- Date Received:
- 04/07/2022
- Last Action:
- 04/07/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Citywest Drive Limited Partnership
- Location:
- Citywest Shopping Centre, Fortunestown, Dublin 24
- Proposed Development:
- The development will consist of amendments to the Strategic Housing Development permitted under An Bord Pleanála Reference TA065.305556. The proposed amendments comprise the provision of photovoltaic panels on the roofs of all 6 no. blocks, the provision of roof plant at Blocks A, B, C and D, the provision of an ESB substation at Block O that requires the relocation of no. 1 carparking space, and the reconfiguration of the ground floor of Block E to provide an enlarged plant room. These amendments are necessary to service the permitted blocks, improve the energy efficiency of the development, and to meet the requirements of ESB to serve the site. At Block A it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; and a screen plant area accommodating an internal plant room of 13.24 sqm and an external plant area of 34.72 sqm surrounded. The proposed screened plant rises approx. 1 metre above the permitted lift overruns. At Block B it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 5-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 4-storey section of the building; and a screened external plant area of 29.2 sqm on the 4-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block C it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows on the 6-storey section of the permitted building; a red brick internal plant room of 10.3 sqm on the 5-storey section of the building; and a screened plant area of 32 sqm on the 5-storey section of the building. The proposed roof plant rises approx. 1 metre above the permitted lift over run. At Block D it is proposed to provide the following: 21 no. photovoltaic panels arranged in 3 no. rows; a screened with an internal plant room of 13.5 sqm and an external plant area of 24.33 sqm; a c. 3-metre-high red brick ESB substation with LV switch room to the southwest of the Block D, and the ancillary relocation of 1 no. car parking space. The proposed screened plant rises approx. 2 metre above the permitted parapet level. At Block E it is proposed to provide the following; 18 no. photovoltaic panels arranged in 3 no. rows; and the reconfiguration of the ground floor to replace 1 no permitted retail unit with an enlarged Plant Room (117.15 sqm}, ESB substation (13.6 sqm), a Generator Room (21.82 sqm}, and a Low Voltage (L V} switchroom (13.71 sqm}. These works require the removal of existing windows and doors at the permitted retail unit. At Block F it is proposed to provide 18 no. photovoltaic panels arranged in 2 no. rows. These, and all associated site works including landscaping at a site of 2.9 hectares.
- Decision Due:
- 29/08/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
04/07/2022 | Acknowledgement / Validation Letter | Adobe PDF |
04/07/2022 | Acknowledgement / Validation Letter | Adobe PDF |
04/07/2022 | Application - Cover Letter | Adobe PDF |
04/07/2022 |
Application - Cover Letter
& Document schedule |
Adobe PDF |
04/07/2022 |
Application - Cover Letter
Doc schedule |
Adobe PDF |
04/07/2022 | Application Form - Part A | Adobe PDF |
04/07/2022 | Appropriate Assessment Screening Report | Adobe PDF |
04/07/2022 |
Drawings-General
Roof Plan Block B |
Adobe PDF |
04/07/2022 |
Drawings-General
Roof mechanical domestic water |
Adobe PDF |
04/07/2022 |
Elevations
N & E |
Adobe PDF |
04/07/2022 |
Elevations
Block B S & W |
Adobe PDF |
04/07/2022 |
Elevations
Block C North & East |
Adobe PDF |
04/07/2022 |
Elevations
Block D S & W elevs |
Adobe PDF |
04/07/2022 |
Elevations
Prop. elevs Block D |
Adobe PDF |
04/07/2022 |
Elevations
North & East |
Adobe PDF |
04/07/2022 |
Elevations
Prop Block E S & W Elevs |
Adobe PDF |
04/07/2022 |
Elevations
Block F North & East |
Adobe PDF |
04/07/2022 |
Elevations
Cont West |
Adobe PDF |
04/07/2022 |
Elevations
Cont North & South |
Adobe PDF |
04/07/2022 |
Elevations
Cont North & South |
Adobe PDF |
04/07/2022 |
Floor Plans
Block C 5 |
Adobe PDF |
04/07/2022 |
Floor Plans
Block C Floor 5 |
Adobe PDF |
04/07/2022 |
Floor Plans
Roof plan Block C |
Adobe PDF |
04/07/2022 |
Floor Plans
Roof plan Block D |
Adobe PDF |
04/07/2022 |
Floor Plans
Ground Block E |
Adobe PDF |
04/07/2022 |
Floor Plans
Roof plan Block E |
Adobe PDF |
04/07/2022 |
Floor Plans
Block F roof |
Adobe PDF |
04/07/2022 |
Floor Plans
Block B 4th floor |
Adobe PDF |
04/07/2022 |
Floor Plans
ground |
Adobe PDF |
04/07/2022 |
Floor Plans
Ground floor water services |
Adobe PDF |
04/07/2022 |
Floor Plans
Fourth Floor Water & mechanical services |
Adobe PDF |
04/07/2022 |
Floor Plans
Fifth floor layout |
Adobe PDF |
04/07/2022 |
Landscape Plans
Block D |
Adobe PDF |
04/07/2022 |
Landscape Plans
Block D |
Adobe PDF |
04/07/2022 | Newspaper Notice | Adobe PDF |
04/07/2022 |
Other Assessments
Roof, Mechanical & Water Services |
Adobe PDF |
04/07/2022 |
Plans, Sections, Elevations
Roof plan Block A |
Adobe PDF |
04/07/2022 |
Plans, Sections, Elevations
Views & CGI |
Adobe PDF |
04/07/2022 |
Sections
Cont AA & BB |
Adobe PDF |
04/07/2022 |
Site Layout
Block A |
