Planning Banner Image

View Application SHD3ABP-312275-21C21

View Application SHD3ABP-312275-21C21

Date Received:
23/05/2022
Last Action:
23/05/2022
Application Type:
Compliance with Conditions
Submission Type:
Compliance - Roads
Closing Date for Submissions:
Closed
Applicant:
Moykerr Limited
Location:
St. Edmunds, St. Lomans Road, Palmerstown, Dublin 20
Proposed Development:
Modifications to the previously permitted Strategic Housing Development granted on the subject site (Reg. Ref. ABP-305857-19), which is currently under construction. The proposed development will provide for amendments to the permitted development as follows: • Permitted Block 1 increased in height by 1 storey and will now comprise 235 apartments in total (an increase of 21 from the permitted 214) • Permitted Block 2 layout will be reconfigured, and increased in height by 1 storey, and will now comprise 34 apartments (an increase of 1 from the permitted 33) • Replacement of permitted Block 3 (a terrace of 5 2 storey, 3-bed houses) with a new 4-5 storey apartment block comprising 28 apartments (an increase of 23 from the permitted 5) • Replacement of permitted Block 4 (a 3 storey commercial block comprising creche, gym, retail unit, community room and concierge) with a 2-5 storey block comprising 16 apartments, creche and residential amenity space (providing a gym, co-working space, a multi-use room, kitchenette and reception). The overall development, as modified, will increase from 252 permitted residential units (comprising 247 apartments/duplexes and 5 houses) to 313 apartments in four blocks (an increase of 61 units) and including 137 1-beds, 171 2-beds and 5 3-beds. The building height will now range up to 9 storeys (previously up to 8 storeys). All apartments will have associated private balconies/terraces to the north/south/east/west elevations. Permitted parking will be revised to now provide 214 car parking spaces (a decrease of 11 spaces) and 378 bicycle parking spaces (an increase of 70 spaces). All associated site services and works to enable the development including bin stores, ESB substations, associated roadworks and services connections, public and communal open spaces, vehicular access, pedestrian/cyclist connections, boundary treatment works and landscaping. Condition 21 CMP
Decision Due:
17/07/2022

Documents

Please note: Most documents are in Adobe Acrobat pdf format which is free to download and install. If you have any problems displaying the document in your browser then right-click the link below and save the file to your computer.

Received File Type