- Date Received:
- 29/07/2022
- Last Action:
- 29/07/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Mary Dalton
- Location:
- 146 St. Maelruans Park, Tallaght, Dublin 24.
- Proposed Development:
- Remove existing tiled roof to side extension and form new first floor extension over with tiled roof ridge tiles to match existing at same level with external finishes to match existing; proposed new two storey end of terraced dwelling with tiled roof and external finishes to match existing; new front porch; new front driveway; new vehicular access with new dished footpath and associated site works.
- Decision Due:
- 22/09/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
29/07/2022 | Acknowledgement / Validation Letter | Adobe PDF |
29/07/2022 |
Application - Cover Letter
Doc schedule |
Adobe PDF |
29/07/2022 | Application Form - Part A | Adobe PDF |
29/07/2022 |
Elevations
front & rear |
Adobe PDF |
29/07/2022 |
Elevations
contig & gable |
Adobe PDF |
29/07/2022 |
Floor Plans
Ex ground & first |
Adobe PDF |
29/07/2022 |
Floor Plans
proposed first |
Adobe PDF |
29/07/2022 |
Floor Plans
proposed ground floor & drainage |
Adobe PDF |
29/07/2022 | Newspaper Notice | Adobe PDF |
29/07/2022 |
Plans, Sections, Elevations
ex roof & gable |
Adobe PDF |
29/07/2022 |
Sections
AA |
Adobe PDF |
29/07/2022 |
Site Layout
proposed |
Adobe PDF |
29/07/2022 |
Site Layout
proposed |
Adobe PDF |
29/07/2022 |
Site Layout
specifications |
Adobe PDF |
29/07/2022 | Site location map | Adobe PDF |
29/07/2022 | Site Notice | Adobe PDF |
30/08/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
08/09/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
12/09/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
22/09/2022 |
Chief Executives Order
Request Additional Information |
Adobe PDF |
22/09/2022 |
Notification of Decision Letters
Request Additional Information |
Adobe PDF |
30/01/2023 |
F.I. Receipt Ack. Letter
S.D.C.C. ack. letter |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Agent's cover letter |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Site location |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Site layout |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Floor plans |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Read garden open space |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Elevations |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Drainage layout |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Soakaway Design rpt. |
Adobe PDF |
30/01/2023 |
F.I. Received Doc.
Water/wastewater rpt. |
Adobe PDF |
20/02/2023 |
Report Received from Internal Staff
Water Services AI |
Adobe PDF |
21/02/2023 |
Chief Executives Order
Grant Permission |
Adobe PDF |
21/02/2023 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
21/02/2023 |
Report Received from External Body
Irish Water AI |
Adobe PDF |
31/03/2023 | Final Grant | Adobe PDF |