View Application SD22A/0156

View Application SD22A/0156

Date Received:
30/05/2022
Last Action:
30/05/2022
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
Equinix (Ireland) Ltd
Location:
Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
Proposed Development:
10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.
Decision Due:
24/07/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
30/05/2022 Acknowledgement / Validation Letter Adobe PDF
30/05/2022 Acknowledgement / Validation Letter Adobe PDF
30/05/2022 Application - Cover Letter
& Doc schedule
Adobe PDF
30/05/2022 Application Form - Part A Adobe PDF
30/05/2022 Drainage Network Drawings
Site drainage
Adobe PDF
30/05/2022 Drawings-General
Proposed masterplan
Adobe PDF
30/05/2022 Drawings-General
Roof layout
Adobe PDF
30/05/2022 Drawings-General
proposed fencing 1
Adobe PDF
30/05/2022 Drawings-General
proposed fencing
Adobe PDF
30/05/2022 Drawings-General
prop ancillary building
Adobe PDF
30/05/2022 Drawings-General
Ancillary buildings 2
Adobe PDF
30/05/2022 Drawings-General
Ancillary buildings 3
Adobe PDF
30/05/2022 Drawings-General
power generator elevations
Adobe PDF
30/05/2022 Drawings-General
External Lighting Design Report
Adobe PDF
30/05/2022 Drawings-General
foul water drainage
Adobe PDF
30/05/2022 Drawings-General
power generation
Adobe PDF
30/05/2022 Drawings-General
external works layout
Adobe PDF
30/05/2022 Drawings-General
Suds details
Adobe PDF
30/05/2022 Drawings-General
Tree Survey
Adobe PDF
30/05/2022 Drawings-General
Schedule
Adobe PDF
30/05/2022 Drawings-General
External lighting 1
Adobe PDF
30/05/2022 Drawings-General
external lighting
Adobe PDF
30/05/2022 Drawings-General
External lighting layout light tresspass
Adobe PDF
30/05/2022 Drawings-General
External Lighting Design Report
Adobe PDF
30/05/2022 Elevations
Sheet 1
Adobe PDF
30/05/2022 Elevations
sheet 2
Adobe PDF
30/05/2022 Floor Plans
proposed ground
Adobe PDF
30/05/2022 Floor Plans
proposed first
Adobe PDF
30/05/2022 Floor Plans
proposed second
Adobe PDF
30/05/2022 Landscape Design Report Adobe PDF
30/05/2022 Landscape Plans
masterplan
Adobe PDF
30/05/2022 Landscape Plans
break out space
Adobe PDF
30/05/2022 Landscape Plans
sections
Adobe PDF
30/05/2022 Landscape Plans
Sections Compliance Update
Adobe PDF
30/05/2022 Landscape Plans
1/4
Adobe PDF
30/05/2022 Landscape Plans
2
Adobe PDF
30/05/2022 Landscape Plans
3
Adobe PDF
30/05/2022 Landscape Plans
Design 4
Adobe PDF
30/05/2022 Newspaper Notice Adobe PDF
30/05/2022 Other Assessments
Biodiversity plan
Adobe PDF
30/05/2022 Other Assessments
Pinnacle Engr's report
Adobe PDF
30/05/2022 Other Assessments
External lighting 1 Isolines
Adobe PDF
30/05/2022 Other Assessments
external lighting layout Phase 1 prop
Adobe PDF
30/05/2022 Other Assessments
external lighting 2
Adobe PDF
30/05/2022 Other Assessments
Archt. Design Statement
Adobe PDF
30/05/2022 Other Assessments
Planning Application Report
Adobe PDF
30/05/2022 Other Assessments
Archaeoligocal Assessment
Adobe PDF
30/05/2022 Other Assessments
Constr. Environ. Management Plan
Adobe PDF
30/05/2022 Other Assessments
Ecological Impact
Adobe PDF
30/05/2022 Other Assessments
Natura Impact Statement
Adobe PDF
30/05/2022 Plans, Sections, Elevations
Roof level plant layout
Adobe PDF
