View Application C6/SD18A/0323

View Application C6/SD18A/0323

Date Received:
01/02/2022
Last Action:
01/02/2022
Application Type:
Compliance with Conditions
Submission Type:
Compliance - Water & Drainage
Closing Date for Submissions:
Closed
Applicant:
Interxion Ireland DAC
Location:
Grange Castle Business Park, Clondalkin, Dublin 22
Proposed Development:
Construction of a two storey data centre with three storey central service spine (7,246sq.m) with plant at roof level, that includes a reception area (274.4sq.m), shipping area (264.3sq.m) and three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at ground floor; storage (476sq.m) at mezzanine level above the shipping area; and office (560sq.m), three data halls (each 582.5sq.m - total 1,747.5sq.m) plus service spine and ancillary space at first floor level; and service spine at second floor level only. The new data centre will include plant at roof level; associated support services, 7 standby generators with associated flues (each 17.29m high). The development with include a single storey sub-station (74.5sq.m), transformer 26.8sq.m and bin compound (33sq.m) and will connect to existing Grange Castle infrastructural services the will include a new access road that will provide independent vehicular access to the site off the northern spine road that provides access to the existing data centre granted under SD15A/0034. The development will include ancillary site works as well as fencing, signage, entrance gate, 22 car parking spaces that include 2 disabled car parking spaces, as well as sheltered bicycle parking. The development will also include modifications to the attenuation pond, and to the landscaping previously permitted under SD15A/0034. Temporary permission is also sought for 72 temporary construction worker parking spaces, temporary construction compound and temporary construction access from Grange Castle Business Park lands to the west. An Environmental Impact Assessment Report (EIAR) has been submitted with this application. CONDITION 6. Pollution Pollution and the release of silt shall be prevented into the Griffeen River. In this regard, no development shall take place under this permission until the applicant, owner or developer has lodged with the Planning Authority: (1) Fully detailed revised plans detailing and providing for all the requirements set out below, along with; (2) The written confirmation of the Council’s Environmental Services - Water Pollution Section of their agreement to these revised plans, and; (3) A written commitment to carry out the development in accordance with the required revised plans and; (4) The receipt for all these requirements has been acknowledged in writing by Planning Authority. The revised detailed plans required to be lodged with the Planning Authority shall provide for all of the following; (a) A method statement detailing the measures which will be taken to prevent pollution and the release of silt into the public surface water drainage system and the adjacent Griffeen River system during the construction phase of this development. (b) Petrol/oil interception (including hydrobrake controls) are essential on primary surface water discharges to protect receiving freshwaters in terms of water quality and quantity. (c) Maintenance records shall be maintained and shall be made available for inspection should such records be required by the Planning Authority. REASON: To prevent pollution and to protect the riparian and riverine habitats of the Griffeen River system
Decision Due: