- Date Received:
- 23/05/2022
- Last Action:
- 23/05/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Interxion Ireland DAC
- Location:
- Grange Castle Business Park, Clondalkin, Dublin 22
- Proposed Development:
- 1 screened bin compound to be relocated to the south-east corner of the site; 2 transformers within individual compounds and adjoining switch room (35.2sq.m) to be located to the east of the permitted data centre to replace screened transformer compound permitted to the south-east of the site; 1 new plantroom (19.8sq.m) and 1 water storage tank to be located to the west of the permitted data centre to replace previously approved fire suppression enclosure and new double gates to replace sliding gates at entrance into the permitted data centre site.
- Decision Due:
- 17/07/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
23/05/2022 | Acknowledgement / Validation Letter | Adobe PDF |
23/05/2022 |
Application - Cover Letter
Document schedule |
Adobe PDF |
23/05/2022 | Application - Cover Letter | Adobe PDF |
23/05/2022 | Application Form - Part A | Adobe PDF |
23/05/2022 |
Contiguous Building Elevations
D & C |
Adobe PDF |
23/05/2022 |
Contiguous Building Elevations
A & B |
Adobe PDF |
23/05/2022 |
Drawings-General
Site Entrance permitted & proposed |
Adobe PDF |
23/05/2022 |
Drawings-General
prop Bin Compound |
Adobe PDF |
23/05/2022 |
Drawings-General
Switch room & Transformer 01 & 02 |
Adobe PDF |
23/05/2022 |
Drawings-General
plant room & external storage tank |
Adobe PDF |
23/05/2022 |
Elevations
Permitted SD18A/0323 |
Adobe PDF |
23/05/2022 |
Floor Plans
1st & 2nd SD18A/0323 |
Adobe PDF |
23/05/2022 | Newspaper Notice | Adobe PDF |
23/05/2022 |
Plans, Sections, Elevations
Ground Perm. SD18A/0323 |
Adobe PDF |
23/05/2022 |
Site Layout
existing |
Adobe PDF |
23/05/2022 |
Site Layout
Site plan permitted & proposed |
Adobe PDF |
23/05/2022 | Site location map | Adobe PDF |
23/05/2022 | Site Notice | Adobe PDF |
22/06/2022 |
Report Received from External Body
T.I.I. |
Adobe PDF |
28/06/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
29/06/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
18/07/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
18/07/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
30/08/2022 | Final Grant | Adobe PDF |