- Date Received:
- 24/02/2021
- Last Action:
- 14/12/2021, Clarification of Additional Information
- Application Type:
- Permission
- Submission Type:
- Clarification of Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- EdgeConneX Ireland Limited
- Location:
- Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
- Proposed Development:
- Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
- Decision Due:
- 19/01/2022
Decision Details
- Decision Date:
- 19/01/2022
- Decision:
- GRANT PERMISSION
- Final Grant Date:
- N/A
Appeal to An Bord Pleanala
- Notified:
- 18/02/2022
- Lodged:
- 15/02/2022
- Appellant Type:
- 1 st Party
- Nature of Appeal:
- Condition
Decision of An Bord Pleanala
- Decision Date:
- 09/03/2022
- Decision:
- Appeal Withdrawn
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
24/02/2021 | Acknowledgement / Validation Letter | Adobe PDF |
24/02/2021 | Appendices 3 | Adobe PDF |
24/02/2021 | Appendices 3 | Adobe PDF |
24/02/2021 | Appendices 3 | Adobe PDF |
24/02/2021 | Appendices 3 | Adobe PDF |
24/02/2021 | Application - Cover Letter | Adobe PDF |
24/02/2021 | Application Form - Part A | Adobe PDF |
24/02/2021 | Appropriate Assessment Screening Report | Adobe PDF |
24/02/2021 |
Drainage Network Drawings
Dub 05 Wastewater Details |
Adobe PDF |
24/02/2021 |
Drawings-General
external works gas plant |
Adobe PDF |
24/02/2021 |
EIAR
Part 1 |
Adobe PDF |
24/02/2021 |
EIAR
Part 1 |
Adobe PDF |
24/02/2021 |
EIAR
Part 1 |
Adobe PDF |
24/02/2021 |
EIAR
Non Technical Summary |
Adobe PDF |
24/02/2021 |
Elevations
contig proposed |
Adobe PDF |
24/02/2021 |
Elevations
Proposed North/West |
Adobe PDF |
24/02/2021 |
Elevations
prop East/South |
Adobe PDF |
24/02/2021 |
Elevations
Site access |
Adobe PDF |
24/02/2021 |
Elevations
Power Generation 1 |
Adobe PDF |
24/02/2021 |
Elevations
Power plant 2 |
Adobe PDF |
24/02/2021 |
Floor Plans
ground proposed |
Adobe PDF |
24/02/2021 |
Landscape Plans
Masterplan |
Adobe PDF |
24/02/2021 |
Landscape Plans
Sections |
Adobe PDF |
24/02/2021 |
Landscape Plans
Planting plan |
Adobe PDF |
24/02/2021 |
Landscape Plans
proposed earthworks |
Adobe PDF |
24/02/2021 |
Landscape Plans
Tree Constraints |
Adobe PDF |
24/02/2021 |
Landscape Plans
The Tree File |
Adobe PDF |
24/02/2021 |
Landscape Plans
& Specification |
Adobe PDF |
24/02/2021 | Newspaper Notice | Adobe PDF |
24/02/2021 |
Other Assessments
Heat Recovery Feasibility |
Adobe PDF |
24/02/2021 |
Other Assessments
Flood Risk |
Adobe PDF |
24/02/2021 |
Other Assessments
Engineering |
Adobe PDF |
24/02/2021 |
Other Assessments
Marston Consultants |
Adobe PDF |
24/02/2021 |
Other Assessments
Architectural Design Statement |
Adobe PDF |
24/02/2021 |
Other Assessments
Site Environmental Plan |
Adobe PDF |
24/02/2021 |
Other Assessments
Construction Management Plan |
Adobe PDF |
24/02/2021 | Photo Montage | Adobe PDF |
24/02/2021 |
Plans, Sections, Elevations
Power Plant 2 |
Adobe PDF |
24/02/2021 |
Plans, Sections, Elevations
Power Plant 3 elevations |
Adobe PDF |
24/02/2021 |
Plans, Sections, Elevations
Roof Plan |
Adobe PDF |
24/02/2021 |
Road Layout Plan
Autotrack layout low loader |
Adobe PDF |
24/02/2021 |
Sections
Power generation plant 1 |
Adobe PDF |
24/02/2021 |
Sections
Powerr Generator 3 |
Adobe PDF |
24/02/2021 |
Sections
prop |
Adobe PDF |
24/02/2021 |
Site Layout
permitted |
Adobe PDF |
24/02/2021 |
Site Layout
permitted |
Adobe PDF |
24/02/2021 |
Site Layout
proposed |
Adobe PDF |
24/02/2021 |
Site Layout
Demolished Buildings |
Adobe PDF |
24/02/2021 |
Site Layout
Gas Network |
Adobe PDF |
24/02/2021 |
Site Layout
Data centre drainage |
Adobe PDF |
24/02/2021 |
Site Layout
Drainage Layout |
