View Application SD22A/0289

View Application SD22A/0289

Date Received:
27/06/2022
Last Action:
27/06/2022
Application Type:
Permission
Submission Type:
New Application
Closing Date for Submissions:
Closed
Applicant:
EdgeConneX Ireland Limited
Location:
Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
Proposed Development:
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPA­Industrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Decision Due:
22/08/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type
27/06/2022 Acknowledgement / Validation Letter Adobe PDF
27/06/2022 Application - Cover Letter Adobe PDF
27/06/2022 Application Form - Part A Adobe PDF
27/06/2022 Contiguous Building Elevations
Proposed Contextual Elevations
Adobe PDF
27/06/2022 Elevations
Proposed Power Generation Plant 01-Elevations
Adobe PDF
27/06/2022 Elevations
Proposed Power Generation Plant 02 - Elevations
Adobe PDF
27/06/2022 Elevations
Proposed Power Generation Plant 03 - Elevations
Adobe PDF
27/06/2022 Newspaper Notice Adobe PDF
27/06/2022 Plans, Sections, Elevations
Proposed Power Generation Plant 03 - Plans & Secti
Adobe PDF
27/06/2022 Sections
Proposed Power Generation Plant 01 - Plans & Eleva
Adobe PDF
27/06/2022 Sections
Proposed Power Generation Plant 02 - Plans & Secti
Adobe PDF
27/06/2022 Site layout plan Adobe PDF
27/06/2022 Site location map Adobe PDF
27/06/2022 Site Notice Adobe PDF
26/07/2022 Report Received from External Body
T.I.I.
Adobe PDF
22/08/2022 Chief Executives Order
Grant Permission
Adobe PDF
22/08/2022 Notification of Decision Letters
Grant Permission
Adobe PDF
22/09/2022 Appeal Notification
3rd Party Appeal to A.B.P.
Adobe PDF
07/10/2022 Appeal Submission
S.D.C.C. response to A.B.P.
Adobe PDF
05/12/2022 Appeal Decision
Appeal deemed 'Invalid'
Adobe PDF
10/02/2023 Final Grant Adobe PDF