- Date Received:
- 12/01/2022
- Last Action:
- 12/01/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Kilsaran Concrete Unlimited Company
- Location:
- Kilsaran Concrete, Adamstown, Lucan, Co. Dublin
- Proposed Development:
- The permanent continuation of use of the following existing buildings and structures: a prefabricated office (16.0m x 3.8m x 3.0m high); prefabricated canteen facilities (14.0m x 3.8m x 3.0m high); water holding tank (29.7m x 6.3m); 4 aggregate ground storage bays; power house (15.9m x 4.0m x 3.6m high); and weighbridge, all previously permitted for a five year period under Pl. Ref. SD17A/0218.
- Decision Due:
- 08/03/2022
Decision Details
- Decision Date:
- 08/03/2022
- Decision:
- GRANT PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
12/01/2022 | Acknowledgement / Validation Letter | Adobe PDF |
12/01/2022 | Application - Cover Letter | Adobe PDF |
12/01/2022 | Application Form - Part A | Adobe PDF |
12/01/2022 | Appropriate Assessment Screening Report | Adobe PDF |
12/01/2022 |
Drawings-General
Water Holding Tank |
Adobe PDF |
12/01/2022 |
Elevations
Power House plans & elevs |
Adobe PDF |
12/01/2022 |
Elevations
Weighbridge |
Adobe PDF |
12/01/2022 | Newspaper Notice | Adobe PDF |
12/01/2022 |
Plans, Sections, Elevations
ground storage bays |
Adobe PDF |
12/01/2022 |
Plans, Sections, Elevations
Storage bays 3 & 4 |
Adobe PDF |
12/01/2022 |
Plans, Sections, Elevations
Prefab Canteen |
Adobe PDF |
12/01/2022 |
Plans, Sections, Elevations
prefab offices |
Adobe PDF |
12/01/2022 | Sections | Adobe PDF |
12/01/2022 | Site Layout | Adobe PDF |
12/01/2022 | Site location map | Adobe PDF |
12/01/2022 | Site Notice | Adobe PDF |
10/02/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
15/02/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
18/02/2022 |
Report Received from External Body
An Taisce |
Adobe PDF |
03/03/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
08/03/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
08/03/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
25/04/2022 | Final Grant | Adobe PDF |
13/03/2023 |
Notification of Decision Letters
Condition 31 - compliant ERROR |
Adobe PDF |