- Date Received:
- 30/05/2022
- Last Action:
- 30/05/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Equinix (Ireland) Ltd
- Location:
- Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22
- Proposed Development:
- 10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.
- Decision Due:
- 24/07/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
30/05/2022 | Acknowledgement / Validation Letter | Adobe PDF |
30/05/2022 | Acknowledgement / Validation Letter | Adobe PDF |
30/05/2022 |
Application - Cover Letter
& Doc schedule |
Adobe PDF |
30/05/2022 | Application Form - Part A | Adobe PDF |
30/05/2022 |
Drainage Network Drawings
Site drainage |
Adobe PDF |
30/05/2022 |
Drawings-General
Proposed masterplan |
Adobe PDF |
30/05/2022 |
Drawings-General
Roof layout |
Adobe PDF |
30/05/2022 |
Drawings-General
proposed fencing 1 |
Adobe PDF |
30/05/2022 |
Drawings-General
proposed fencing |
Adobe PDF |
30/05/2022 |
Drawings-General
prop ancillary building |
Adobe PDF |
30/05/2022 |
Drawings-General
Ancillary buildings 2 |
Adobe PDF |
30/05/2022 |
Drawings-General
Ancillary buildings 3 |
Adobe PDF |
30/05/2022 |
Drawings-General
power generator elevations |
Adobe PDF |
30/05/2022 |
Drawings-General
External Lighting Design Report |
Adobe PDF |
30/05/2022 |
Drawings-General
foul water drainage |
Adobe PDF |
30/05/2022 |
Drawings-General
power generation |
Adobe PDF |
30/05/2022 |
Drawings-General
external works layout |
Adobe PDF |
30/05/2022 |
Drawings-General
Suds details |
Adobe PDF |
30/05/2022 |
Drawings-General
Tree Survey |
Adobe PDF |
30/05/2022 |
Drawings-General
Schedule |
Adobe PDF |
30/05/2022 |
Drawings-General
External lighting 1 |
Adobe PDF |
30/05/2022 |
Drawings-General
external lighting |
Adobe PDF |
30/05/2022 |
Drawings-General
External lighting layout light tresspass |
Adobe PDF |
30/05/2022 |
Drawings-General
External Lighting Design Report |
Adobe PDF |
30/05/2022 |
Elevations
Sheet 1 |
Adobe PDF |
30/05/2022 |
Elevations
sheet 2 |
Adobe PDF |
30/05/2022 |
Floor Plans
proposed ground |
Adobe PDF |
30/05/2022 |
Floor Plans
proposed first |
Adobe PDF |
30/05/2022 |
Floor Plans
proposed second |
Adobe PDF |
30/05/2022 | Landscape Design Report | Adobe PDF |
30/05/2022 |
Landscape Plans
masterplan |
Adobe PDF |
30/05/2022 |
Landscape Plans
break out space |
Adobe PDF |
30/05/2022 |
Landscape Plans
sections |
Adobe PDF |
30/05/2022 |
Landscape Plans
Sections Compliance Update |
Adobe PDF |
30/05/2022 |
Landscape Plans
1/4 |
Adobe PDF |
30/05/2022 |
Landscape Plans
2 |
Adobe PDF |
30/05/2022 |
Landscape Plans
3 |
Adobe PDF |
30/05/2022 |
Landscape Plans
Design 4 |
Adobe PDF |
30/05/2022 | Newspaper Notice | Adobe PDF |
30/05/2022 |
Other Assessments
Biodiversity plan |
Adobe PDF |
30/05/2022 |
Other Assessments
Pinnacle Engr's report |
Adobe PDF |
30/05/2022 |
Other Assessments
External lighting 1 Isolines |
Adobe PDF |
30/05/2022 |
Other Assessments
external lighting layout Phase 1 prop |
Adobe PDF |
30/05/2022 |
Other Assessments
external lighting 2 |
Adobe PDF |
30/05/2022 |
Other Assessments
Archt. Design Statement |
Adobe PDF |
30/05/2022 |
Other Assessments
Planning Application Report |
Adobe PDF |
30/05/2022 |
Other Assessments
Archaeoligocal Assessment |
Adobe PDF |
30/05/2022 |
Other Assessments
Constr. Environ. Management Plan |
Adobe PDF |
30/05/2022 |
Other Assessments
Ecological Impact |
Adobe PDF |
30/05/2022 |
Other Assessments
Natura Impact Statement |
Adobe PDF |
30/05/2022 |
Plans, Sections, Elevations
Roof level plant layout |
Adobe PDF |
30/05/2022 |
Sections
proposed |
Adobe PDF |
30/05/2022 |
Sections
proposed |
Adobe PDF |
30/05/2022 |
Sections
Pwer generator |
Adobe PDF |
30/05/2022 |
Site assessment report
Technical Report |
Adobe PDF |
30/05/2022 | Site assessment report | Adobe PDF |
30/05/2022 |
Site Layout
existing constraints |
Adobe PDF |
30/05/2022 |
Site Layout
proposed |
Adobe PDF |
30/05/2022 |
Site layout plan
proposed |
Adobe PDF |
30/05/2022 |
Site layout plan
Power generation compound |
Adobe PDF |
30/05/2022 |
Site layout plan
Lighting phase 1 |
Adobe PDF |
30/05/2022 | Site location map | Adobe PDF |
30/05/2022 |
Site location map
Site boundaries & topography |
Adobe PDF |
30/05/2022 | Site Notice | Adobe PDF |
30/05/2022 | Visual Assessment Report | Adobe PDF |
30/05/2022 |
Water Supply Plans
Surface water & Suds |
Adobe PDF |
31/05/2022 |
Other Assessments
Arboricultural Impact Plan |
Adobe PDF |
21/06/2022 |
Drawings-General
Doc schedule |
Adobe PDF |
27/06/2022 |
Report Received from External Body
T I I |
Adobe PDF |
28/06/2022 |
Submission
P Mac Fhlannchadha |
Adobe PDF |
30/06/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
01/07/2022 |
Report Received from External Body
EHO |
Adobe PDF |
05/07/2022 |
Submission
BKC Solicitors |
Adobe PDF |
18/07/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
19/07/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
25/07/2022 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
25/07/2022 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
25/07/2022 |
Notification to third parties and State bodies
Notify Request Additional Information |
Adobe PDF |
21/10/2022 |
F.I. Receipt Ack. Letter
S.D.C.C.'s ack. letter |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Agent's response to A.I. request |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Appl's response to A.I. request |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Drawing Schedule |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Visual Impact Assessment |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
E.I. A. - Screening report |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Power generation Compound Elevations |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Cumulative Air Quality Assessmt. |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Dept. of Defence letter |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Aviation Impact Assessment |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Thermal Plume Technical report |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Engineer;s response to A.I. request |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Surface water site drainage |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Drainage & Levels layout |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
External Works layout |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Surface water cathcment/Suds features |
Adobe PDF |
21/10/2022 |
F.I. Received Doc.
