View Application SHD3ABP-305763-19C25

View Application SHD3ABP-305763-19C25

Date Received:
14/06/2022
Last Action:
14/06/2022
Application Type:
Compliance with Conditions
Submission Type:
Compliance - Planning
Closing Date for Submissions:
Closed
Applicant:
Power Scaffolding Supplies Limited
Location:
Site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35
Proposed Development:
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m) , a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground. Condition 25; Prior to commencement of development the developer shall submit, for the written agreement of the planning authority, a schedule of Ecological Mitigation Measures, as detailed in the Preliminary Ecological Appraisal and as detailed in the Bat Report submitted with the application. The schedule shall set out the timeline for implementation of each measure and assign responsibility for implementation. All of the mitigation measures shall be implemented in full and within the timescales stated.
Decision Due:
08/08/2022