- Date Received:
- 08/11/2022
- Last Action:
- 08/11/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Vantage Data Centers DUB11 Ltd.
- Location:
- Site within the townlands of Ballybane & Kilbride, Clondalkin, Dublin 22
- Proposed Development:
- Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
- Decision Due:
- 12/01/2023
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
08/11/2022 | Acknowledgement / Validation Letter | Adobe PDF |
08/11/2022 | Application - Cover Letter | Adobe PDF |
08/11/2022 | Application Form - Part A | Adobe PDF |
08/11/2022 | Appropriate Assessment Screening Report | Adobe PDF |
08/11/2022 |
Drainage Network Drawings
Layout |
Adobe PDF |
08/11/2022 |
Drainage Network Drawings
drainage details |
Adobe PDF |
08/11/2022 |
Drawings-General
Ex below ground services |
Adobe PDF |
08/11/2022 |
Drawings-General
External works |
Adobe PDF |
08/11/2022 |
Drawings-General
Glare Analysis |
Adobe PDF |
08/11/2022 |
Drawings-General
Topography |
Adobe PDF |
08/11/2022 |
Drawings-General
Topography |
Adobe PDF |
08/11/2022 |
Drawings-General
Topography |
Adobe PDF |
08/11/2022 |
Drawings-General
Outline Construction Plan |
Adobe PDF |
08/11/2022 |
Drawings-General
Information to support property management |
Adobe PDF |
08/11/2022 |
Drawings-General
Energy Statement |
Adobe PDF |
08/11/2022 |
Drawings-General
Workspace travel plan |
Adobe PDF |
08/11/2022 |
Drawings-General
Circular Economy Technical Note |
Adobe PDF |
08/11/2022 |
EIAR
Volume 1 |
Adobe PDF |
08/11/2022 |
EIAR
Volume 1 |
Adobe PDF |
08/11/2022 |
EIAR
Volume 1 |
Adobe PDF |
08/11/2022 |
EIAR
Volume 1 |
Adobe PDF |
08/11/2022 |
EIAR
Volume 1 |
Adobe PDF |
08/11/2022 |
EIAR
non technical summary |
Adobe PDF |
08/11/2022 |
Landscape Plans
Landscape, Visual & Built Heritage |
Adobe PDF |
08/11/2022 |
Landscape Plans
Tree Removal & Protection Plan |
Adobe PDF |
08/11/2022 |
Landscape Plans
Proposals & Masterplan |
Adobe PDF |
08/11/2022 |
Landscape Plans
proposals & sections |
Adobe PDF |
08/11/2022 |
Landscape Plans
Planting plan & schedule |
Adobe PDF |
08/11/2022 |
Landscape Plans
proposals |
Adobe PDF |
08/11/2022 |
Landscape Plans
proposals green Infrastructure |
Adobe PDF |
08/11/2022 |
Landscape Plans
Report |
Adobe PDF |
08/11/2022 | Newspaper Notice | Adobe PDF |
08/11/2022 |
Other Assessments
EIAR - Non - Technical Summary |
Adobe PDF |
08/11/2022 |
Other Assessments
Volume 1 - Main EIAR |
Adobe PDF |
08/11/2022 |
Other Assessments
Volume 1 - Main EIAR |
Adobe PDF |
08/11/2022 |
Other Assessments
Volume 1 - Main EIAR |
Adobe PDF |
08/11/2022 |
Other Assessments
Volume 2: Landscape, VIsual & Built Heritage |
Adobe PDF |
08/11/2022 |
Other Assessments
Volume 2: Landscape, VIsual & Built Heritage |
Adobe PDF |
08/11/2022 |
Other Assessments
Ecology / Biodiversity |
Adobe PDF |
08/11/2022 |
Other Assessments
Arboricultural Assessment Report |
Adobe PDF |
08/11/2022 |
Other Assessments
Tree Assessment Plan |
Adobe PDF |
08/11/2022 |
Other Assessments
Tree Constraints Plan |
Adobe PDF |
08/11/2022 |
Other Assessments
Culvert crossing layout & sections |
Adobe PDF |
08/11/2022 |
Other Assessments
Planning letter |
Adobe PDF |
08/11/2022 |
Other Assessments
Technical Details |
Adobe PDF |
08/11/2022 |
Other Assessments
2) Landscape Visual & Built Heritage |
Adobe PDF |
08/11/2022 |
Other Assessments
2) Landscape Visual & Built Heritage |
Adobe PDF |
08/11/2022 |
Other Assessments
2) Landscape Visual & Built Heritage |
Adobe PDF |
08/11/2022 |
Other Assessments
engineering planning report |
Adobe PDF |
08/11/2022 |
Other Assessments
Ecological Impact Assessment |
Adobe PDF |
08/11/2022 |
Other Assessments
Technical Appendices 3 |
Adobe PDF |
08/11/2022 |
Other Assessments
Appendices A & B |
Adobe PDF |
08/11/2022 |
Other Assessments
Appendices A & B |
Adobe PDF |
08/11/2022 |
Other Assessments
engineering planning report |
Adobe PDF |
08/11/2022 |
Other Assessments
paving details |
Adobe PDF |
08/11/2022 |
Other Assessments
On Site Specific Flood Risk |
Adobe PDF |
08/11/2022 |
Other Assessments
Design & access statement |
Adobe PDF |
08/11/2022 |
Other Assessments
Storm network |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
HGV tracking |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
Attenuation pond details |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
external works details |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
petrol interceptor & hydrobrake details |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
Green Space Factor Diagrams |
Adobe PDF |
08/11/2022 |
Plans, Sections, Elevations
Planning Report Details |
Adobe PDF |
08/11/2022 |
Sections
cross section |
Adobe PDF |
08/11/2022 |
Site assessment report
Information to support the property management bra |
Adobe PDF |
08/11/2022 |
Site Layout
Crane tracking |
Adobe PDF |
08/11/2022 |
Site Layout
existing levels |
Adobe PDF |
08/11/2022 |
Site Layout
proposed levels & watermain layout |
Adobe PDF |
08/11/2022 |
Site Layout
Cut & fill to formation |
Adobe PDF |
08/11/2022 |
Site Layout
District Heating |
Adobe PDF |
08/11/2022 |
Site Layout
Typical headwall detail |
Adobe PDF |
08/11/2022 |
Site Layout
Solar Modular glare |
Adobe PDF |
08/11/2022 |
Site layout plan
Oil tanker tracking |
Adobe PDF |
08/11/2022 | Site Notice | Adobe PDF |
08/11/2022 |
Visual Assessment Report
Glint & Glare |
