Planning Banner Image

View Application SD22A/0093

View Application SD22A/0093

Date Received:
01/04/2022
Last Action:
23/06/2022, Additional Information
Application Type:
Permission
Submission Type:
Additional Information
Closing Date for Submissions:
Closed
Applicant:
Echelon Clondalkin DC Services Limited
Location:
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
Proposed Development:
Amendments to the development permitted under Reg. Ref. SD20A/0309 comprising: alterations to permitted ICT Facility buildings 2 and 3, to include internal reconfiguration of the ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and reconfiguration of screened plant; alterations to the external facades of permitted ICT Facility buildings 2 and 3 to include modification and reconfiguration of fenestration, louvers, loading bays, and access doors, along with an increase in height of 1.2 metres to main parapet level and reduction in the height of rooftop plant to not exceed the parapet height of the buildings, along with the omission of previously permitted flues and exhaust ducts at roof level; omission of emergency generators and associated flues from permitted ICT Facility buildings 2 and 3; The proposed amendments to ICT Facility buildings 2 and 3 result in an increase in their gross floor area (GFA) of 2,511sq.m for each building, resulting in an overall increase in the GFA of the two buildings of 5,022sq.m; Alterations to the water storage tanks serving the permitted ICT Facility buildings, including total increase of 268 sq.m GFA to the permitted pumprooms and a reduction in the scale of the associated water storage tanks. All associated and ancillary works; The application site is subject to an EPA Industrial Emissions Licence relating to the Energy Centre permitted on site (under Reg. Ref.: SD18A/0068 as amended by Reg. Ref.: SD19A/0185).
Decision Due:
20/07/2022

Decision Details

Decision Date:
26/05/2022
Decision:
REQUEST ADDITIONAL INFORMATION
Final Grant Date:
N/A

