K2 Strategic Infrastructure Ltd
Location:
Site at Kingswood Drive and Kingswood Road within the Citywest Business Campus, Naas Road, Dublin 24
Proposed Development:
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.
Decision Due:
19/09/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
26/07/2022 Acknowledgement / Validation Letter
SDCC Ack Letter
Adobe PDF
26/07/2022 Application - Cover Letter Adobe PDF
26/07/2022 Application Form - Part A Adobe PDF
26/07/2022 Arborist Associates Ltd Document Register Adobe PDF
26/07/2022 Arborist Association Assessment of the Site Area Adobe PDF
26/07/2022 Architectural & Cultural Heritage Assessment Adobe PDF
26/07/2022 Architectural Design Statement Adobe PDF
26/07/2022 Bat Report Adobe PDF
26/07/2022 Clifton Scannell Schedule of Drawings Adobe PDF
26/07/2022 Clifton Scannell Emerson - Planning Drawings Adobe PDF
26/07/2022 Construction & Operational Stage Assessment of Air Adobe PDF
26/07/2022 Consultants Advice Notice Adobe PDF
26/07/2022 Contiguous Building Elevations
Proposed Contiguous Elevations
Adobe PDF
26/07/2022 Contiguous Building Elevations
Permitted West Contiguous Elevations
Adobe PDF
26/07/2022 Drainage Network Drawings
Existing Foul Wastewater Drainage Layout Plan
Adobe PDF
26/07/2022 Drainage Network Drawings
Proposed Foul Wastewater Drainage Layout Plan
Adobe PDF
26/07/2022 Drawing Issue Sheet Adobe PDF
26/07/2022 Ecological Impact Assessment Adobe PDF
26/07/2022 Elevations
Proposed Elevations
Adobe PDF
26/07/2022 Elevations
Permitted Elevations
Adobe PDF
26/07/2022 Elevations
Buildings & Plant ESB Substation Elevations
Adobe PDF
26/07/2022 Elevations
Buildings & Plants Containerised Control Building
Adobe PDF
26/07/2022 Elevations
Buildings & Pl Typical Transformer Bund Elevations
Adobe PDF
26/07/2022 Engineering Services Report Drainage & Water Servi Adobe PDF
26/07/2022 Entrance Landscape Plan Adobe PDF
26/07/2022 Entrance Planting Plan Adobe PDF
26/07/2022 Environmental Impact Assessment Screening Report Adobe PDF
26/07/2022 Floor Plans
Proposed Ground Floor Plan
Adobe PDF
26/07/2022 Floor Plans
Proposed First Floor Plan
Adobe PDF
26/07/2022 Floor Plans
Proposed Roof Plan
Adobe PDF
26/07/2022 Floor Plans
Permitted Ground Floor Plan
Adobe PDF
26/07/2022 Floor Plans
Permitted First Floor Plan
Adobe PDF
26/07/2022 Floor Plans
Permitted Roof Plan
Adobe PDF
26/07/2022 Floor Plans
Buildings & Plant ESB Substation Floor Plans
Adobe PDF
26/07/2022 Floor Plans
Buildings & Plant Containerised Control Building F
Adobe PDF
26/07/2022 Land owner consent Adobe PDF
26/07/2022 Land Ownership Map Adobe PDF
26/07/2022 Landform Adobe PDF
26/07/2022 Landscape Concept Adobe PDF
26/07/2022 Landscape Master Plan Adobe PDF
26/07/2022 Newspaper Notice Adobe PDF
26/07/2022 Noise Impact Assessment for a Proposed K2 Data Cen Adobe PDF
26/07/2022 Outline Construction Environmental Management Pla Adobe PDF
26/07/2022 Permitted 10kV Sub Station Adobe PDF
26/07/2022 Permitted Baldonnell Approach slope Adobe PDF
26/07/2022 Permitted Boundary Details Adobe PDF
26/07/2022 Photomontages & Positional Imagery Adobe PDF
26/07/2022 Planning Report Adobe PDF
26/07/2022 Proposed Baldonnell Approach Slope Adobe PDF
26/07/2022 Proposed Boundary Details Adobe PDF
