- Date Received:
- 15/06/2021
- Last Action:
- 23/11/2021, Additional Information
- Application Type:
- Permission
- Submission Type:
- Additional Information
- Closing Date for Submissions:
- Closed
- Applicant:
- Declan Heery & Liz McGrath
- Location:
- 432A, Orwell Park Green, Dublin 6W
- Proposed Development:
- First floor rear extension; two storey side extension; removal of main existing pitched roof on dwelling and replacement of same with a mixture of pitch and flat roof; 1 'Velux' window in front and rear of new roof; 3 'Velux' windows in side north face of new roof; 1 dormer structure with 3 obscure windows on side south face of new roof; all associated site works.
- Decision Due:
- 20/12/2021
Decision Details
- Decision Date:
- 16/12/2021
- Decision:
- REFUSE PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
15/06/2021 | Acknowledgement / Validation Letter | Adobe PDF |
15/06/2021 |
Application - Cover Letter
& Photos |
Adobe PDF |
15/06/2021 |
Application - Cover Letter
document schedule |
Adobe PDF |
15/06/2021 | Application Form - Part A | Adobe PDF |
15/06/2021 |
Drainage Network Drawings
report on existing water & foul sewer |
Adobe PDF |
15/06/2021 |
Elevations
& Sections existing |
Adobe PDF |
15/06/2021 |
Elevations
proposed South Side |
Adobe PDF |
15/06/2021 |
Elevations
proposed West |
Adobe PDF |
15/06/2021 |
Floor Plans
existing |
Adobe PDF |
15/06/2021 |
Floor Plans
proposed ground & first |
Adobe PDF |
15/06/2021 | Newspaper Notice | Adobe PDF |
15/06/2021 |
Sections
& Elevations proposed |
Adobe PDF |
15/06/2021 |
Site Layout
& drainage |
Adobe PDF |
15/06/2021 |
Site Layout
proposed |
Adobe PDF |
15/06/2021 |
Site Layout
proposed attic & drainage layout |
Adobe PDF |
15/06/2021 | Site location map | Adobe PDF |
15/06/2021 | Site Notice | Adobe PDF |
25/07/2021 |
Report Received from External Body
Irish Water |
Adobe PDF |
09/08/2021 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
09/08/2021 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
23/11/2021 |
F.I. Publication Request Letter
Report on Existing Water main and foul sewer |
Adobe PDF |
23/11/2021 |
F.I. Receipt Ack. Letter
SDCC Ack letter |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Cover Letter |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Cover letter from Irish Water |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Proposed Site Layout Plan |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Revised Front & Rear Elevations |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Revised side North & South facing Elevations |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Proposed Ground Floor & Drainage Layout Plan |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Existing Site & Drainage Layout Plan |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Section C-C |
Adobe PDF |
23/11/2021 |
F.I. Received Doc.
Revised Attic & First Floor Plans |
Adobe PDF |
16/12/2021 |
Chief Executives Order
Refuse Permission |
Adobe PDF |
16/12/2021 |
Notification of Decision Letters
Refuse Permission |
Adobe PDF |