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
01/04/2022 Acknowledgement / Validation Letter Adobe PDF
01/04/2022 Application - Cover Letter Adobe PDF
01/04/2022 Application - Cover Letter
Planning Report
Adobe PDF
01/04/2022 Application Form - Part A Adobe PDF
01/04/2022 Contiguous Building Elevations
permitted & proposed
Adobe PDF
01/04/2022 Contiguous Building Elevations
Proposed
Adobe PDF
01/04/2022 Drawings-General
1/2 Water storage proposed
Adobe PDF
01/04/2022 Drawings-General
Building 2 roof plan
Adobe PDF
01/04/2022 Drawings-General
Building 3 roof plan permitted
Adobe PDF
01/04/2022 Drawings-General
Roof plan proposed
Adobe PDF
01/04/2022 Drawings-General
proposed sections building 3
Adobe PDF
01/04/2022 Drawings-General
building 4 plant level
Adobe PDF
01/04/2022 Elevations
Building 1 permitted
Adobe PDF
01/04/2022 Elevations
Building 2 elevs permitted
Adobe PDF
01/04/2022 Elevations
Building 2 elevs proposed
Adobe PDF
01/04/2022 Elevations
permitted building 3
Adobe PDF
01/04/2022 Elevations
proposed
Adobe PDF
01/04/2022 Elevations
building 4 permitted
Adobe PDF
01/04/2022 Floor Plans
Ground building 1
Adobe PDF
01/04/2022 Floor Plans
First Building 1
Adobe PDF
01/04/2022 Floor Plans
Plant Level 1
Adobe PDF
01/04/2022 Floor Plans
Roof plan Building 1 permitted
Adobe PDF
01/04/2022 Floor Plans
Building 2 permitted Ground
Adobe PDF
01/04/2022 Floor Plans
Building 2 prop ground
Adobe PDF
01/04/2022 Floor Plans
Building 2 prop first
Adobe PDF
01/04/2022 Floor Plans
Building 2 level 2 proposed
Adobe PDF
01/04/2022 Floor Plans
Building 2 First floor permitted
Adobe PDF
01/04/2022 Floor Plans
Building 2 Mezzanine proposed
Adobe PDF
01/04/2022 Floor Plans
Building 2 Roof permittedf
Adobe PDF
01/04/2022 Floor Plans
Building 2 roof proposed
Adobe PDF
01/04/2022 Floor Plans
Building 3 ground floor permitted
Adobe PDF
01/04/2022 Floor Plans
Ground floor 3 prop
Adobe PDF
01/04/2022 Floor Plans
Building 3 proposed first
Adobe PDF
01/04/2022 Floor Plans
Building 3 level 2 prop
Adobe PDF
01/04/2022 Floor Plans
Building 3 first floor permitted
Adobe PDF
01/04/2022 Floor Plans
level 3 proposed
Adobe PDF
01/04/2022 Floor Plans
building 3 floor plans permitted
Adobe PDF
01/04/2022 Floor Plans
ground GA permitted
Adobe PDF
01/04/2022 Floor Plans
Building 4 roof plan permitted
Adobe PDF
01/04/2022 Newspaper Notice Adobe PDF
01/04/2022 Sections
permitted site sections 1 of 2
Adobe PDF
01/04/2022 Sections
permitted site sections 2/2
Adobe PDF
01/04/2022 Sections
proposed 1/2
Adobe PDF
01/04/2022 Sections
proposed 2/2
Adobe PDF
01/04/2022 Sections
Building 1 permitted
Adobe PDF
01/04/2022 Sections
Building 2 sections -permitted
Adobe PDF
01/04/2022 Sections
Building 2 sections proposed
Adobe PDF
01/04/2022 Sections
Building 3 sections permitted
Adobe PDF
01/04/2022 Sections
permitted building 4
Adobe PDF
01/04/2022 Site Layout
permitted 2
Adobe PDF
01/04/2022 Site Layout
permitted 4
Adobe PDF
01/04/2022 Site Layout
proposed 23
Adobe PDF
01/04/2022 Site Layout
proposed 24 part B
Adobe PDF
01/04/2022 Site Layout
Level 1 permitted
Adobe PDF
01/04/2022 Site layout plan
Permitted 3
Adobe PDF
01/04/2022 Site layout plan
proposed 22
Adobe PDF
01/04/2022 Site location map Adobe PDF
01/04/2022 Site Notice Adobe PDF
01/04/2022 Water Supply Plans
Water storage & pump room
Adobe PDF
01/04/2022 Water Supply Plans
2/2 water storage
Adobe PDF
03/05/2022 Report Received from External Body
I A A
Adobe PDF
04/05/2022 Report Received from External Body
EHO
Adobe PDF
04/05/2022 Report Received from Internal Staff
Water Services
Adobe PDF
08/05/2022 Report Received from External Body
Irish Water
Adobe PDF
12/05/2022 Report Received from Internal Staff
Parks
Adobe PDF
26/05/2022 Chief Executives Order
Request Additional Information
Adobe PDF
26/05/2022 Notification of Decision Letters
Request Additional Information
Adobe PDF
23/06/2022 F.I. Receipt Ack. Letter
SDCC Ack letter
Adobe PDF
23/06/2022 F.I. Received Doc.
Response
Adobe PDF
23/06/2022 F.I. Received Doc.
Response to Item 2
Adobe PDF
23/06/2022 F.I. Received Doc.
Schedule of Documents
Adobe PDF
23/06/2022 F.I. Received Doc.
Response
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Storm Drainage Layout - Sheet 1
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Storm Drainage Layout - Sheet 2
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Foul Drainage Layout - Sheet 1
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Foul Drainage Layout - Sheet 2
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Watermain Layout - Sheet 1
Adobe PDF
23/06/2022 F.I. Received Doc.
Proposed Watermain Layout - Sheet 2
Adobe PDF
14/07/2022 Report Received from Internal Staff
Parks AI
Adobe PDF
18/07/2022 Report Received from Internal Staff
Water Services AI
Adobe PDF
19/07/2022 Report Received from External Body
Irish Water AI
Adobe PDF
20/07/2022 Chief Executives Order
Grant Permission
Adobe PDF
20/07/2022 Notification of Decision Letters
Grant Permission
Adobe PDF
30/08/2022 Final Grant Adobe PDF