26/07/2022 Proposed HGV Autotracking Movements (Loading Docks Adobe PDF
26/07/2022 Proposed Overall HGV Autotracking Movements Adobe PDF
26/07/2022 Proposed Permeable & Impermeable Areas Adobe PDF
26/07/2022 Proposed Services Details Sheet 1 Adobe PDF
26/07/2022 Proposed Services Details Sheet 2 Adobe PDF
26/07/2022 Proposed Standard Trench Details Adobe PDF
26/07/2022 Proposed surface Water Attenuation System Cross-Se Adobe PDF
26/07/2022 Proposed surface Water Attenuation system General Adobe PDF
26/07/2022 Proposed Surface Water Attenuation System Layout P Adobe PDF
26/07/2022 Proposed Surface Water Drainage Layout Plan Adobe PDF
26/07/2022 Report for the Purpose of Appropriate Assessment S Adobe PDF
26/07/2022 Resource & Waste Management Plan for a Proposed Adobe PDF
26/07/2022 RKD Planning Issue Register Adobe PDF
26/07/2022 Road Layout Plan
Proposed Road Details Sheet 1
Adobe PDF
26/07/2022 Road Layout Plan
Proposed Road Details Sheet 2
Adobe PDF
26/07/2022 Sections
Proposed Sections A-A, B-B & C-C
Adobe PDF
26/07/2022 Sections
Permitted Sections A-A & B-B
Adobe PDF
26/07/2022 Sections
Building & Plant Typical Transformer Bund Plan & S
Adobe PDF
26/07/2022 Sections
ESB Substations Sections
Adobe PDF
26/07/2022 Site Layout
Proposed Site Layout & Levels Plan
Adobe PDF
26/07/2022 Site Layout
Proposed Primary & Secondary Site Entrance Layout
Adobe PDF
26/07/2022 Site layout plan
Electrical Services - Site Layout Plan
Adobe PDF
26/07/2022 Site layout plan
Existing Surface Water Drainage Layout Plan
Adobe PDF
26/07/2022 Site layout plan
Estate Layout Plan
Adobe PDF
26/07/2022 Site layout plan
Proposed Site Plan
Adobe PDF
26/07/2022 Site layout plan
Permitted Site Plan
Adobe PDF
26/07/2022 Site location map Adobe PDF
26/07/2022 Site Notice Adobe PDF
26/07/2022 Site Specific Flood Risk Assessment Adobe PDF
26/07/2022 Site Survey Adobe PDF
26/07/2022 Topographical Survey Layout Plan Adobe PDF
26/07/2022 Tree Constraints Plan Adobe PDF
26/07/2022 Tree Protection Plan Adobe PDF
26/07/2022 Typical Lightning Monopole & Lightning Pole Detail Adobe PDF
26/07/2022 Typical Palisade Fence Adobe PDF
26/07/2022 Typical Palisade Gate Adobe PDF
26/07/2022 Water Supply Plans
Existing Water Supply Layout Plan
Adobe PDF
26/07/2022 Water Supply Plans
Proposed Water Supply Layout Plan
Adobe PDF
26/07/2022 Woodland Planting Adobe PDF
26/08/2022 6m Paladin Gate Adobe PDF
29/08/2022 Submission
P G Evans
Adobe PDF
15/09/2022 Notification to third parties and State bodies
Advised of Decision
Adobe PDF
19/09/2022 Chief Executives Order
Grant Permission
Adobe PDF
19/09/2022 Notification of Decision Letters
Grant Permission
Adobe PDF
03/11/2022 Final Grant Adobe PDF
03/02/2023 Submission
Condition 5 and 6 (1,2,4,8 & 9 NFA)
Adobe PDF
03/02/2023 Submission
Condition 5 and 6 (1,2,4,8 & 9 NFA)
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 3
Adobe PDF
03/02/2023 Submission
Condition 7 (not for agreement)
Adobe PDF
03/02/2023 Submission
Condition 7 (not for agreement)
Adobe PDF
06/03/2023 Submission Acknowledgment
Condition 3, 5 and 6
Adobe PDF
22/03/2023 Notification of Decision Letters
Condition 6 - compliant
Adobe PDF
24/03/2023 Notification of Decision Letters
Condition 5 - compliant
Adobe PDF
28/03/2023 Notification of Decision Letters
Condition 3 - compliant
Adobe PDF