Planning Banner Image

View Application SD22A/0372

View Application SD22A/0372

Date Received:
28/09/2022
Last Action:
28/09/2022
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
John Shenton & Margaret Hanlon
Location:
Saint Claires Villa, Lucan Road, Lucan, Co. Dublin, K78 X0N1
Proposed Development:
Demolition of existing two storey detached dwelling house and outbuildings; Construct new purpose built three storey mixed used building with, a new physiotherapy practice, consisting of 5 consultation rooms, office space, staff areas as well as a rehab gym and studio area, all over two floors at ground and first floor levels; One bedroom apartment with own door access and dedicated private balcony area at the second floor level; 5 car parking spaces and secure bicycle parking parking for 6 bicycles all on site; Back lit signage to the front facade of the building; All associated site development works.
Decision Due:
22/11/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
28/09/2022 Acknowledgement / Validation Letter Adobe PDF
28/09/2022 Application - Cover Letter
Documents & apartment sizes
Adobe PDF
28/09/2022 Application - Cover Letter
& information
Adobe PDF
28/09/2022 Application Form - Part A Adobe PDF
28/09/2022 Drainage Network Drawings
proposed
Adobe PDF
28/09/2022 Drawings-General
Typical drainage & Details
Adobe PDF
28/09/2022 Drawings-General
Tree Survey
Adobe PDF
28/09/2022 Elevations
& sections proposed
Adobe PDF
28/09/2022 Floor Plans
Practice & Apartment
Adobe PDF
28/09/2022 Newspaper Notice Adobe PDF
28/09/2022 Other Assessments
Shadow Assessment
Adobe PDF
28/09/2022 Other Assessments
Photomontage
Adobe PDF
28/09/2022 Other Assessments
Bat survey
Adobe PDF
28/09/2022 Other Assessments
drainage report
Adobe PDF
28/09/2022 Other Assessments
Arboricultural Statement
Adobe PDF
28/09/2022 Sections
ex & prop cross sections
Adobe PDF
28/09/2022 Site Layout
proposed signage & bicycle shelter
Adobe PDF
28/09/2022 Site location map Adobe PDF
28/09/2022 Site Notice Adobe PDF
28/09/2022 Topographical Survey Adobe PDF
11/11/2022 Report Received from Internal Staff
Roads
Adobe PDF
14/11/2022 Report Received from Internal Staff
Water Services
Adobe PDF
18/11/2022 Report Received from External Body
E.H.O.
Adobe PDF
21/11/2022 Report Received from Internal Staff
Parks
Adobe PDF
22/11/2022 Chief Executives Order
Request Additional Information
Adobe PDF
22/11/2022 Notification of Decision Letters
Request Additional Information
Adobe PDF
17/02/2023 F.I. Receipt Ack. Letter
S.D.C.C. ack. letter
Adobe PDF
17/02/2023 F.I. Received Doc.
Agent's response to A.I. request
Adobe PDF
17/02/2023 F.I. Received Doc.
Drawings schedule
Adobe PDF
17/02/2023 F.I. Received Doc.
Site plan
Adobe PDF
17/02/2023 F.I. Received Doc.
Vertical Sky Component Assesmt.
Adobe PDF
17/02/2023 F.I. Received Doc.
Roof/Drainage/Rear Elev. plans
Adobe PDF
17/02/2023 F.I. Received Doc.
Urban Design Analysis report
Adobe PDF
17/02/2023 F.I. Received Doc.
Civil Engr's response rpt.
Adobe PDF
17/02/2023 F.I. Received Doc.
Typ. Drainage details/Auto Track
Adobe PDF
17/02/2023 F.I. Received Doc.
Drainage Layout
Adobe PDF
17/02/2023 F.I. Received Doc.
Irish Water A.I. report
Adobe PDF
17/02/2023 F.I. Received Doc.
Landscape Design report
Adobe PDF
17/02/2023 F.I. Received Doc.
L'scape Plan - Ground levels
Adobe PDF
17/02/2023 F.I. Received Doc.
L'scape plan - Roof levels
Adobe PDF
17/02/2023 F.I. Received Doc.
L'scape Green Infrastructure plan-
Adobe PDF
17/02/2023 F.I. Received Doc.
Green Infrastructure plan
Adobe PDF
17/02/2023 F.I. Received Doc.
Green-Roofed cycle shelter/Bin Store
Adobe PDF
17/02/2023 F.I. Received Doc.
Construction/Demolition Waste Mgmt rpt.
Adobe PDF
27/02/2023 Report Received from Internal Staff
Roads AI
Adobe PDF
28/02/2023 Report Received from Internal Staff
Parks AI
Adobe PDF
03/03/2023 Report Received from Internal Staff
Water Services AI
Adobe PDF
06/03/2023 Report Received from Internal Staff
A I Architectural Conservation Officer
Adobe PDF
07/03/2023 Report Received from External Body
Irish Water AI
Adobe PDF
16/03/2023 Chief Executives Order
Grant Permission
Adobe PDF
16/03/2023 Notification of Decision Letters
Grant Permission
Adobe PDF
30/03/2023 Report Received from External Body
EHO AI
Adobe PDF
21/04/2023 Final Grant Adobe PDF