Planning Banner Image

View Application SD22A/0333

View Application SD22A/0333

Date Received:
16/08/2022
Last Action:
16/08/2022
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
EdgeConneX Ireland Limited
Location:
Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
Proposed Development:
Construction of 2 adjoined single storey data centres with associated office and service areas with an overall gross floor area of 15,274sq.m comprising of the construction of 2 adjoined single storey data centres with a gross floor area of 12,859sq.m that will include a single storey goods receiving area / store and single storey office area (2,415sq.m) with PV panels above, located to the east of the data centres as well as associated water tower, sprinkler tank, pump house and other services; The data centres will also include plant at roof level; with 24 standby diesel generators with associated flues (each 25m high) that will be located within a generator yard to the west of the data centres; New internal access road and security gates to serve the proposed development that will provide access to 36 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; New attenuation ponds to the north of the proposed data centres; Green walls are proposed to the south and east that will enclose the water tower and pump house compound; The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage; The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and Ref. SD21A/0042; The site will remain enclosed by landscaping to all boundaries; The development will be accessed off the R120 via the permitted access granted under SDCC Planning Ref. SD19A/0042 / ABP Ref. PL06S.305948 and SD21A/0042; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Decision Due:
10/10/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
15/08/2022 Plans, Sections, Elevations
Road constr. details
Adobe PDF
15/08/2022 Road Layout Plan
Kerb details
Adobe PDF
16/08/2022 Acknowledgement / Validation Letter Adobe PDF
16/08/2022 Application - Cover Letter
& Document schedule
Adobe PDF
16/08/2022 Application Form - Part A Adobe PDF
16/08/2022 Appropriate Assessment Screening Report Adobe PDF
16/08/2022 Contiguous Building Elevations Adobe PDF
16/08/2022 cut & fill formation Adobe PDF
16/08/2022 Drainage Network Drawings
Waste water & infrastructure details
Adobe PDF
16/08/2022 Drainage Network Drawings
Standard water Infracsture
Adobe PDF
16/08/2022 Drawings-General
Commercial Energy Statement
Adobe PDF
16/08/2022 Drawings-General
tree constraints plan
Adobe PDF
16/08/2022 Drawings-General
tree constraints plan
Adobe PDF
16/08/2022 EIAR
Appendices
Adobe PDF
16/08/2022 EIAR
Appendices
Adobe PDF
16/08/2022 Elevations
proposed
Adobe PDF
16/08/2022 Floor Plans
Proposed roof plan
Adobe PDF
16/08/2022 Landscape Plans
outline specs
Adobe PDF
16/08/2022 Landscape Plans
Masterplan
Adobe PDF
16/08/2022 Landscape Plans
Sections
Adobe PDF
16/08/2022 Landscape Plans
planting plan
Adobe PDF
16/08/2022 Landscape Plans
Treatment
Adobe PDF
16/08/2022 Landscape Plans
Tree Impacts Plan
Adobe PDF
16/08/2022 Landscape Plans
Tree Impacts Plan
Adobe PDF
16/08/2022 Landscape Plans
Tree Protection plan
Adobe PDF
16/08/2022 Layout permitted Adobe PDF
16/08/2022 Newspaper Notice Adobe PDF
16/08/2022 Other Assessments
Flood Risk
Adobe PDF
16/08/2022 Other Assessments
Traffic management
Adobe PDF
16/08/2022 Other Assessments
Transport statement
Adobe PDF
16/08/2022 Other Assessments
Transport statement
Adobe PDF
16/08/2022 Other Assessments
Auto-track Fire Tender
Adobe PDF
16/08/2022 Other Assessments
Eng. Planning Report
Adobe PDF
16/08/2022 Other Assessments
Eng. Planning Report
Adobe PDF
16/08/2022 Other Assessments
The Tree File
Adobe PDF
16/08/2022 Other Assessments
The Tree File
Adobe PDF
16/08/2022 Other Assessments
Construction & Environmental Plan
Adobe PDF
16/08/2022 Other Assessments
Environmental Impact Assessment Report
Adobe PDF
16/08/2022 Photo Montage Adobe PDF
16/08/2022 Plans, Sections, Elevations
Prop site access
Adobe PDF
16/08/2022 Plans, Sections, Elevations
proposed drainage
Adobe PDF
16/08/2022 Sections
proposed
Adobe PDF
16/08/2022 Site Layout
proposed masterplaan
Adobe PDF
16/08/2022 Site Layout
proposed
Adobe PDF
16/08/2022 Site Layout
General Access
Adobe PDF
16/08/2022 Site Layout
General Layout
Adobe PDF
16/08/2022 Site Layout
Auto track HGV
Adobe PDF
16/08/2022 Site Layout
Autotrack Crane
Adobe PDF
16/08/2022 Site Layout
proposed levels & water layout
Adobe PDF
16/08/2022 Site Layout
External works
Adobe PDF
16/08/2022 Site Layout
prop ponds
Adobe PDF
