- Date Received:
- 20/09/2022
- Last Action:
- 20/09/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Certas Energy Ireland Limited
- Location:
- Fonthill Road, Liffey Valley, Clondalkin, Dublin 22
- Proposed Development:
- A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.) ; 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
- Decision Due:
- 14/11/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
20/09/2022 | Acknowledgement / Validation Letter | Adobe PDF |
20/09/2022 | Application - Cover Letter | Adobe PDF |
20/09/2022 | Application Form - Part A | Adobe PDF |
20/09/2022 |
Drainage Network Drawings
Proposed Drainage & Watermain Layout |
Adobe PDF |
20/09/2022 |
Drainage Network Drawings
Proposed Fuel Pipework |
Adobe PDF |
20/09/2022 | Drainage Network Drawings | Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Site Services Layout |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Site Levels Layout |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Tank Farm |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Petrol Separators |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Paving Layout |
Adobe PDF |
20/09/2022 |
Drawings-General
Standard Details Sheet 1 |
Adobe PDF |
20/09/2022 |
Drawings-General
Standard Details Sheet 2 |
Adobe PDF |
20/09/2022 |
Drawings-General
Forecourt Details Sheet 1 |
Adobe PDF |
20/09/2022 |
Drawings-General
Forecourt Details Sheet 2 |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Road Markings Layout |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Forecourt Canopy Details |
Adobe PDF |
20/09/2022 |
Drawings-General
Car Wash & Comms Plantroom Sheet 1 |
Adobe PDF |
20/09/2022 |
Drawings-General
Car Wash & Comms Plantroom Sheet 2 |
Adobe PDF |
20/09/2022 |
Drawings-General
Carwash Infrastructure Details |
Adobe PDF |
20/09/2022 |
Drawings-General
Carwash Schematics Drawing |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed EV Charging Services Details |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed EV Charging ESB Substation |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Solar Photovoltaic Panels |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Hazardous Zones |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Sightlines |
Adobe PDF |
20/09/2022 |
Drawings-General
Proposed Autotracks |
Adobe PDF |
20/09/2022 |
Elevations
Carwash Screens Elevations |
Adobe PDF |
20/09/2022 |
Elevations
Existing & Proposed Contiguous A-A & B-B |
Adobe PDF |
20/09/2022 |
Landscape Plans
Proposed |
Adobe PDF |
20/09/2022 | Newspaper Notice | Adobe PDF |
20/09/2022 |
Other Assessments
Fee Calculation |
Adobe PDF |
20/09/2022 |
Other Assessments
Document & Drawing Schedule |
Adobe PDF |
20/09/2022 |
Other Assessments
Issue Record |
Adobe PDF |
20/09/2022 |
Other Assessments
Planning Report |
Adobe PDF |
20/09/2022 |
Site Layout
Existing |
Adobe PDF |
20/09/2022 |
Site Layout
Proposed |
Adobe PDF |
20/09/2022 | Site location map | Adobe PDF |
20/09/2022 | Site Notice | Adobe PDF |
20/09/2022 |
Traffic Impact Reports
Traffic & transport assessment |
Adobe PDF |
20/09/2022 |
Traffic Impact Reports
Traffic & transport assessment |
Adobe PDF |
20/09/2022 |
Traffic Impact Reports
Traffic & transport assessment |
Adobe PDF |
26/09/2022 |
Other Assessments
Engineering Report |
Adobe PDF |
26/09/2022 |
Other Assessments
Flood Risk |
Adobe PDF |
26/09/2022 |
Other Assessments
Flood Risk |
Adobe PDF |
02/11/2022 |
Report Received from External Body
I.A.A. |
Adobe PDF |
03/11/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
10/11/2022 |
Report Received from External Body
E.H.O. |
Adobe PDF |
11/11/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
14/11/2022 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
14/11/2022 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
23/01/2023 |
F.I. Receipt Ack. Letter
S.D.C.C. ack. letter |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Agent's response to A.I. request |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Archt's drawing schedule |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Prosposed Site layout |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Drainage/Watermain layout |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Paving layout |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
SuDS Drainage details |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Arboricultural report |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Landscape Archt's report |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
L'sca[e existing site survey |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Existing green factor analysis |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Proposed Landscape plan |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Landscape Green factor obj. |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Green factor surface type |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Tree & svces plan with sections |
Adobe PDF |
23/01/2023 |
F.I. Received Doc.
Landscape specs. |
Adobe PDF |
09/02/2023 |
Report Received from Internal Staff
Roads AI |
Adobe PDF |
13/02/2023 |
Report Received from Internal Staff
Water Services A.I. |
Adobe PDF |
20/02/2023 |
Chief Executives Order
Grant Permission |
Adobe PDF |
20/02/2023 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
31/03/2023 | Final Grant | Adobe PDF |
21/04/2023 |
Submission
Con. 8 - Public Lighting |
Adobe PDF |
21/04/2023 |
Submission
Complaince Condition 8 and 3 |
Adobe PDF |
15/06/2023 |
Notification of Decision Letters
Condition 8 - Compliant |
Adobe PDF |