Suds details |
Adobe PDF |
21/10/2022 |
Notification to third parties and State bodies
Advised Add.Info. Received |
Adobe PDF |
07/11/2022 |
Report Received from Internal Staff
Water Services AI |
Adobe PDF |
10/11/2022 |
Report Received from External Body
Irish Water AI |
Adobe PDF |
17/11/2022 |
Chief Executives Order
Seek Clarification of Additional Information |
Adobe PDF |
17/11/2022 |
Notification of Decision Letters
Seek Clarification of Additional Information |
Adobe PDF |
22/11/2022 |
Notification to third parties and State bodies
Advised Clar. of A.I. requested |
Adobe PDF |
28/11/2022 |
Report Received from External Body
I.A.A. - A.I. |
Adobe PDF |
07/12/2022 |
Chief Executives Order
Clar. A.I. Extension Order |
Adobe PDF |
07/12/2022 |
Notification of Decision Letters
Clar. A.I. Extension Notification |
Adobe PDF |
12/12/2022 |
FI period extension request
Letter from Agent |
Adobe PDF |
26/04/2023 |
F.I. Clarification Letter
SDCC Clar. A.I. ack letter |
Adobe PDF |
26/04/2023 |
F.I. Clarification Letter
Agent's response to A.I. request |
Adobe PDF |
26/04/2023 |
F.I. Clarification Letter
Drawing Schedule |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Proposed masterplan |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Proposed Site layout |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Biodiversity plan |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Typical L'scape design details |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Site power Generation Compound Elevations |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
EIA Portal Notification |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Green factor calculations |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Sign up to climate neutral data doc |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Irish Water doc. |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Envir. Impact - Volume 3 - Appendices |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Envir. Impact - Assessmt. rpt - Volume 1 Non-Tech |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Envir. Impact Assessmt rpt - Volume 2 |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Archt. Design Statement |
Adobe PDF |
26/04/2023 |
F.I. Received Doc.
Energy Statement & Part L Compliance rpt. |
Adobe PDF |
02/05/2023 |
Notification to third parties and State bodies
Notified Clar of A.I. Received |
Adobe PDF |
08/05/2023 |
Report Received from External Body
T.I.I. Clar of AI |
Adobe PDF |
19/05/2023 |
Report Received from External Body
AI Inland Fisheries Ireland |
Adobe PDF |
12/06/2023 |
Correspondence with Planning Authority
Request for Revised Public Notices |
Adobe PDF |
14/06/2023 |
F.I. Clarification Letter
Sig. Clar. of A.I. cover letter |
Adobe PDF |
14/06/2023 |
Notification to third parties and State bodies
Notify Sig. Clar. A.I. received |
Adobe PDF |
14/06/2023 |
Significant FI News Paper Notice
Revised advert. |
Adobe PDF |
14/06/2023 |
Significant FI Site Notice
Revised Site notice. |
Adobe PDF |
16/06/2023 |
F.I. Clarification Letter
SDCC Sig. Clar. of A.I. ack letter |
Adobe PDF |
24/06/2023 |
Report Received from External Body
Irish Water Sig Clar AI |
Adobe PDF |
26/06/2023 |
Submission
J. Callaghan {Sig. Clar. of. A.I. } |
Adobe PDF |
26/06/2023 |
Submission
L. Doran {Sig. Clar. of A.I. } |
Adobe PDF |
28/06/2023 |
Report Received from External Body
T.I.I Sig A.I |
Adobe PDF |
11/07/2023 |
Report Received from External Body
EHO Sig AI |
Adobe PDF |
08/08/2023 |
Chief Executives Order
Refuse Permission |
Adobe PDF |
09/08/2023 |
Notification of Decision Letters
Refuse Permission |
Adobe PDF |
11/08/2023 |
Notification to third parties and State bodies
Notify of Refusal |
Adobe PDF |
05/09/2023 |
Appeal Notification
1st Party Appeal to A.B.P. |
Adobe PDF |
05/09/2023 |
Notification to third parties and State bodies
Notify of Appeal lodged to ABP |
Adobe PDF |
21/09/2023 |
Appeal Submission
S.D.C.C. Response to A.B.P. |
Adobe PDF |
25/09/2023 |
Appeal Correspondence
A.B.P.'s ack. letter |
Adobe PDF |
16/01/2024 | Appeal Correspondence | Adobe PDF |
09/04/2024 |
Appeal Correspondence
Notification of Ext to Decision |
Adobe PDF |