Planning Banner Image

View Application SD21A/0331

View Application SD21A/0331

Date Received:
08/12/2021
Last Action:
08/12/2021
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
OnTower Ireland Limited
Location:
Sureweld International Ltd, Fonthill, Lucan, Co. Dublin
Proposed Development:
Replace an existing 15m telecommunications structure with a new 21m monopole structure carrying antenna and dishes enclosed within an extended 2.4 metre high palisade fence compound; associated ground equipment cabinets; associated site works; the proposed development is within the curtilage of a protected structure, no works proposed will directly affect this structure.
Decision Due:
10/02/2022

Decision Details

Decision Date:
10/02/2022
Decision:
REFUSE PERMISSION
Final Grant Date:
N/A

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
08/12/2021 Acknowledgement / Validation Letter Adobe PDF
08/12/2021 Application - Cover Letter
& application details
Adobe PDF
08/12/2021 Application - Cover Letter
& others
Adobe PDF
08/12/2021 Application Form - Part A Adobe PDF
08/12/2021 Drawings-General
cabinet details x 3
Adobe PDF
08/12/2021 Drawings-General
Air Technical Justification
Adobe PDF
08/12/2021 Elevations
ex & prop
Adobe PDF
08/12/2021 Elevations
structure
Adobe PDF
08/12/2021 Newspaper Notice Adobe PDF
08/12/2021 Photo Montage
& details
Adobe PDF
08/12/2021 Site Layout
ex
Adobe PDF
08/12/2021 Site layout plan
proposed
Adobe PDF
08/12/2021 Site location map
& photos
Adobe PDF
08/12/2021 Site location map
x 2
Adobe PDF
08/12/2021 Site location map Adobe PDF
08/12/2021 Site location map
OS location map
Adobe PDF
08/12/2021 Site Notice Adobe PDF
18/01/2022 Report Received from External Body
Irish Water
Adobe PDF
25/01/2022 Report Received from External Body
An Taisce
Adobe PDF
28/01/2022 Report Received from External Body
EHO
Adobe PDF
31/01/2022 Report Received from Internal Staff
Broadband Officer
Adobe PDF
04/02/2022 Report Received from Internal Staff
Architectural Conservation Officer
Adobe PDF
10/02/2022 Chief Executives Order
Refuse Permission
Adobe PDF
10/02/2022 Notification of Decision Letters
Refuse Permission
Adobe PDF
10/02/2022 Report Received from External Body
Irish Aviation Authority
Adobe PDF