30/05/2022 Sections
proposed
Adobe PDF
30/05/2022 Sections
proposed
Adobe PDF
30/05/2022 Sections
Pwer generator
Adobe PDF
30/05/2022 Site assessment report
Technical Report
Adobe PDF
30/05/2022 Site assessment report Adobe PDF
30/05/2022 Site Layout
existing constraints
Adobe PDF
30/05/2022 Site Layout
proposed
Adobe PDF
30/05/2022 Site layout plan
proposed
Adobe PDF
30/05/2022 Site layout plan
Power generation compound
Adobe PDF
30/05/2022 Site layout plan
Lighting phase 1
Adobe PDF
30/05/2022 Site location map Adobe PDF
30/05/2022 Site location map
Site boundaries & topography
Adobe PDF
30/05/2022 Site Notice Adobe PDF
30/05/2022 Visual Assessment Report Adobe PDF
30/05/2022 Water Supply Plans
Surface water & Suds
Adobe PDF
31/05/2022 Other Assessments
Arboricultural Impact Plan
Adobe PDF
21/06/2022 Drawings-General
Doc schedule
Adobe PDF
27/06/2022 Report Received from External Body
T I I
Adobe PDF
28/06/2022 Submission
P Mac Fhlannchadha
Adobe PDF
30/06/2022 Report Received from Internal Staff
Parks
Adobe PDF
01/07/2022 Report Received from External Body
EHO
Adobe PDF
05/07/2022 Submission
BKC Solicitors
Adobe PDF
18/07/2022 Report Received from Internal Staff
Water Services
Adobe PDF
19/07/2022 Report Received from External Body
Irish Water
Adobe PDF
25/07/2022 Chief Executives Order
Request Additional Information
Adobe PDF
25/07/2022 Notification of Decision Letters
Request Additional Information
Adobe PDF
25/07/2022 Notification to third parties and State bodies
Notify Request Additional Information
Adobe PDF
21/10/2022 F.I. Receipt Ack. Letter
S.D.C.C.'s ack. letter
Adobe PDF
21/10/2022 F.I. Received Doc.
Agent's response to A.I. request
Adobe PDF
21/10/2022 F.I. Received Doc.
Appl's response to A.I. request
Adobe PDF
21/10/2022 F.I. Received Doc.
Drawing Schedule
Adobe PDF
21/10/2022 F.I. Received Doc.
Visual Impact Assessment
Adobe PDF
21/10/2022 F.I. Received Doc.
E.I. A. - Screening report
Adobe PDF
21/10/2022 F.I. Received Doc.
Power generation Compound Elevations
Adobe PDF
21/10/2022 F.I. Received Doc.
Cumulative Air Quality Assessmt.
Adobe PDF
21/10/2022 F.I. Received Doc.
Dept. of Defence letter
Adobe PDF
21/10/2022 F.I. Received Doc.
Aviation Impact Assessment
Adobe PDF
21/10/2022 F.I. Received Doc.
Thermal Plume Technical report
Adobe PDF
21/10/2022 F.I. Received Doc.
Engineer;s response to A.I. request
Adobe PDF
21/10/2022 F.I. Received Doc.
Surface water site drainage
Adobe PDF
21/10/2022 F.I. Received Doc.
Drainage & Levels layout
Adobe PDF
21/10/2022 F.I. Received Doc.
External Works layout
Adobe PDF
21/10/2022 F.I. Received Doc.
Surface water cathcment/Suds features
Adobe PDF
21/10/2022 F.I. Received Doc.
Suds details
Adobe PDF
21/10/2022 Notification to third parties and State bodies
Advised Add.Info. Received
Adobe PDF
07/11/2022 Report Received from Internal Staff
Water Services AI
Adobe PDF
10/11/2022 Report Received from External Body
Irish Water AI
Adobe PDF
17/11/2022 Chief Executives Order
Seek Clarification of Additional Information
Adobe PDF
17/11/2022 Notification of Decision Letters
Seek Clarification of Additional Information
Adobe PDF
22/11/2022 Notification to third parties and State bodies
Advised Clar. of A.I. requested
Adobe PDF
28/11/2022 Report Received from External Body
I.A.A. - A.I.