Adobe PDF |
24/02/2021 |
Site Layout
Gas Plant drainage |
Adobe PDF |
24/02/2021 |
Site Layout
General layout EDUDUB05 |
Adobe PDF |
24/02/2021 |
Site Layout
Gneral Access Layout |
Adobe PDF |
24/02/2021 |
Site Layout
Autotrack layout low loader East |
Adobe PDF |
24/02/2021 |
Site Layout
Crane Acess Gas Plant East |
Adobe PDF |
24/02/2021 |
Site Layout
Autotrack Low Loader GasPlant |
Adobe PDF |
24/02/2021 |
Site Layout
Autotrack Fire Tender |
Adobe PDF |
24/02/2021 |
Site Layout
Autotrack Layout Oil Tanker |
Adobe PDF |
24/02/2021 |
Site Layout
Autotrack Layout Crane |
Adobe PDF |
24/02/2021 |
Site layout plan
Autotrack Layout Firetender |
Adobe PDF |
24/02/2021 |
Site layout plan
Autotrack HGV |
Adobe PDF |
24/02/2021 |
Site layout plan
Autotrack Fire Tender 2 |
Adobe PDF |
24/02/2021 | Site location map | Adobe PDF |
24/02/2021 | Site Notice | Adobe PDF |
24/02/2021 | Traffic Impact Reports | Adobe PDF |
24/02/2021 |
Traffic Impact Reports
Traffic Management Plan |
Adobe PDF |
24/02/2021 |
Water Supply Plans
Dub 05 |
Adobe PDF |
24/02/2021 |
Water Supply Plans
Gas Plant Area |
Adobe PDF |
24/02/2021 |
Water Supply Plans
Gas plant |
Adobe PDF |
24/02/2021 |
Water Supply Plans
Dub 05 & gas plant |
Adobe PDF |
18/03/2021 |
Report Received from External Body
Dept of Defence |
Adobe PDF |
18/03/2021 |
Report Received from External Body
Dept of Defence |
Adobe PDF |
23/03/2021 |
Submission
P. Mac Fhlannchadha |
Adobe PDF |
24/03/2021 |
Drawings-General
EDCDUB05 & Gas Plant |
Adobe PDF |
29/03/2021 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
30/03/2021 |
Report Received from External Body
An Taisce |
Adobe PDF |
30/03/2021 |
Submission
Thornton O'Connor, Town Planning |
Adobe PDF |
31/03/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
06/04/2021 |
Report Received from External Body
Waterways Ireland |
Adobe PDF |
09/04/2021 |
Report Received from Internal Staff
Roads |
Adobe PDF |
19/04/2021 |
Report Received from Internal Staff
Parks |
Adobe PDF |
20/04/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
20/04/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
20/04/2021 |
Report Received from External Body
E.H.O. |
Adobe PDF |
23/04/2021 |
Notification to third parties and State bodies
Advised Add. Info. Requested |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
ack |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Site location map |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
layout plan |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
layout zoning |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Contig elevations |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
proposed contig elev |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
prop bicycle parking |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Drainage layout |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Landscape masterplan |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Landscape Sections |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Landscape proposals |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
tree pit details |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Photos |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Landscape Redport & outline specification |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Tree File management plan |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Arch. Design Statement |
Adobe PDF |
02/09/2021 | F.I. Received Doc. | Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Awn Consulting |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Marston Consultancy |
Adobe PDF |
02/09/2021 |
F.I. Received Doc.
