View Application SHD3ABP-306705-20C18

View Application SHD3ABP-306705-20C18

Date Received:
14/06/2022
Last Action:
14/06/2022
Application Type:
Compliance with Conditions
Submission Type:
Compliance - Water & Drainage
Closing Date for Submissions:
Closed
Applicant:
Greenleaf Homes Ltd.
Location:
Former Gallaher's Cigarette Factory site, at the junction of Airton Road and Greenhills Road, Tallaght, Dublin 24
Proposed Development:
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations). Condition 18; 18 (a) Prior to commencement of development the developer shall submit the following details to the planning authority for written agreement: (i) Revised surface water drainage calculations, conveyance and attenuation details (where required) to meet the surface water storage requirements of the development. (ii) Full design details (including cross section) for the proposed outfall discharging surface water into the Poddle River to the south of the site. The drawing shall show the invert of the proposed outfall in relation to the closest known river flood level for the 1 in 10, 1 in 100 and 1 in 1000-year river flood event. 18 (b) Prior to commencement of development a Stage 2 – Detailed Design Stage Storm Water Audit shall be submitted to the planning authority for written agreement.
Decision Due:
08/08/2022

Documents