Adobe PDF
07/12/2022 Chief Executives Order
Clar. A.I. Extension Order
Adobe PDF
07/12/2022 Notification of Decision Letters
Clar. A.I. Extension Notification
Adobe PDF
12/12/2022 FI period extension request
Letter from Agent
Adobe PDF
26/04/2023 F.I. Clarification Letter
SDCC Clar. A.I. ack letter
Adobe PDF
26/04/2023 F.I. Clarification Letter
Agent's response to A.I. request
Adobe PDF
26/04/2023 F.I. Clarification Letter
Drawing Schedule
Adobe PDF
26/04/2023 F.I. Received Doc.
Proposed masterplan
Adobe PDF
26/04/2023 F.I. Received Doc.
Proposed Site layout
Adobe PDF
26/04/2023 F.I. Received Doc.
Biodiversity plan
Adobe PDF
26/04/2023 F.I. Received Doc.
Typical L'scape design details
Adobe PDF
26/04/2023 F.I. Received Doc.
Site power Generation Compound Elevations
Adobe PDF
26/04/2023 F.I. Received Doc.
EIA Portal Notification
Adobe PDF
26/04/2023 F.I. Received Doc.
Green factor calculations
Adobe PDF
26/04/2023 F.I. Received Doc.
Sign up to climate neutral data doc
Adobe PDF
26/04/2023 F.I. Received Doc.
Irish Water doc.
Adobe PDF
26/04/2023 F.I. Received Doc.
Envir. Impact - Volume 3 - Appendices
Adobe PDF
26/04/2023 F.I. Received Doc.
Envir. Impact - Assessmt. rpt - Volume 1 Non-Tech
Adobe PDF
26/04/2023 F.I. Received Doc.
Envir. Impact Assessmt rpt - Volume 2
Adobe PDF
26/04/2023 F.I. Received Doc.
Archt. Design Statement
Adobe PDF
26/04/2023 F.I. Received Doc.
Energy Statement & Part L Compliance rpt.
Adobe PDF
02/05/2023 Notification to third parties and State bodies
Notified Clar of A.I. Received
Adobe PDF
08/05/2023 Report Received from External Body
T.I.I. Clar of AI
Adobe PDF
19/05/2023 Report Received from External Body
AI Inland Fisheries Ireland
Adobe PDF
12/06/2023 Correspondence with Planning Authority
Request for Revised Public Notices
Adobe PDF
14/06/2023 F.I. Clarification Letter
Sig. Clar. of A.I. cover letter
Adobe PDF
14/06/2023 Notification to third parties and State bodies
Notify Sig. Clar. A.I. received
Adobe PDF
14/06/2023 Significant FI News Paper Notice
Revised advert.
Adobe PDF
14/06/2023 Significant FI Site Notice
Revised Site notice.
Adobe PDF
16/06/2023 F.I. Clarification Letter
SDCC Sig. Clar. of A.I. ack letter
Adobe PDF
24/06/2023 Report Received from External Body
Irish Water Sig Clar AI
Adobe PDF
26/06/2023 Submission
J. Callaghan {Sig. Clar. of. A.I. }
Adobe PDF
26/06/2023 Submission
L. Doran {Sig. Clar. of A.I. }
Adobe PDF
28/06/2023 Report Received from External Body
T.I.I Sig A.I
Adobe PDF
11/07/2023 Report Received from External Body
EHO Sig AI
Adobe PDF
08/08/2023 Chief Executives Order
Refuse Permission
Adobe PDF
09/08/2023 Notification of Decision Letters
Refuse Permission
Adobe PDF
11/08/2023 Notification to third parties and State bodies
Notify of Refusal
Adobe PDF
05/09/2023 Appeal Notification
1st Party Appeal to A.B.P.
Adobe PDF
05/09/2023 Notification to third parties and State bodies
Notify of Appeal lodged to ABP
Adobe PDF
21/09/2023 Appeal Submission
S.D.C.C. Response to A.B.P.
Adobe PDF
25/09/2023 Appeal Correspondence
A.B.P.'s ack. letter
Adobe PDF
16/01/2024 Appeal Correspondence Adobe PDF
09/04/2024 Appeal Correspondence
Notification of Ext to Decision
Adobe PDF