- Date Received:
- 14/11/2022
- Last Action:
- 14/11/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Cedarglade Limited
- Location:
- Supervalu, Main Street, Newcastle, Co. Dublin
- Proposed Development:
- Modifications to the parent permitted application Reg. SD20A/0037 and subsequent amendments application Reg. Ref. SD20A/0343; Modifications will consist of the provision of 10 Electric Vehicle car parking spaces to include 3 disabled EV spaces, 5 additional designated parent and child spaces, 2 covered click and collect parking spaces with a canopy (approx. 33sq.m); A total of 92 car parking spaces will be provided overall, together with ancillary generator (approx. 7sqm) within the surrounding compound (approx. 23sq.m) along with all site development works.
- Decision Due:
- 18/01/2023
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
14/11/2022 | Acknowledgement / Validation Letter | Adobe PDF |
14/11/2022 | Application - Cover Letter | Adobe PDF |
14/11/2022 | Application Form - Part A | Adobe PDF |
14/11/2022 |
Floor Plans
Click & Collect Canopy Detail Sheet |
Adobe PDF |
14/11/2022 | Land owner consent | Adobe PDF |
14/11/2022 | Newspaper Notice | Adobe PDF |
14/11/2022 |
Other Assessments
Document Register |
Adobe PDF |
14/11/2022 |
Site layout plan
& Floor Plans- Current Granted |
Adobe PDF |
14/11/2022 |
Site layout plan
& Ground Floor Plan - Proposed |
Adobe PDF |
14/11/2022 |
Site location map
& Proposed Site Layout Plan |
Adobe PDF |
14/11/2022 | Site Notice | Adobe PDF |
21/12/2022 |
Report Request Letter to Internal Staff
Parks |
Adobe PDF |
04/01/2023 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
07/01/2023 |
Report Received from External Body
Irish Water |
Adobe PDF |
16/01/2023 |
Chief Executives Order
Grant Permission |
Adobe PDF |
16/01/2023 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
27/02/2023 | Final Grant | Adobe PDF |
03/04/2023 |
Submission
Condition 6 - Cover letter |
Adobe PDF |
03/04/2023 |
Submission
Condition 6 - Letter from ESB |
Adobe PDF |
26/05/2023 |
Notification of Decision Letters
Condition 6 - Compliant |
Adobe PDF |