Ethos Engineering |
Adobe PDF |
02/09/2021 | F.I. Received Doc. | Adobe PDF |
22/09/2021 |
Report Received from Internal Staff
Water Services A I |
Adobe PDF |
24/09/2021 |
Report Received from External Body
Irish Water AI |
Adobe PDF |
28/09/2021 |
Report Received from Internal Staff
Parks AI |
Adobe PDF |
29/09/2021 |
Chief Executives Order
Seek Clarification of Additional Information |
Adobe PDF |
29/09/2021 |
Notification of Decision Letters
Seek Clarification of Additional Information |
Adobe PDF |
15/10/2021 |
Application - Cover Letter
notification of Change of Agent |
Adobe PDF |
15/10/2021 |
Chief Executives Order
F.I. Extension Order |
Adobe PDF |
15/10/2021 |
FI period extension request
F.I. Extension Request |
Adobe PDF |
15/10/2021 |
Notification of Decision Letters
F.I. Extension Notification |
Adobe PDF |
14/12/2021 |
F.I. Clarification Letter
SDCC Ack letter |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Clar. of A.I. Response to request |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Arboricultural Report |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Commercial Energy Statement |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Response |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Response from Awnconsulting |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Access & biodiversity 201 |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Landscape Treatment of Bio Swale & Wetland |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Drainage Layout |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Drainage Layout Attenuation Pond & Outfall Plan |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Tree Impacts Plan |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Tree Constraints Plan |
Adobe PDF |
14/12/2021 |
F.I. Received Doc.
Tree Protection Plan |
Adobe PDF |
14/12/2021 |
Notification to third parties and State bodies
Advised of Decision |
Adobe PDF |
08/01/2022 |
Report Received from External Body
Irish Water Clar of A I |
Adobe PDF |
19/01/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
19/01/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
19/01/2022 |
Notification to third parties and State bodies
Advised Decision |
Adobe PDF |
19/01/2022 |
Report Received from Internal Staff
Revised Clar of A I |
Adobe PDF |
21/02/2022 |
Appeal Notification
1st Party appeal |
Adobe PDF |
21/02/2022 |
Notification to third parties and State bodies
3rd party notifications |
Adobe PDF |
07/03/2022 |
Appeal Correspondence
File Cover Letter |
Adobe PDF |
09/03/2022 |
Appeal Decision
Appeal Withdrawn |
Adobe PDF |
11/03/2022 |
Appeal Submission
SDCC response to ABP |
Adobe PDF |
24/03/2022 | Final Grant | Adobe PDF |
28/04/2023 |
Submission
Condition 7 |
Adobe PDF |
28/04/2023 |
Submission
Condition 7 |
Adobe PDF |
28/04/2023 |
Submission
Condition 7 |
Adobe PDF |
28/04/2023 |
Submission
Condition 12 - Arboriculture NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 12 - Arboriculture NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 16 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 16 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 16 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 16 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 10 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 10 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 11 |
Adobe PDF |
28/04/2023 |
Submission
Condition 11 |
Adobe PDF |
28/04/2023 |
Submission
Condition 6 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 6 - NFA |
Adobe PDF |
28/04/2023 |
Submission
Condition 5 |
Adobe PDF |
28/04/2023 |
Submission
Condition 5 |
Adobe PDF |
28/04/2023 |
Submission
Condition 5 |
Adobe PDF |
28/04/2023 |
Submission
Condition 5 |
Adobe PDF |
28/04/2023 |
Submission
Condition 8 |
Adobe PDF |
28/04/2023 |
Submission
Condition 8 |
Adobe PDF |
21/06/2023 |
Notification of Decision Letters
Condition 5 - Compliant |
Adobe PDF |
21/06/2023 |
Notification of Decision Letters
Condition 7 - Partially compliant (Not 7 (ii) (b) |
Adobe PDF |
21/06/2023 |
Notification of Decision Letters
Condition 11 - Compliant |
Adobe PDF |
21/06/2023 |
Notification of Decision Letters
Condition 8 -Partially compliant (only 8(a) |
Adobe PDF |
09/08/2023 |
Submission
Condition 4(a) |
Adobe PDF |
09/08/2023 |
Submission
Condition 4(a) |
Adobe PDF |