- Date Received:
- 21/02/2022
- Last Action:
- 21/02/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- John Dunne
- Location:
- 97 Boot Road, Clondalkin, Dublin 22.
- Proposed Development:
- (1) The demolition of the existing shed/garage building to the rear of the existing dwelling; (2) the construction of 1 2-bedroom, 3 person detached single storey pitched roof mews dwelling with attic conversion, and a single storey flat roof rear projection located to the rear of the existing dwelling and fronting Brideswell Lane; (3) the vehicular entrance is off Brideswell Lane; (4) connection to all public services; (5) all necessary ancillary site development works to facilitate this development.
- Decision Due:
- 19/04/2022
Decision Details
- Decision Date:
- 19/04/2022
- Decision:
- REFUSE PERMISSION
- Final Grant Date:
- N/A
Appeal to An Bord Pleanala
- Notified:
- 13/05/2022
- Lodged:
- 11/05/2022
- Appellant Type:
- 1 st Party
- Nature of Appeal:
- AGAINST DECISION
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
21/02/2022 | Acknowledgement / Validation Letter | Adobe PDF |
21/02/2022 |
Application - Cover Letter
& Document schedule |
Adobe PDF |
21/02/2022 | Application Form - Part A | Adobe PDF |
21/02/2022 | Newspaper Notice | Adobe PDF |
21/02/2022 | Plans, Sections, Elevations | Adobe PDF |
21/02/2022 |
Site Layout
existing |
Adobe PDF |
21/02/2022 |
Site layout plan
proposed |
Adobe PDF |
21/02/2022 | Site location map | Adobe PDF |
21/02/2022 | Site location map | Adobe PDF |
21/02/2022 | Site Notice | Adobe PDF |
25/03/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
29/03/2022 |
Report Received from External Body
Transport Infrastructure Ireland |
Adobe PDF |
01/04/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
11/04/2022 |
Report Received from External Body
EHO |
Adobe PDF |
12/04/2022 |
Report Received from Internal Staff
Parks |
Adobe PDF |
19/04/2022 |
Chief Executives Order
Refuse Permission |
Adobe PDF |
19/04/2022 |
Notification of Decision Letters
Refuse Permission |
Adobe PDF |
13/05/2022 |
Appeal Notification
1st Party |
Adobe PDF |
24/05/2022 |
Appeal Correspondence
Cover letter to ABP |
Adobe PDF |
08/06/2022 | Appeal Submission | Adobe PDF |
14/09/2022 |
Appeal Correspondence
A.B.P.'s decision date extn. |
Adobe PDF |
05/12/2022 |
Appeal Correspondence
A.B.P.'s decision date extn. |
Adobe PDF |
14/08/2023 |
Appeal Decision
GRANT PERMISSION |
Adobe PDF |