- Date Received:
- 14/01/2022
- Last Action:
- 14/01/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Declan Heery & Liz McGrath
- Location:
- 432A, Orwell Park Green, Dublin 6W
- Proposed Development:
- (1) a new first floor rear extension; (2) a single storey side extension; (3) removal of main existing pitched roof on dwelling and replacement of same with a mixture pitch and flat roof, placing a 'Velux' window in front, 2 'Velux' window in rear, 5 'Velux' windows in north side of new roof, placing 2 'Velux' windows and 1 dormer structure with obscure window on side south face of new roof; (4) All associated site works.
- Decision Due:
- 10/03/2022
Decision Details
- Decision Date:
- 10/03/2022
- Decision:
- GRANT PERMISSION & REFUSE PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
14/01/2022 |
Acknowledgement / Validation Letter
SDCC Ack letter |
Adobe PDF |
14/01/2022 | Application - Cover Letter | Adobe PDF |
14/01/2022 |
Application - Cover Letter
from Irish Water |
Adobe PDF |
14/01/2022 | Application Form - Part A | Adobe PDF |
14/01/2022 | Document Schedule | Adobe PDF |
14/01/2022 |
Elevations
Proposed Rear & Side North & South |
Adobe PDF |
14/01/2022 |
Floor Plans
Existing Ground & First Floor & Roof Plan |
Adobe PDF |
14/01/2022 |
Floor Plans
Proposed Ground & Drainage Layout |
Adobe PDF |
14/01/2022 |
Floor Plans
Proposed Attic Floor |
Adobe PDF |
14/01/2022 | Newspaper Notice | Adobe PDF |
14/01/2022 |
Plans, Sections, Elevations
Existing dwelling elevation & section AA |
Adobe PDF |
14/01/2022 | Report on Existing Water Main & Foul Sewer | Adobe PDF |
14/01/2022 | Site layout plan | Adobe PDF |
14/01/2022 | Site Notice | Adobe PDF |
11/02/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
12/02/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
10/03/2022 |
Chief Executives Order
Grant Permission & Refuse Permission |
Adobe PDF |
10/03/2022 |
Notification of Decision Letters
Grant Permission & Refuse Permission |
Adobe PDF |
25/04/2022 | Final Grant | Adobe PDF |