Adobe PDF |
08/11/2022 |
Water Supply Plans
Standard Infrastructure details |
Adobe PDF |
08/12/2022 |
Report Received from Internal Staff
Roads |
Adobe PDF |
09/12/2022 |
Report Received from External Body
Environmental Protection Agency |
Adobe PDF |
12/12/2022 |
Submission
P. MacFhlannchadha |
Adobe PDF |
14/12/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
14/12/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
15/12/2022 |
Report Received from External Body
I.A.A. |
Adobe PDF |
15/12/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
15/12/2022 |
Report Received from External Body
T.I.I. |
Adobe PDF |
22/12/2022 |
Report Received from External Body
E.H.O. |
Adobe PDF |
04/01/2023 |
Report Request Letter to External Body
I. A. A. |
Adobe PDF |
12/01/2023 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
12/01/2023 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
16/01/2023 |
Notification to third parties and State bodies
Advised Add. Info. requested |
Adobe PDF |
04/04/2023 | F.I. Receipt Ack. Letter | Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Marston Cover Letter |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Agents Response |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Proposed site layout plan |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Architectural proposed fencing plan |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arch Elevations 1 East & West |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arch Elevations 2 Northeast & Southeast |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Proposed drainage layout |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
External Works Layout |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
External works footpath / cyclepath |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Bridge Details |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape Proposals Landscape Masterplan Drg 101 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape Drg 201 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape Proposals / Sections Drg 202 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape planting plan & schedule Drg 203 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape earthwork modelling Drg 204 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape Green infrastructure diagrams Drg 205 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Landscape Rpt & outline landscape specification |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Tree Constraints Plan drg TSTCP 31 8 22 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Tree Assessment Plan Drg TSTAP 31 8 22 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Tree removal & protection plan Drg TSTPP 3 9 22 |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arboricultural Assessment Report Treespace |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arboricultural Assessment Report Treespace |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arboricultural Assessment Report Treespace |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Arboricultural Assessment Report Treespace |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
AI Design Statement Hyphen |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Pinnacle Consulting Engineers Response |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Energy Efficiency & Climate Change Adpt. Statement |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Circular Economy Technical Note |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Workplace Travel Plan Statement |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Info to support DOD incl Aviation Wildlife Impact |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
EIAR Replacement Non technical summary |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
EIAR Volume 1A Main EIAR |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
EIAR Volume 2A LVHIA |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
EIAR Volume 3A Technical Appendices |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Biodiversity Management Plan |
Adobe PDF |
04/04/2023 |
F.I. Received Doc.
Appropriate Assessment Screening |
Adobe PDF |
12/04/2023 |
Notification to third parties and State bodies
Notify Add.Info. Received |
Adobe PDF |
15/05/2023 |
Report Received from External Body
E.H.O. A.I. |
Adobe PDF |
19/05/2023 |
Report Received from Internal Staff
AI Parks |
Adobe PDF |
29/05/2023 |
Chief Executives Order
REFUSE PERMISSION |
Adobe PDF |
29/05/2023 |
Notification of Decision Letters
REFUSE PERMISSION |
Adobe PDF |
29/05/2023 |
Notification to third parties and State bodies
Advised of Decision |
Adobe PDF |
29/06/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
29/06/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
29/06/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
29/06/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
29/06/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
30/06/2023 |
Notification to third parties and State bodies
Notify of Appeal lodged |
Adobe PDF |
11/09/2023 |
Appeal Correspondence
A.B.P.'s Statutory Notice to 1st party |
Adobe PDF |
01/11/2023 |
Appeal Correspondence
A.B.P.'s Decision date extn. |
Adobe PDF |
02/02/2024 | Appeal Correspondence | Adobe PDF |
20/11/2024 | Appeal Correspondence | Adobe PDF |