softworks Outline Maintenance and Management Rep. |
Adobe PDF |
10/06/2022 |
Other Assessments
Hedgerow Reinstatement + Management Plan |
Adobe PDF |
10/06/2022 |
Other Assessments
Landscape Design Rationale + Statement of Response |
Adobe PDF |
10/06/2022 |
Other Assessments
Landscape Management Schedule |
Adobe PDF |
10/06/2022 |
Other Assessments
Arboricultural Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Archaeological Impact Assessment & Method State. |
Adobe PDF |
10/06/2022 |
Other Assessments
Article 299B Statement |
Adobe PDF |
10/06/2022 |
Other Assessments
Bat Survey Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Daylight & Sunlight Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Ecological Impact Assessment Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Energy & Sustainability Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Environmental Impact Assessment Screening Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Heritage Impact Assessment |
Adobe PDF |
10/06/2022 |
Other Assessments
Invasive Species Survey Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Mechanical & Electrcial - Site Services Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Mechanical & Electrical - Basis of Design Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Noise Assessment |
Adobe PDF |
10/06/2022 |
Other Assessments
Operational Waste Management Plan |
Adobe PDF |
10/06/2022 |
Other Assessments
Part V - Agreement in Principle Letter |
Adobe PDF |
10/06/2022 |
Other Assessments
Part V Proposals |
Adobe PDF |
10/06/2022 |
Other Assessments
Preliminary Environmental Site Assessment |
Adobe PDF |
10/06/2022 |
Other Assessments
Proposed Site Lighting Layout & Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Screening for Appropriate Assessment |
Adobe PDF |
10/06/2022 |
Other Assessments
Traffic and Transport Assessment |
Adobe PDF |
10/06/2022 |
Other Assessments
Unit Mix Review & Justification Report |
Adobe PDF |
10/06/2022 |
Other Assessments
Verified Photomontages |
Adobe PDF |
10/06/2022 |
Other Assessments
Visual Impact Assessment |
Adobe PDF |
10/06/2022 |
Site Layout
Proposed Site Layout Plan |
Adobe PDF |
10/06/2022 | Site Notice | Adobe PDF |
16/06/2022 |
Correspondence with Planning Authority
Letter from ABP re: Report Date |
Adobe PDF |
20/07/2022 |
Submission
Letter from ABP re Submissions |
Adobe PDF |
20/07/2022 |
Submission
A. Edge |
Adobe PDF |
20/07/2022 |
Submission
A. Walker |
Adobe PDF |
20/07/2022 |
Submission
B. Wyer |
Adobe PDF |
20/07/2022 |
Submission
C. Groarke |
Adobe PDF |
20/07/2022 |
Submission
D. Wyer |
Adobe PDF |
20/07/2022 |
Submission
F. O'Toole |
Adobe PDF |
20/07/2022 |
Submission
H. Carter & G. Morris |
Adobe PDF |
20/07/2022 |
Submission
Inland Fisheries Ireland |
Adobe PDF |
20/07/2022 |
Submission
Minister for Culture Heritage & The Gaeltacht |
Adobe PDF |
20/07/2022 |
Submission
Mount Carmel Park Residents Association |
Adobe PDF |
20/07/2022 |
Submission
N. Canavan |
Adobe PDF |
20/07/2022 |
Submission
S. O'Grady |
Adobe PDF |
20/07/2022 |
Submission
T. Cambell |
Adobe PDF |
20/07/2022 |
Submission
Transport Infrastructure Ireland |
Adobe PDF |
20/07/2022 |
Submission
A. Robinson |
Adobe PDF |
28/07/2022 |
Submission
Irish Water |
Adobe PDF |
04/08/2022 | SDCC Report to ABP | Adobe PDF |
07/09/2022 |
Correspondence with Planning Authority
Letter from ABP - Delay in Decision |
Adobe PDF |