Adobe PDF |
04/07/2022 |
Site Layout
Block A |
Adobe PDF |
04/07/2022 |
Site Layout
Roof layout Domestic water |
Adobe PDF |
04/07/2022 | Site layout plan | Adobe PDF |
04/07/2022 | Site Notice | Adobe PDF |
05/07/2022 |
Elevations
Block B N & East |
Adobe PDF |
26/07/2022 |
Report Received from External Body
Dept of Defence |
Adobe PDF |
04/08/2022 |
Site Layout
Substation / switchroom |
Adobe PDF |
04/08/2022 | Site location map | Adobe PDF |
15/08/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
16/08/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
18/08/2022 |
Report Received from Internal Staff
Roads |
Adobe PDF |
29/08/2022 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
29/08/2022 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
30/08/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
11/10/2022 |
F.I. Receipt Ack. Letter
S.D.C.C.'s ack. letter |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Agent's cover letter |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
B.M. Engineer's cover letter |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
BM Surface Water design report |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Surface Water Drainage plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Surface Water cathcment plan |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Drawing Schedule |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Site location map |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Site Layout plan |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Permited/Compliant Site layout |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Contiguous North/South Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Contiguous West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Contiguous AA & BB Section plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block A - Roof plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block A - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block A - North/East Elevatoins |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block B - 4th Floor plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block B - Roof Plan |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block B - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block B - North/East Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block C - 5th Floor plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block C - Roof plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block C - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block C - North/East Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block D - Roof plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block D - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block D - North/East Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block E - Ground floor plan |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block E - Roof plan |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block E - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block E - North/East Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block F - Roof plans |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block F - South/West Elevations |
Adobe PDF |
11/10/2022 |
F.I. Received Doc.
Block F - North/East Elevations |
Adobe PDF |
27/10/2022 |
Report Received from Internal Staff
Water Services AI |
Adobe PDF |
03/11/2022 |
Report Received from External Body
Irish Water AI |
Adobe PDF |
07/11/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
07/11/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
15/12/2022 | Final Grant | Adobe PDF |
14/09/2023 |
Submission
Condition 5(c) & (d) |
Adobe PDF |
14/09/2023 |
Submission
Condition 5(c) & (d) |
Adobe PDF |
14/09/2023 |
Submission
Condition 5(c) & (d) |
Adobe PDF |
14/09/2023 |
Submission
Condition 5(c) & (d) |
Adobe PDF |
14/09/2023 |
Submission
Condition 5(c) & (d) |
Adobe PDF |
14/09/2023 |
Submission
Condition 5(c)&(d) - Cover Letter |
Adobe PDF |
22/09/2023 |
Submission
Condition 4 - NFA by P.A. |
Adobe PDF |
22/09/2023 |
Submission
Condition 4 - NFA by P.A. |
Adobe PDF |
22/09/2023 |
Submission
Condition 4 - NFA by P.A. |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
26/04/2024 |
Submission
Condition 5 (c)(d) |
Adobe PDF |
30/04/2024 |
Submission Acknowledgment
Condition 5 (c)(d) resubmission |
Adobe PDF |
19/06/2024 |
Notification of Decision
Condition 5(c) & (d) |
Adobe PDF |
01/08/2024 |
Submission
Condition C5 (C) -2 |
Adobe PDF |
01/08/2024 |
Submission
Condition C5 (C) -2 |
Adobe PDF |
01/08/2024 |
Submission
Condition C5 (C) -2 |
Adobe PDF |
09/08/2024 |
Submission Acknowledgment
Condition C5 (c) -2 |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
03/09/2024 |
Submission
Condition 5(d) |
Adobe PDF |
12/09/2024 |
Submission Acknowledgment
Condition 5(d) |
Adobe PDF |
20/09/2024 |
Notification of Decision
Condition 5 (c ) - Compliant |
Adobe PDF |
22/10/2024 |
Notification of Decision
Condition 5(d) - Not compliant |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
19/11/2024 |
Submission
Condition 5(d) |
Adobe PDF |
26/11/2024 |
Submission Acknowledgment
Condition 5(d) |
Adobe PDF |