- Date Received:
- 27/06/2022
- Last Action:
- 27/06/2022
- Application Type:
- Permission
- Submission Type:
- New Application
- Closing Date for Submissions:
- Closed
- Applicant:
- EdgeConneX Ireland Limited
- Location:
- Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
- Proposed Development:
- The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
- Decision Due:
- 22/08/2022
Documents
Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.
Received | File | Type |
---|---|---|
27/06/2022 | Acknowledgement / Validation Letter | Adobe PDF |
27/06/2022 | Application - Cover Letter | Adobe PDF |
27/06/2022 | Application Form - Part A | Adobe PDF |
27/06/2022 |
Contiguous Building Elevations
Proposed Contextual Elevations |
Adobe PDF |
27/06/2022 |
Elevations
Proposed Power Generation Plant 01-Elevations |
Adobe PDF |
27/06/2022 |
Elevations
Proposed Power Generation Plant 02 - Elevations |
Adobe PDF |
27/06/2022 |
Elevations
Proposed Power Generation Plant 03 - Elevations |
Adobe PDF |
27/06/2022 | Newspaper Notice | Adobe PDF |
27/06/2022 |
Plans, Sections, Elevations
Proposed Power Generation Plant 03 - Plans & Secti |
Adobe PDF |
27/06/2022 |
Sections
Proposed Power Generation Plant 01 - Plans & Eleva |
Adobe PDF |
27/06/2022 |
Sections
Proposed Power Generation Plant 02 - Plans & Secti |
Adobe PDF |
27/06/2022 | Site layout plan | Adobe PDF |
27/06/2022 | Site location map | Adobe PDF |
27/06/2022 | Site Notice | Adobe PDF |
26/07/2022 |
Report Received from External Body
T.I.I. |
Adobe PDF |
22/08/2022 |
Chief Executives Order
Grant Permission |
Adobe PDF |
22/08/2022 |
Notification of Decision Letters
Grant Permission |
Adobe PDF |
22/09/2022 |
Appeal Notification
3rd Party Appeal to A.B.P. |
Adobe PDF |
07/10/2022 |
Appeal Submission
S.D.C.C. response to A.B.P. |
Adobe PDF |
05/12/2022 |
Appeal Decision
Appeal deemed 'Invalid' |
Adobe PDF |
10/02/2023 | Final Grant | Adobe PDF |