- Date Received:
- 21/12/2021
- Last Action:
- 21/12/2021
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- Edward Collins
- Location:
- Glassamucky, Glenasmole, Tallaght, Dublin 24
- Proposed Development:
- Construct a single storey dwelling; a secondary waste water treatment system with a pressurised infiltration bed for percolation area; upgrade existing farm entrance to use as a shared agricultural and domestic use; all ancillary site works.
- Decision Due:
- 23/02/2022
Decision Details
- Decision Date:
- 23/02/2022
- Decision:
- REFUSE PERMISSION
- Final Grant Date:
- N/A
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
21/12/2021 | 3D Rendered Images (Phase 1) | Adobe PDF |
21/12/2021 | 3D Rendered Images (Phase 2) | Adobe PDF |
21/12/2021 |
Acknowledgement / Validation Letter
SDCC Ack letter |
Adobe PDF |
21/12/2021 | Application Form - Part A | Adobe PDF |
21/12/2021 |
Elevations
Proposed (Phase 1) |
Adobe PDF |
21/12/2021 |
Elevations
Proposed (Phase 2) |
Adobe PDF |
21/12/2021 | Existing Site Survey | Adobe PDF |
21/12/2021 |
Floor Plans
Proposed Floor Layouts & Sectional Detail |
Adobe PDF |
21/12/2021 |
Floor Plans
Proposed Floor Plans & Sectional Detail Phase 2) |
Adobe PDF |
21/12/2021 | Landscape Master Plan | Adobe PDF |
21/12/2021 | Landscape Master Plan - Section A | Adobe PDF |
21/12/2021 | Landscape Master Plan - Section B | Adobe PDF |
21/12/2021 | Newspaper Notice | Adobe PDF |
21/12/2021 |
Other Assessments
Siteb Suitability Assessment |
Adobe PDF |
21/12/2021 | Schedule of Documents | Adobe PDF |
21/12/2021 |
Sections
Proposed (Through Site) |
Adobe PDF |
21/12/2021 |
Site layout plan
Proposed |
Adobe PDF |
21/12/2021 |
Site location map
Map No 1 |
Adobe PDF |
21/12/2021 |
Site location map
Mao No. 2 |
Adobe PDF |
21/12/2021 | Site Notice | Adobe PDF |
01/02/2022 |
Report Received from External Body
An Taisce |
Adobe PDF |
02/02/2022 |
Report Received from Internal Staff
Water Services |
Adobe PDF |
04/02/2022 |
Report Received from External Body
Irish Water |
Adobe PDF |
23/02/2022 |
Chief Executives Order
Refuse Permission |
Adobe PDF |
23/02/2022 |
Notification of Decision Letters
Refuse Permission |
Adobe PDF |