16/08/2022 Site Layout
Auto track oil tanker
Adobe PDF
16/08/2022 Site Layout
electrical services
Adobe PDF
16/08/2022 Site layout plan
Auto Track Low loader
Adobe PDF
16/08/2022 Site location map Adobe PDF
16/08/2022 Site Notice Adobe PDF
01/09/2022 Submission
F Mac Fhlannchadha
Adobe PDF
06/09/2022 Report Received from External Body
Department of Defence
Adobe PDF
14/09/2022 Report Received from External Body
T.I.I.
Adobe PDF
15/09/2022 Report Received from External Body
Inland Fisheries Ireland
Adobe PDF
16/09/2022 Report Received from External Body
I. A. A.
Adobe PDF
19/09/2022 Submission
J Callaghan
Adobe PDF
26/09/2022 Report Received from Internal Staff
Water Services
Adobe PDF
28/09/2022 Report Received from External Body
Irish Water
Adobe PDF
03/10/2022 EIAR
Envir. Impact Assessment rpt
Adobe PDF
03/10/2022 EIAR
Envir. Impact Assessment rpt
Adobe PDF
04/10/2022 Report Received from Internal Staff
Parks
Adobe PDF
07/10/2022 Report Received from External Body
E.H.O.
Adobe PDF
10/10/2022 Chief Executives Order
Request Additional Information
Adobe PDF
10/10/2022 Notification of Decision Letters
Request Additional Information
Adobe PDF
14/10/2022 Notification to third parties and State bodies
Advised Add.Info. Requested
Adobe PDF
21/03/2023 Time Extension Request Letter
Marston Planning Consultancy
Adobe PDF
29/03/2023 Chief Executives Order
FI Time Extension
Adobe PDF
29/03/2023 Notification of Decision Letters
FI Time Extension
Adobe PDF
26/05/2023 F.I. Receipt Ack. Letter
S.D.C.C. ack. letter
Adobe PDF
26/05/2023 F.I. Received Doc.
Henry J Lyons Cover Letter
Adobe PDF
26/05/2023 F.I. Received Doc.
Marston Cover Letter
Adobe PDF
26/05/2023 F.I. Received Doc.
Proposed site master plan
Adobe PDF
26/05/2023 F.I. Received Doc.
Proposed site layout plan
Adobe PDF
26/05/2023 F.I. Received Doc.
Proposed security fence plan1
Adobe PDF
26/05/2023 F.I. Received Doc.
Architectural Design Statement HJL
Adobe PDF
26/05/2023 F.I. Received Doc.
Pinnacle Consulting Engineers Letter
Adobe PDF
26/05/2023 F.I. Received Doc.
Proposed drainage layout
Adobe PDF
26/05/2023 F.I. Received Doc.
Travel Plan
Adobe PDF
26/05/2023 F.I. Received Doc.
Travel Plan
Adobe PDF
26/05/2023 F.I. Received Doc.
Travel Plan
Adobe PDF
26/05/2023 F.I. Received Doc.
Commercial Energy Statement
Adobe PDF
26/05/2023 F.I. Received Doc.
AWN Consulting Environmental Noise letter
Adobe PDF
26/05/2023 F.I. Received Doc.
Scott Cawley Addendum No. 1 Technical Note
Adobe PDF
26/05/2023 F.I. Received Doc.
Wildlife Aviation Impact Assessment
Adobe PDF
26/05/2023 F.I. Received Doc.
Solar Aviation Impact Assessment
Adobe PDF
26/05/2023 F.I. Received Doc.
Emissions Aviation Impact Assessment
Adobe PDF
26/05/2023 F.I. Received Doc.
Method Statement Photo montage production
Adobe PDF
26/05/2023 F.I. Received Doc.
Method Statement Photo montage production
Adobe PDF
26/05/2023 F.I. Received Doc.
Method Statement without landscape proposals Photo
Adobe PDF
26/05/2023 F.I. Received Doc.
Landscape Proposals Landscape Masterplan
Adobe PDF
26/05/2023 F.I. Received Doc.
Landscape treatment of bio swale & wetland edge
Adobe PDF
26/05/2023 F.I. Received Doc.
Green infrastructure strategy diagrame
Adobe PDF
26/05/2023 F.I. Received Doc.
Tree Impacts Plan Drg
Adobe PDF
26/05/2023 F.I. Received Doc.
Tree Protection Plan Drg
Adobe PDF
26/05/2023 F.I. Received Doc.
Tree Constraints Plan Drg
Adobe PDF
26/05/2023 F.I. Received Doc.
Arboricultural Report
Adobe PDF
26/05/2023 F.I. Received Doc.
EIAR Appendices
Adobe PDF
26/05/2023 F.I. Received Doc.
EIAR A I Response
Adobe PDF
26/05/2023 F.I. Received Doc.
EIAR Non Technical Summary
Adobe PDF
26/05/2023 Notification to third parties and State bodies
AI received
Adobe PDF
12/06/2023 Report Received from External Body
T.I.I A.I.
Adobe PDF
17/06/2023 Report Received from External Body
Irish Water AI
Adobe PDF
07/07/2023 Report Received from Internal Staff
Roads AI
Adobe PDF
13/07/2023 Report Received from External Body
EHO AI
Adobe PDF
13/07/2023 Report Received from Internal Staff
Parks AI
Adobe PDF
20/07/2023 Chief Executives Order
REFUSE PERMISSION
Adobe PDF
21/07/2023 Notification of Decision Letters
REFUSE PERMISSION
Adobe PDF
28/07/2023 Notification to third parties and State bodies
Notify of Decision
Adobe PDF
16/08/2023 Appeal Notification
1st Party Appeal to A.B.P.
Adobe PDF
16/08/2023 Appeal Notification
1st Party Appeal to A.B.P.
Adobe PDF
23/08/2023 Appeal Submission
S.D.C.C. reply to A.B.P
Adobe PDF
18/12/2023 Appeal Correspondence
A.B.P.'s Decision date extn.
Adobe PDF
21/03/2024 Appeal Correspondence
Decision Date Extension
Adobe PDF