- Date Received:
- 14/07/2022
- Last Action:
- 14/07/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Takeda Ireland Limited
- Location:
- Grange Castle Business Park, Grange Castle, Dublin 22
- Proposed Development:
- Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
- Decision Due:
- 07/09/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
14/06/2022 |
Elevations
proposed utilities |
Adobe PDF |
14/07/2022 | Acknowledgement / Validation Letter | Adobe PDF |
14/07/2022 | Application - Cover Letter | Adobe PDF |
14/07/2022 |
Application - Cover Letter
& Document schedule |
Adobe PDF |
14/07/2022 | Application Form - Part A | Adobe PDF |
14/07/2022 |
Contiguous Building Elevations
Existing |
Adobe PDF |
14/07/2022 |
Contiguous Building Elevations
proposed |
Adobe PDF |
14/07/2022 |
Drawings-General
vehicle tracking emergency |
Adobe PDF |
14/07/2022 |
Drawings-General
proposed 3D views |
Adobe PDF |
14/07/2022 |
Drawings-General
Tree survey & constraints |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
EIAR
description of development Photomontage |
Adobe PDF |
14/07/2022 |
Elevations
cont. |
Adobe PDF |
14/07/2022 | Landscape Plans | Adobe PDF |
14/07/2022 |
Landscape Plans
& details |
Adobe PDF |
14/07/2022 | Newspaper Notice | Adobe PDF |
14/07/2022 |
Other Assessments
Abatement Project Planning Report |
Adobe PDF |
14/07/2022 |
Other Assessments
Tree removal & protection |
Adobe PDF |
14/07/2022 |
Other Assessments
EIS Report |
Adobe PDF |
14/07/2022 |
Site Layout
Existing |
Adobe PDF |
14/07/2022 |
Site Layout
proposed |
Adobe PDF |
14/07/2022 |
Site Layout
proposed detail site plan |
Adobe PDF |
14/07/2022 |
Site Layout
Utilities workshop plan & sections |
Adobe PDF |
14/07/2022 |
Site Layout
external lighting |
Adobe PDF |
14/07/2022 |
Site Layout
foul & surface water layout |
Adobe PDF |
14/07/2022 |
Site Layout
typical drainage details |
Adobe PDF |
14/07/2022 | Site location map | Adobe PDF |
14/07/2022 | Site Notice | Adobe PDF |
16/08/2022 |
Report Received from External Body
Inland Fisheries Ireland |
Adobe PDF |
22/08/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
23/08/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
23/08/2022 |
Report Received from External Body
I.A.A. |
Adobe PDF |
24/08/2022 |
Report Received from External Body
Environmental Protection Agency |
Adobe PDF |
31/08/2022 |
Report Received from Internal Staff
Roads |
Adobe PDF |
01/09/2022 |
Report Received from External Body
Health & Safety Authority |
Adobe PDF |
02/09/2022 |
Report Received from External Body
T.I.I. |
Adobe PDF |
05/09/2022 |
Report Received from External Body
E.H.O. |
Adobe PDF |
06/09/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
07/09/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
07/09/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
07/09/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
17/10/2022 | Final Grant | Adobe PDF |
20/12/2022 |
Submission
Condition 6 |
Adobe PDF |
20/12/2022 |
Submission
Condition 6 |
Adobe PDF |
20/12/2022 |
Submission
Condition 6 |
Adobe PDF |
20/12/2022 |
Submission
Condition 3 |
Adobe PDF |
20/12/2022 |
Submission
Condition 8; Not for agree |
Adobe PDF |
20/12/2022 |
Submission
Condition 3, 6 and 8 Cover Letter |
Adobe PDF |
09/01/2023 |
Submission Acknowledgment
Condition 3 and 6 |
Adobe PDF |
10/01/2023 |
Submission
Condition 10 |
Adobe PDF |
10/01/2023 |
Submission
Condition 10 |
Adobe PDF |
11/01/2023 |
Submission
Condition 4 and 9 |
Adobe PDF |
11/01/2023 |
Submission
Condition 4 and 9 |
Adobe PDF |
11/01/2023 |
Submission
Condition 4 and 9 |
Adobe PDF |
11/01/2023 |
Submission Acknowledgment
Condition 10 |
Adobe PDF |
16/01/2023 |
Submission Acknowledgment
Condition 4 and 9 |
Adobe PDF |
20/02/2023 |
Notification of Decision Letters
Condition 6 - compliant |
Adobe PDF |
20/02/2023 |
Notification of Decision Letters
Condition 3 - compliant |
Adobe PDF |
22/02/2023 |
Notification of Decision Letters
Condition 10 - not compliant |
Adobe PDF |
01/03/2023 |
Notification of Decision Letters
Condition 4 - compliant |
Adobe PDF |
06/03/2023 |
Notification of Decision Letters
Condition 9 - compliant |
Adobe PDF |